IP Library Granted Patent US 7,161,329
Granted Patent B2
US 7,161,329 · App. 11/109,598 · Granted Jan 9, 2007

Generator controlling system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,161,329
App. No.
11/109,598
Granted
Jan 9, 2007
Kind
B2
Abstract

The operation of a generator and the loads placed on the generator are controlled in response to measuring the loads and generator operating parameters and controllably altering the operating conditions in response to comparison of the measurements to respective set points.

Claims (16)

1. In a generator controlling system having apparatus for measuring a plurality of operating parameters of the generator and delivering operating parameter signals responsive to said measurements to a controller and a plurality of load apparatus adapted to operate on electrical power received from the generator, the improvement comprising:

a power distribution unit connected to and controllably delivers power from the generator to the plurality of load apparatus, said power distribution unit having apparatus for continuously measuring the electrical power delivered to each load apparatus and delivering a load signal responsive to each respective measurement; and

a controller connected to the generator and to the power distribution unit; said controller being adapted to receive generator operating parameter signals and load signals, comparing the signals to respective set points and delivering respective controlling signals to the power distribution unit in response to said comparison.

2. A generator controlling system, as set forth in claim 1 , including a first remote controller connected to the controller and being adapted t manually actuate and terminate power from the generator to respective load apparatus via said power distribution unit.

3. A generator controlling system, as set forth in claim 2 , including a second remote controller remotely positioned from said first remote controller, said second manual operating system being adapted to manually actuate and terminate power from the generator to respective selected load apparatus via said power distribution unit.

4. A generator controlling system, as set forth in claim 1 , wherein the controller includes priority selecting apparatus adapted to receive the respective load signals from the power distribution unit, comparing the load signals to respective set points, deliver a respective priority signal in response to an undesirable load signal relative to its respective set point, comparing each priority signal to a preselected priority list and controllably delivering a load apparatus power termination signal to the power distribution unit in a preselected order responsive to the priority list comparison.

5. A generator controlling system, as set forth in claim 4 , wherein the priority list contains a termination block on at least one load apparatus.

6. A generator controlling system, as set forth in claim 4 , wherein the priority list contains a termination block on a plurality of load apparatus.

7. A generator controlling system, as set forth in claim 4 , wherein the priority selecting apparatus is adapted to receive the operating parameter signals from the generator, compare each of the operating parameter signals to a respective set point, deliver a respective priority signal in response to an undesirable operating parameter signal comparison to its respective set point, comparing each priority signal to a preselected priority list and controllably deliver a load apparatus power termination signal to the power distribution unit in a preselected order responsive to the priority list comparison.

8. A generator controlling system, as set forth in claim 7 , wherein the priority list contains a termination block on at least one load apparatus.

9. A generator controlling system, as set forth in claim 7 , wherein the priority list contains a termination block on a plurality of load apparatus.

10. A generator controlling system, as set forth in claim 7 , wherein the priority selecting apparatus receives a initial start up signal from the generator, blocks all power delivered by the generator until the comparison of each of the operating parameter signals to their respective set point is within desirable limits and controllably delivers power to the plurality load apparatus in a preselected order.

11. A generator controlling system, as set forth in claim 10 , wherein the power is delivered consecutively to the plurality load apparatus at preselected timed intervals.

12. In a generator controlling system, as set forth in claim 1 , wherein the controller is adapted to signal the generator and terminate mechanical driving of the generator.

13. In a generator controlling system, as set forth in claim 12 , wherein the controller is adapted to signal the generator and actuate mechanical driving of the generator.

14. In a generator controlling system, as set forth in claim 1 , wherein the controller is adapted to signal the generator and actuate mechanical driving of the generator.

Assignments (13)
RELEASE OF SECOND LIEN SECURITY INTEREST IN PATENTS (RELEASES RF 045350/0405) Recorded Feb 16, 2024
From: UBS AG, STAMFORD BRANCH, AS COLLATERAL AGENT
To: ROM ACQUISITION CORPORATION
Reel/Frame 066624/0187 →
RELEASE OF FIRST LIEN SECURITY INTEREST IN PATENTS (RELEASES RF 045350/0372) Recorded Feb 15, 2024
From: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
To: ROM ACQUISITION CORPORATION
Reel/Frame 066613/0225 →
SECURITY INTEREST Recorded Feb 13, 2024
From: ROM ACQUISITION CORPORATION
To: KKR LOAN ADMINISTRATION SERVICES LLC
Reel/Frame 066567/0001 →
SECURITY INTEREST Recorded Feb 16, 2018
From: ROM ACQUISITION CORPORATION
To: UBS AG, STAMFORD BRANCH, AS COLLATERAL AGENT
Reel/Frame 045350/0405 →
SECURITY INTEREST Recorded Feb 16, 2018
From: ROM ACQUISITION CORPORATION
To: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
Reel/Frame 045350/0372 →
RELEASE OF SECURITY INTEREST Recorded Feb 1, 2018
From: BNP PARIBAS
To: ROM ACQUISITION CORPORATION; FIRE RESEARCH CORP.; IEM, INC.; SPECIALTY MANUFACTURING, INC.; ELKHART BRASS MANUFACTURING COMPANY, INC.; REAR VIEW SAFETY INC.; RANDALL MANUFACTURING LLC
Reel/Frame 045234/0663 →
RELEASE OF SECURITY INTEREST Recorded Feb 1, 2018
From: OCM FIE, LLC
To: ROM ACQUISITION CORPORATION; FIRE RESEARCH CORP.; IEM, INC.; SPECIALTY MANUFACTURING, INC.; ELKHART BRASS MANUFACTURING COMPANY, INC.; REAR VIEW SAFETY INC.; RANDALL MANUFACTURING LLC
Reel/Frame 045234/0627 →
GRANT OF SECOND LIEN PATENT SECURITY INTEREST Recorded Oct 15, 2013
From: ROM ACQUISITION CORPORATION
To: OCM FIE, LLC, AS ADMINISTRATIVE AGENT
Reel/Frame 031413/0458 →
GRANT OF PATENT SECURITY INTEREST Recorded Oct 11, 2013
From: ROM ACQUISITION CORPORATION
To: BNP PARIBAS, AS ADMINISTRATIVE AGENT
Reel/Frame 031396/0012 →
PATENT RELEASE AND REASSIGNMENT OF REEL/FRAME NO. 029575/0314 Recorded Oct 10, 2013
From: NXT CAPITAL, LLC, AS AGENT
To: ROM ACQUISITION CORPORATION
Reel/Frame 031395/0384 →
SECURITY AGREEMENT Recorded Jan 7, 2013
From: ROM ACQUISITION CORPORATION
To: NXT CAPITAL, LLC, AS AGENT
Reel/Frame 029575/0314 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 31, 2012
From: JNT-LINK, LLC (ALSO KNOWN AS JNT LINK, LLC)
To: ROM ACQUISITION CORPORATION
Reel/Frame 029548/0047 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 1, 2010
From: MCLOUGHLIN, JOHN E.; ATHANASIADES, NEOCLES G.; TOH, KIAM MENG
To: JNT LINK, LLC
Reel/Frame 024915/0877 →