IP Library Granted Patent US 7,275,357
Granted Patent B2
US 7,275,357 · App. 11/093,856 · Granted Oct 2, 2007

Cotton module program control using yield monitor signal

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,275,357
App. No.
11/093,856
Granted
Oct 2, 2007
Kind
B2
Abstract

A control and method for a cotton module building program for an on-board cotton module builder of a cotton harvester, which utilizes a signal or output from a yield monitor as a factor in determining and varying cotton module building parameters, which can include auger direction and duration of operation, compactor positions and compacting strokes for best compacting a cotton module under the yield conditions. A module complete signal which can be a visual or audio signal, can be outputted when the yield monitor detects a predetermined cotton module weight, for signaling approach of a required unloading of a cotton module.

Claims (21)

1. A method of operation of an on-board cotton module builder of a cotton harvesting machine, comprising steps of:

determining a value representative of a cotton yield as a function of a signal outputted by a cotton yield monitor during a compaction cycle and as long as the conditions for a complete module block have not been satisfied;

determining a run time for an auger for distributing cotton within the module builder, at least partially as a function of the determined value;

determining a number of compaction strokes of a cotton compactor of the module builder, at least partially as a function of the determined value; and

setting the position of the cotton compactor within a compactor chamber of the cotton module builder, at least partially a function of the determined value.

2. The method of claim 1 , comprising a further step of outputting a module complete signal when a cotton module being built by the module builder is complete.

3. The method of claim 2 , wherein a module being built by the module builder is determined to be complete when the module exceeds a predetermined weight.

4. The method claim 1 , comprising a step of determining a direction of operation of the auger at least partially as a function of the determined value.

5. A method of operation of an on-board cotton module builder of a cotton harvesting machine, comprising steps of:

providing a controller operable for controlling direction of rotation and run time for an auger for distributing cotton within the module builder and a number of compaction strokes of a cotton compactor of the module builder; and

determining a run time for the auger for distributing cotton within the module builder and a number of compaction strokes of the cotton compactor bused at least in part on a yield setting inputted to time controller, the yield setting is inputted to the controller during the compaction cycle and only as long as the conditions for a complete module block have not been satisfied, wherein the controller is operable for determining compacting positions for the cotton compactor as a function of the yield setting.

6. The method of claim 5 , wherein the yield setting is operator controlled.

7. The method of claim 5 , wherein the yield setting is determined at least in part by a cotton yield monitor.

8. The method of claim 5 , wherein the controller is operable for determining and changing directions of operation of the auger as a function of the yield setting.

9. The method of claim 5 , wherein the controller is operable for varying a frequency of the compaction strokes of the cotton compactor as a function of the yield setting.

10. The method of claim 5 , wherein the controller is operable for varying lengths of the compaction strokes of the cotton compactor as a function of the yield setting.

11. A method of operation of an on-board cotton module builder of a cotton harvesting machine, comprising steps of;

varying duration and direction of rotation of an auger for distributing cotton within the module builder, as a function of yield conditions during a compaction cycle wherein the conditions for a complete module block have not been satisfied;

varying a number and a duration of compaction strokes of a cotton compactor of the module builder, as a function of yield conditions during a compaction cycle wherein the conditions for a complete module block have not been satisfied; and

setting the position of the cotton compactor within a compacting chamber of the cotton module builder, as a function of yield conditions during a compaction cycle wherein the conditions for a complete module block have not been satisfied.

12. The method of claim 11 , comprising a further step of outputting a module complete signal when a cotton module being built by the module builder is complete or nearly complete.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 11, 2007
From: CNH AMERICA LLC
To: BLUE LEAF I.P. INC.
Reel/Frame 020227/0024 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 4, 2005
From: LEMKE, DWIGHT D.
To: CNH AMERICA LLC
Reel/Frame 016190/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 30, 2005
From: COVINGTON, MICHAEL J.; ORSBORN, JESSE H.
To: CNH AMERICA LLC
Reel/Frame 016730/0024 →