Granted Patent B2
US 7,587,887 · App. 11/167,468 · Granted Sep 15, 2009

Advanced humid air turbine power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,587,887
App. No.
11/167,468
Granted
Sep 15, 2009
Kind
B2
Abstract

An advanced humid air turbine power plant capable of suppressing condensation of moisture in a cooling channel, which is provided to cool a high-temperature component of a gas turbine, in a start up stage, a coast down stage, and a load varying state of the gas turbine. In the advanced humid air turbine power plant comprising a compressed air supply line for supplying compressed air generated by a compressor to the high-temperature component of the gas turbine, and a humidified air supply line for supplying humidified air generated in a humidifying tower to the high-temperature component of the gas turbine, the power plant further comprises valves capable of adjusting respective air flow rates in the compressed air supply line and the humidified air supply line. A coolant is switched over from the compressed air to the humidified air in the start up stage and the load increasing stage of the gas turbine, and from the humidified air to the compressed air in the load decreasing stage and the coast down stage, as well as in the event of an abnormality in a humidifying line.

Claims (12)

1. An advanced humid air turbine power plant comprising a compressor for compressing air, a humidifying tower for humidifying compressed air introduced from said compressor, a combustor for burning fuel and humidified air supplied from said humidifying tower, a gas turbine driven by combustion gases generated in said combustor, a recuperator for performing heat exchange between exhaust gases discharged from said combustor and the humidified air supplied to said combustor, a compressed air supply line for supplying, as cooling air, the compressed air generated by said compressor to a high-temperature component of said gas turbine, and a humidified air supply line for supplying the humidified air added with moisture in said humidifying tower to the high-temperature component of said gas turbine,

wherein said power plant further comprises a compressed air supply valve for adjusting a flow rate of the compressed air supplied, as cooling air, to the high-temperature component of the gas turbine via said compressed air supply line, and a humidified air supply valve for adjusting a flow rate of the humidified air supplied, as cooling air, to the high-temperature component of the gas turbine via said humidified air supply line, the humidified air being the sole delivered coolant during normal operation under load;

wherein in the event of an abnormality in said humidified air supply line, a supply source of the gas turbine cooling air is switched over from said humidified air supply line to said compressed air supply line and a load of the gas turbine is decreased.

2. The advanced humid air turbine power plant according to claim 1 , wherein, in a start up stage or a load increasing stage of said gas turbine, a supply source of the gas turbine cooling air is switched over from said compressed air supply line to said humidified air supply line.

3. The advanced humid air turbine power plant according to claim 1 , wherein, in a start up stage or a load increasing stage of said gas turbine, a supply source of the gas turbine cooling air is switched over from said compressed air supply line alone to both of said humidified air supply line and said compressed air supply line.

4. The advanced humid air turbine power plant according to claim 1 , wherein, in a start up stage or a load increasing stage of said gas turbine, a supply source of the gas turbine cooling air is switched over from said compressed air supply line to said humidified air supply line when a temperature in the high-temperature component of said gas turbine or an estimated temperature in the high-temperature component of said gas turbine obtained from a temperature at a location substituted for the high-temperature component of said gas turbine rises above a coolant temperature.

5. The advanced humid air turbine power plant according to claim 1 , wherein, in a load decreasing stage or a coast down stage of said gas turbine, a supply source of the gas turbine cooling air is switched over from said humidified air supply line to said air compressed supply line.

6. The advanced humid air turbine power plant according to claim 1 , wherein, the load of the gas turbine is decreased and the gas turbine comes into a load state where the temperature in the high-temperature component of the gas turbine can be held not higher than the allowable value by the cooling with only compressed air from the compressed air supply line.

7. The advanced humid air turbine power plant according to claim 1 , wherein, in the event of an abnormality in said humidified air supply line, a supply source of the gas turbine cooling air is switched over from said humidified air supply line to said compressed air supply line when at least one of humidity and pressure of the humidified air reduces to a level not higher than a certain threshold.

8. The advanced humid air turbine power plant according to claim 1 ,

wherein said power plant further comprises an inert gas supply line for supplying, as coolant, an inert gas to the high-temperature component of said gas turbine.

9. The advanced humid air turbine power plant according to claim 8 , wherein, in a load decreasing stage or a coast down stage of said gas turbine, a supply source of the gas turbine cooling air is switched over from said compressed air supply line or said humidified air supply line to said inert gas supply line.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
CHANGE OF NAME Recorded May 20, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 032936/0757 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 11, 2008
From: HORIUCHI, YASUHIRO; MARUSHIMA, SHINYA; ARAKI, HIDEFUMI; HATAMIYA, SHIGEO
To: HITACHI, LTD.
Reel/Frame 021226/0555 →