IP Library Granted Patent US 8,391,102
Granted Patent B2
US 8,391,102 · App. 11/213,246 · Granted Mar 5, 2013

Automatic systems and methods for positioning marine seismic equipment

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,391,102
App. No.
11/213,246
Granted
Mar 5, 2013
Kind
B2
Abstract

Systems and methods for automatic steering of marine seismic towing vessels are described. One system comprises a towing vessel, a seismic source, and optionally one or more seismic streamers towed by the towing vessel; a steering sub-system for steering the vessel, the sub-system including a vessel steering algorithm for calculating an optimum vessel steering path; and a controller to produce a difference between a measured position of a tracking point with a pre-plot position of the tracking point, and calculate a set point based on the difference to the steering algorithm. It is emphasized that this abstract is provided to comply with the rules requiring an abstract, allowing a searcher or other reader to quickly ascertain the subject matter of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims. 37 CFR 1.72(b).

Claims (32)

1. A system comprising:

a marine seismic spread comprising a towing vessel and a seismic spread element towed by the vessel, the seismic spread element comprising a steering mechanism; and

a control subsystem adapted to determine a first difference between a tracking point of the seismic spread and a position from a pre-determined path, determine a new track based on the first difference, determine a second difference between the new track and a measured track, and selectively steer the vessel and the steering mechanism of the seismic spread element based at least in part on the second difference.

2. The system of claim 1 , wherein the control subsystem is adapted to selectively steer the steering mechanism of the seismic spread element in a lateral direction relative to a direction in which the towing vessel tows the seismic spread element.

3. The system of claim 2 , wherein the steering mechanism comprises a steerable bird.

4. The system of claim 1 , wherein the seismic spread element comprises a streamer or a seismic source.

5. The system of claim 1 , wherein the control subsystem is adapted to steer the vessel to coarsely position the tracking point with respect to the path and steer the steering mechanism of the seismic spread element to finely tune the tracking point with respect to the predetermined path.

6. The system of claim 1 , wherein the control subsystem comprises an autopilot adapted to steer the vessel and a tracking control device adapted to provide a set point vessel position and heading to the autopilot.

7. The system of claim 1 , further comprising:

wherein the control subsystem is operatively connected to one or more sensors for measuring the position of the tracking point.

8. The system of claim 1 , wherein the towing vessel comprises one or more current measuring devices, and the control subsystem further bases the steering of the vessel and the steering mechanism on at least one measurement provided by said at least one or more current measuring devices.

9. The system of claim 1 , wherein the control subsystem further bases the steering of the vessel and the steering mechanism on one or more of the following control techniques: feed forward, cascade, internal feedback, model predictive, neural networks and Kalman filtering.

10. The system of claim 1 , wherein the control subsystem comprises at least one PID controller.

11. A method comprising:

using at least one towing vessel to tow a seismic spread element;

determining a first difference between a tracking position of the seismic spread and a position along a predetermined path;

based at least in part on the first difference, determining a new track for the seismic spread element;

determining a second difference between the new track and a measured track of the seismic spread element; and

selectively steering the vessel and selectively steering a steering mechanism of the seismic spread element based at least in part on the second difference.

12. The method of claim 11 , wherein the act of steering comprises steering a streamer positioning device.

13. The method of claim 11 , wherein the seismic spread element comprises a streamer or a seismic source.

14. The method of claim 11 , wherein the act of selectively steering comprises:

coarsely positioning the tracking point with respect to the path, comprising steering the vessel; and

finely positioning the tracking point with respect to the path, comprising steering the steering mechanism of the seismic spread element.

15. The method of claim 11 ,

wherein the seismic spread element further comprises at least one seismic receiver and seismic source; and

wherein the act of steering the steering mechanism of the seismic spread element further comprises positioning the seismic receiver and the seismic source independently to respective paths.

16. The method of claim 11 , wherein the act of steering the steering mechanism of the seismic spread element comprises laterally steering the steering mechanism relative to a direction in which said at least one towing vessel tows the seismic spread element.

17. The method of claim 11 , further comprising:

further basing the steering on measurements of the position of the tracking point.

18. The method of claim 11 , further comprising:

further basing the steering on a measurement provided by a current measuring device.

Assignments (3)
CHANGE OF ADDRESS Recorded Jan 20, 2020
From: REFLECTION MARINE NORGE AS
To: REFLECTION MARINE NORGE AS
Reel/Frame 052109/0147 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 27, 2019
From: WESTERNGECO L.L.C.
To: REFLECTION MARINE NORGE AS
Reel/Frame 051428/0580 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 26, 2005
From: HOLO, ANDREAS THIBLIN
To: WESTERNGECO, L.L.C.
Reel/Frame 016944/0699 →