IP Library Granted Patent US 7,462,272
Granted Patent B2
US 7,462,272 · App. 11/163,761 · Granted Dec 9, 2008

Process for multiple stage direct electrowinning of copper

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,462,272
App. No.
11/163,761
Granted
Dec 9, 2008
Kind
B2
Abstract

A system and process for recovering copper from a copper-containing ore, concentrate, or other copper-bearing material to produce high quality cathode copper from a leach solution without the use of copper solvent/solution extraction techniques or apparatus. A process for recovering copper from a copper-containing ore generally includes the steps of providing a feed stream containing comminuted copper-containing ore, concentrate, or other copper-bearing material, leaching the feed stream to yield a copper-containing solution, conditioning the copper-containing solution through one or more physical or chemical conditioning steps, and electrowinning copper directly from the copper-containing solution in multiple electrowinning stages, without subjecting the copper-containing solution to solvent/solution extraction prior to electrowinning.

Claims (32)

1. A method of recovering copper from a copper-bearing material, comprising the steps of:

providing a feed stream containing copper-containing material and acid;

subjecting the feed stream to pressure leaching at a temperature of from about 100° C. about 250° C. to yield a product slurry comprising a copper-bearing solution and a residue;

conditioning said product slurry through one or more chemical or physical conditioning steps to yield a copper-containing solution suitable for electrowinning;

electrowinning copper from at least a portion of said copper-containing solution in a first electrowinning stage to produce copper cathode and a first stage lean electrolyte stream, without subjecting the copper-containing solution to solvent/solution extraction;

electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage to produce copper cathode and a second stage lean electrolyte stream; and

recycling at least a portion of said first stage lean electrolyte stream to said pressure leaching step.

2. The method of claim 1 , wherein said step of providing a feed stream comprising a copper-bearing material comprises providing a feed stream comprising a copper-bearing sulfide ore, concentrate, or precipitate.

3. The method of claim 1 , wherein said step of providing a feed stream comprising a copper-bearing material comprises providing a feed stream comprising at least one of chalcopyrite, chalcocite, bornite, covellite, digenite, and enargite, or mixtures or combinations thereof.

4. The method of claim 1 , wherein said step of providing a feed stream comprising a copper-bearing material comprises providing a feed stream comprising a copper-bearing material and a solution stream comprising copper and acid.

5. The method of claim 1 , further comprising the step of separating at least a portion of said copper-containing material from said acid in said feed stream to yield a copper-containing feed stream comprising a copper-bearing material.

6. The method of claim 5 , wherein said separating step comprises reacting at least a portion of the copper in a copper-containing electrolyte stream to precipitate at least a portion of said copper in said copper-containing electrolyte stream as copper sulfide in said feed stream.

7. The method of claim 5 , wherein said separating step comprises reacting at least a portion of the copper in a copper-containing electrolyte stream in the presence of sulfur dioxide, whereby at least a portion of said copper in said copper-containing electrolyte stream precipitates as copper sulfide in said feed stream.

8. The method of claim 1 , wherein said leaching step comprises leaching at least a portion of said feed stream in a pressure leaching vessel at a temperature of from about 140° C. about 180° C. and at a total operating pressure of from about 100 psi to about 750 psi.

9. The method of claim 1 , wherein said leaching step comprises leaching at least a portion of said feed stream in a pressure leaching vessel at a temperature of from about 200° C. about 235° C. and at a total operating pressure of from about 100 psi to about 750 psi.

10. The method of claim 1 , wherein said step of pressure leaching said feed stream comprises pressure leaching said feed stream in the presence of a surfactant selected from the group consisting of lignin derivatives, orthophenylene diamine, alkyl sulfonates, and mixtures thereof.

11. The method of claim 1 , wherein said step of pressure leaching said feed stream comprises pressure leaching said feed stream in the presence of a surfactant in an amount of from about 2 to about 20 kilograms per tonne of concentrate in the copper-containing feed stream.

12. The method of claim 1 , wherein said conditioning step further comprises blending at least a portion of said copper-containing solution with at least a portion of a copper-containing electrolyte stream to achieve a copper concentration of from about 15 to about 80 grams/liter in said copper-containing solution.

13. The method of claim 1 , wherein said conditioning step comprises subjecting at least a portion of said product slurry to solid-liquid separation, wherein at least a portion of said copper-bearing solution is separated from said residue.

14. The method of claim 1 , wherein said conditioning step further comprises blending at least a portion of said copper-bearing solution with at least a portion of one or more copper-bearing streams to achieve a desired copper concentration in said copper-bearing solution.

15. The method of claim 1 , wherein said step of electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage comprises electrowinning copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

16. The method of claim 5 , wherein said step of electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage comprises electrowinning copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

17. The method of claim 1 , further comprising the step of using a portion of said second stage lean electrolyte stream in a leaching operation.

18. The method of claim 5 , further comprising the step of recycling a portion of said second stage lean electrolyte stream to said separating step.

19. A method of recovering copper from a copper-bearing material, comprising the steps of:

providing a feed stream containing copper-containing material and acid;

subjecting the copper-containing feed stream to pressure leaching to yield a product slurry comprising a copper-bearing solution and a residue;

conditioning the product slurry through one or more chemical or physical conditioning steps to yield a copper-containing solution suitable for electrowinning;

electrowinning copper from the copper-containing solution in a first electrowinning stage to produce copper cathode and a first stage lean electrolyte stream, without subjecting the copper-containing solution to solvent/solution extraction;

recycling a portion of said first stage lean electrolyte stream to said pressure leaching step;

electrowinning copper from a portion of said first stage lean electrolyte stream in a second electrowinning stage to produce copper cathode and a second stage lean electrolyte stream;

recycling a portion of said second stage lean electrolyte stream to said pressure leaching step.

Assignments (4)
CHANGE OF NAME Recorded Jul 23, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT MINERALS CORPORATION
Reel/Frame 033389/0300 →
MERGER Recorded Jul 17, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 033357/0849 →
CHANGE OF NAME Recorded Jul 30, 2009
From: PHELPS DODGE CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 023015/0851 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 28, 2005
From: MARSDEN, JOHN O; BREWER, ROBERT E; ROBERTSON, JOANNA M; BAUGHMAN, DAVID R; THOMPSON, PHILIP; HAZEN, WAYNE W; BEMELMANS, CHRISTEL MA
To: PHELPS DODGE CORPORATION
Reel/Frame 016702/0746 →