IP Library Granted Patent US 7,419,001
Granted Patent B2
US 7,419,001 · App. 11/216,227 · Granted Sep 2, 2008

Universal tubing hanger suspension assembly and well completion system and method of using same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,419,001
App. No.
11/216,227
Granted
Sep 2, 2008
Kind
B2
Abstract

A tubing hanger suspension assembly for an oil and gas well completion system and a method of installing same. The tubing hanger suspension assembly includes a tubing hanger housing which is positioned in the wellhead housing. The tubing hanger assembly includes a sealing and lockdown mechanism capable of providing sealing and load support of the production tubing in the production casing string. A stab sub assembly connected to the upper end of the tubing hanger suspension assembly and lower end of the Christmas tree assembly provides downhole hydraulic and electric functionality and annulus access to the production tubing.

Claims (84)

1. A tubing hanger assembly for use in a well having a wellhead housing and a production casing string extending down a well bore, the tubing hanger assembly comprising:

a tubing hanger housing having a production bore therethrough;

a production tubing string connected to said tubing hanger housing, said production tubing string having a production bore in fluid communication with said tubing hanger housing production bore;

a lower assembly at a lower end of said tubing hanger housing, said lower assembly including a bore therethrough, a sealing apparatus and a movement prevention locking apparatus, said production tubing string extending through said lower assembly bore, said sealing apparatus adapted to form a fluid-tight seal between said lower assembly and the production casing string, and said movement prevention locking apparatus adapted to lock said lower assembly to the production casing string.

2. The tubing hanger assembly of claim 1 , wherein said lower assembly includes a lower member and said sealing apparatus is adapted to form said fluid-tight seal between said lower member and the production casing string.

3. The tubing hanger assembly of claim 1 , wherein said lower assembly includes a lower member and said sealing apparatus has a sealed condition and an unsealed condition, said sealed condition includes a fluid-tight seal formed between the production casing string and said lower member.

4. The tubing hanger assembly of claim 2 , wherein said movement prevention locking apparatus is adapted to lock said lower member to the production casing string.

5. The tubing hanger assembly of claim 1 , wherein said tubing hanger housing is adapted to be freestanding in the wellhead housing.

6. The tubing hanger assembly of claim 1 , wherein said tubing hanger housing is adapted to be solely vertically supported via said lower assembly.

7. The tubing hanger assembly of claim 6 , wherein said tubing hanger housing vertical support is provided by the engagement of said movement prevention locking apparatus with the production casing string.

8. The tubing hanger assembly of claim 1 , wherein said production tubing string extending through said lower assembly bore defines a lower assembly tubing annulus.

9. The tubing hanger assembly of claim 8 , wherein said tubing hanger housing includes an annulus passageway in fluid communication with said lower assembly tubing annulus.

10. The tubing hanger assembly of claim 1 , wherein said production tubing string has a tubing string length and said lower assembly has a lower assembly length, and said lower assembly length is less than 50% of said tubing string length.

11. The tubing hanger assembly of claim 1 , wherein said production tubing string has a tubing string length and said lower assembly has a lower assembly length, and said lower assembly length is less than 25% of said tubing string length.

12. The tubing hanger assembly of claim 1 , wherein said production tubing string has a tubing string length and said lower assembly has a lower assembly length, and said lower assembly length is less than 15% of said tubing string length.

13. The tubing hanger assembly of claim 1 , wherein said lower assembly has a length in the range of 1′ to 1,500′.

14. The tubing hanger assembly of claim 1 , wherein said lower assembly has a length in the range of 1′ to 300′.

15. The tubing hanger assembly of claim 1 , wherein said lower assembly has a length in the range of 5′ to 100′.

16. The tubing hanger assembly of claim 1 , wherein said tubing hanger housing is adapted for a range of vertical elevations relative to the wellhead housing.

17. The tubing hanger assembly of claim 1 , further comprising a second sealing apparatus and a second movement prevention locking apparatus on said lower assembly, said second sealing apparatus adapted to form a fluid-tight seal between said lower assembly and the production casing string, and said second movement prevention locking apparatus adapted to lock said lower assembly to the production casing string.

18. A well completion system comprising:

a wellhead housing;

a production casing string received in said wellhead housing and extending down a well bore;

a tubing hanger assembly including a tubing hanger housing, a lower assembly and a depending tubing string connected to said tubing hanger housing, said lower assembly comprising:

a lower member connected to said tubing hanger housing; and

a sealing apparatus attached to said lower member,

wherein a portion of said tubing string extends through said lower assembly and said sealing apparatus is adapted to form a fluid and gas-tight seal between said production casing string and said lower assembly.

19. The well completion system of claim 18 , wherein said sealing apparatus has a sealed condition and an unsealed condition, said sealed condition includes a fluid and gas-tight seal formed between said production casing string and said lower member.

20. The well completion system of claim 19 , wherein said sealing apparatus can be activated from said unsealed to sealed condition and from said sealed to unsealed condition.

21. The well completion system of claim 18 , further comprising a movement prevention locking apparatus adapted to lock said lower assembly to said production casing string.

22. The well completion system of claim 21 , wherein said movement prevention locking apparatus has a locked condition and an unlocked condition, said movement prevention locking apparatus can be activated from said unlocked to locked condition and from said locked to unlocked condition.

23. The well completion system of claim 21 , wherein said tubing hanger housing is adapted to be solely vertically supported via said lower assembly.

24. The well completion system of claim 23 , wherein said tubing hanger housing vertical support is provided by the engagement of said movement prevention locking apparatus with said production casing string.

25. The well completion system of claim 18 , further comprising:

a casing banger attached to said production casing string; and

a stop apparatus attached to said tubing hanger housing, said stop apparatus cooperating with said casing hanger to limit downward movement of said tubing hanger housing.

26. The well completion system of claim 25 , wherein said stop apparatus is adjustable in length.

27. The well completion system of claim 18 , further comprising:

said tubing hanger housing having a production bore and an annulus bore;

a tree assembly having a production bore and an annulus bore, said tree assembly mounting to said wellhead housing; and

a stab sub assembly having a first end connected to said tree assembly and a second end connected to said tubing hanger housing, said stab sub assembly having a production bore providing fluid communication between said production bores of said tree assembly and said tubing hanger housing, and said stab sub assembly having an annulus bore providing fluid communication between said annulus bores of said tree assembly and said tubing hanger housing.

28. The well completion system of claim 27 , wherein said tubing hanger housing is adapted for a range of vertical elevations relative to said wellhead housing.

29. The well completion system of claim 27 , wherein said portion of said tubing string extending through said lower assembly extends through a bore in said lower member and defines a lower assembly tubing annulus, said lower assembly tubing annulus being in fluid communication with said annulus bore of said tubing hanger housing.

30. The well completion system of claim 27 , wherein said tubing string has a tubing string length and said lower assembly has a lower assembly length, and said lower assembly length is less than 25% of said tubing string length.

31. A well completion system comprising:

a wellhead housing;

a production casing string received in said wellhead housing and extending down a well bore;

a tubing hanger assembly including a tubing hanger housing, a lower assembly and a depending tubing string connected to said tubing hanger housing, said lower assembly comprising:

a lower member connected to said tubing hanger housing; and

a movement prevention locking apparatus attached to said lower member;

wherein a portion of said tubing string extends through said lower assembly and said movement prevention locking apparatus is adapted to vertically lock said lower assembly to said production casing string.

32. The well completion system of claim 31 , wherein said movement prevention locking apparatus has a locked condition and an unlocked condition, said movement prevention locking apparatus can be activated from said unlocked to locked condition and from said locked to unlocked condition.

33. The well completion system of claim 31 , wherein said tubing hanger housing is adapted to be solely vertically supported via said lower assembly.

34. The well completion system of claim 33 , wherein said tubing hanger housing vertical support is provided by the engagement of said movement prevention locking apparatus with said production casing string.

35. A method of installing a tubing hanger assembly ( 10 ) in a wellhead housing ( 14 ) where the wellhead housing ( 14 ) supports a casing hanger ( 18 a ) connected to a casing string ( 18 ), and

wherein said wellhead housing ( 14 ) has a top annular shoulder ( 14 a ) spaced above a top end ( 18 c ) of said casing hanger ( 18 a ), the method comprising the steps of,

installing a blowout preventer (BOP) stack ( 20 ) on top of said wellead housing ( 14 ), said BOP stack ( 20 ) including a ram ( 20 r′ ), said BOP stack having a throughbore greater than or equal to a throughbore of said wellead housing ( 14 ),

providing a tubing hanger running tool ( 30 ) having top and bottom ends and an adjust nut ( 48 ) positioned on a mandrel ( 46 ) at said top end,

providing said tubing hanger assembly ( 10 ) with a tubing hanger housing ( 24 ) having an outer diameter arranged and designed to fit within said throughbore of said wellhead housing ( 14 ) and having a lower tubular member ( 22 ) and sealing and lockdown assembly ( 34 ) carried by said tubing hanger housing ( 24 ) and arranged and designed to fit within said casing string ( 18 ),

latching said bottom end of said running tool ( 30 ) to said tubing hanger assembly ( 10 ),

adjusting said adjust nut ( 48 ) on said mandrel ( 46 ) such that the distance between the bottom of the adjust nut ( 48 ) and the bottom of said tubing hanger housing ( 24 ) approximately equals the distance between a top surface of said ram ( 20 r′ ) and a few inches from said top end ( 18 c ) of said casing hanger ( 18 a ), lowering said tubing hanger assembly ( 10 ) and said running tool ( 30 ) through said bore of said BOP stack ( 20 ),

partially closing said ram ( 20 r′ ) toward said mandrel ( 46 ),

continuing to lower said tubing hanger assembly ( 10 ) and said running tool ( 30 ) until said adjust nut ( 48 ) bottoms out on said partially closed ram ( 20 r′ ) with said tubing hanger housing ( 24 ) positioned within said wellead housing ( 14 ) with said bottom of said tubing hanger housing ( 24 ) positioned a few inches above said top end ( 18 c ) of said casing hanger ( 18 a ).

36. The method of claim 35 wherein

said lower tubular member ( 32 ) and said sealing and lockdown assembly ( 34 ) are carried downward into said easing string ( 18 ) while said tubing hanger assembly ( 10 ) is lowered into said wellhead housing ( 14 ), the method further comprising the step of

locking said tubing hanger assembly ( 10 ) vertically to said casing string ( 18 ) by activating said lockdown assembly ( 34 ) against said interior of said casing string ( 18 ).

37. The method of claim 36 further comprising the step of unlatching said lower end of said running tool ( 30 ) from said tubing hanger assembly ( 10 ),

opening said ram ( 20 r′ ),

and removing said running tool ( 30 ) from said bore of said BOP stack ( 20 ).

38. A method of installing a tubing hanger assembly ( 10 ) in a bore of a wellhead housing ( 14 ) where the wellhead housing ( 14 ) supports a casing hanger ( 18 a ) connected to a production casing string ( 18 ), the method comprising the steps of:

providing said tubing hanger assembly ( 10 ) with a tubing hanger housing ( 24 ) having an outer diameter ranged and designed to fit within said bore of said wellhead housing ( 14 ) and having a tubular member ( 32 ) and lockdown assembly ( 34 ) carried by said tubing hunger housing ( 24 ) and ranged and designed to fit within said production casing string ( 18 ),

lowering said tubing hanger assembly ( 10 ) into said wellhead housing ( 14 ) with said tubing hanger housing ( 24 ) positioned within said wellhead housing ( 14 ) and said tubular member ( 32 ) and said lockdown assembly ( 34 ) positioned within said production casing string ( 18 ) until a bottom surface of said tubing hanger housing ( 24 ) is positioned a few inches above a top end ( 18 c ) of said casing hanger ( 18 a ), and

activating said lockdown assembly ( 34 ) against the interior of said production casing string ( 18 ),

whereby, said tubing hanger housing ( 24 ) and said tubular member ( 32 ) are supported vertically solely by said lockdown assembly ( 34 ) engagement of said production casing string ( 18 a ) at a position below said tubing hanger housing ( 24 ).

39. A well assembly comprising:

a well with a wellhead housing ( 14 ) defining a wellhead bore, a production casing hanger ( 18 a ) having a production casing ( 18 ) coupled thereto, said production casing hanger ( 18 a ) supported within said wellhead housing ( 14 ) with said production casing ( 18 ) extending downwardly into the well;

a tubing hanger housing ( 24 ) placed within said wellhead bore with a tubing hanger lower member ( 32 ) with a lockdown assembly ( 34 ) secured thereto carried by said tubing hanger housing ( 24 ), said tubing hanger lower member ( 32 ) extending downwardly within said production casing ( 18 );

said lockdown assembly ( 34 ) arranged and designed for activation to extend radially outwardly from said tubing hanger lower member ( 32 ) into locking engagement with said production casing ( 18 );

said tubing hanger housing ( 24 ) arranged and designed to carry production tubing ( 22 ) which extends downwardly within said tubing hanger lower member, wherein said tubing hanger lower member ( 32 ) transfers the load of said tubing hanger housing ( 24 ) and said production tubing ( 22 ) to said production casing ( 18 ) independently of said production tubing ( 22 ).

40. A well assembly comprising:

a well with a wellhead housing ( 14 ) defining a wellhead bore with a production casing hanger ( 18 a ) and a production casing ( 18 ) carried therefrom, said production casing hanger ( 18 a ) supported within said wellhead housing ( 14 ) with said production casing ( 18 ) extending downwardly into the well;

a tubing hanger housing ( 24 ) placed within said wellhead bore with a tubing hanger lower member ( 32 ) with a lockdown assembly ( 34 ) secured thereto carried by said tubing hanger housing ( 24 ), said tubing hanger lower member extending downwardly within said production casing ( 18 );

said lockdown assembly ( 34 ) arranged and designed for activation to extend radially outwardly from said tubing hanger lower member ( 32 ) into locking engagement with said production casing ( 18 );

said tubing hanger housing ( 24 ) positioned axially within said wellhead housing ( 14 ) so that when said lockdown assembly ( 34 ) is activated, said tubing hanger housing ( 24 ) and said tubular member ( 32 ) are supported axially solely by said lockdown assembly ( 34 ) in engagement with said production casing ( 18 ).

Assignments (26)
SECURITY INTEREST Recorded Apr 1, 2025
From: INNOVEX DOWNHOLE SOLUTIONS, LLC; INNOVEX INTERNATIONAL, INC.; TERCEL OILFIELD PRODUCTS USA L.L.C.; DOWNHOLE WELL SOLUTIONS, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 070692/0509 →
SECURITY INTEREST Recorded Dec 20, 2024
From: INNOVEX DOWNHOLE SOLUTIONS, LLC; INNOVEX INTERNATIONAL, INC.; TERCEL OILFIELD PRODUCTS USA L.L.C.; TOP-CO INC.
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 069746/0780 →
CHANGE OF NAME Recorded Oct 16, 2024
From: DRIL-QUIP, INC.
To: INNOVEX INTERNATIONAL, INC.
Reel/Frame 069175/0551 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2020
From: PROSERV OPERATIONS, LLC
To: DRIL-QUIP, INC.
Reel/Frame 054606/0312 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENT COLLATERAL Recorded Mar 22, 2018
From: RIVERSTONE V ACQUISITION HOLDINGS LTD.
To: PROSERV OPERATIONS, INC.
Reel/Frame 045663/0904 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Mar 20, 2018
From: UBS AG, STAMFORD BRANCH
To: RIVERSTONE V ACQUISITION HOLDINGS LTD.
Reel/Frame 045662/0200 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENT COLLATERAL Recorded Mar 8, 2018
From: HSBC BANK USA, NATIONAL ASSOCIATION
To: PROSERV OPERATIONS, INC.
Reel/Frame 045538/0279 →
SECURITY INTEREST Recorded Apr 14, 2015
From: PROSERV OPERATIONS INC.; PROSERV UK LIMITED
To: HSBC BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 035404/0208 →
SECURITY INTEREST Recorded Apr 14, 2015
From: PROSERV OPERATIONS INC.
To: UBS AG, STAMFORD BRANCH, AS COLLATERAL AGENT
Reel/Frame 035404/0603 →
CHANGE OF NAME Recorded Mar 18, 2015
From: PROSERV OPERATIONS LLC
To: PROSERV EMPLOYING LLC
Reel/Frame 035223/0157 →
CHANGE OF NAME Recorded Mar 18, 2015
From: PROSERV OPERATIONS INC.
To: PROSERV OPERATIONS LLC
Reel/Frame 035191/0852 →
MERGER AND CHANGE OF NAME Recorded Mar 18, 2015
From: PROSERV EMPLOYING LLC; PROSERV OPERATIONS INC.
To: PROSERV OPERATIONS INC.
Reel/Frame 035191/0992 →
CHANGE OF NAME Recorded Mar 18, 2015
From: ARGUS SUBSEA INC.
To: ARGUS SUBSEA LLC
Reel/Frame 035223/0128 →
RELEASE OF SECURITY INTEREST Recorded Jan 29, 2015
From: HSBC CORPORATE TRUSTEE COMPANY (UK) LIMITED AS SECURITY AGENT
To: PROSERV GROUP INC.; AZURA ENERGY SYSTEMS OFFSHORE INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 034839/0404 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 26, 2015
From: HSBC CORPORATION TRUSTEE COMPANY (UK) LIMITED
To: PROSERV OPERATIONS, LLC; AZURA ENERGY SYSTEMS OFFSHORE, INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 034810/0135 →
MERGER Recorded May 6, 2013
From: GILMORE VALVE COMPANY; ARGUS SUBSEA LLC; PROSERV OFFSHORE LLC
To: PROSERV OPERATIONS, INC.
Reel/Frame 030353/0045 →
MERGER Recorded May 6, 2013
From: ARGUS SUBSEA LLC; GILMORE VALVE COMPANY; PROSERV OFFSHORE, LLC
To: PROSERV OFFSHORE, INC.
Reel/Frame 030353/0458 →
RELEASE OF SECURITY INTEREST Recorded Jan 8, 2013
From: HAYMARKET FINANCIAL LLP, A SECURITY AGENT
To: AZURA ENERGY SYSTEMS, INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 029586/0764 →
PATENT SECURITY AGREEMENT SUPPLEMENT DATED DECEMBER 8, 2012 Recorded Dec 20, 2012
From: PROSERV OPERATIONS LLC; PROSERV HOLDINGS INC.; PROSERV OFFSHORE INC.; ARGUS SUBSEA LLC; GILMORE VALVE COMPANY; PROSERV INTERNATIONAL HOLDINGS LLC; PROSERV OFFSHORE HOLDINGS, INC.
To: HSBC CORPORATE TRUSTEE COMPANY (UK) LIMITED
Reel/Frame 029529/0937 →
RELEASE OF SECURITY INTEREST Recorded Jul 11, 2011
From: THE ROYAL BANK OF SCOTLAND PLC
To: ARGUS SUBSEA INC.
Reel/Frame 026573/0888 →
SECURITY AGREEMENT Recorded Jul 5, 2011
From: AZURA ENERGY SYSTEMS OFFSHORE, INC.
To: HAYMARKET FINANCIAL LLP, AS SECURITY AGENT
Reel/Frame 026544/0827 →
AMENDED AND RESTATED PATENT SECURITY AGREEMENT SUPPLEMENT Recorded Feb 2, 2010
From: ARGUS SUBSEA INC.
To: THE ROYAL BANK OF SCOTLAND PLC
Reel/Frame 023882/0153 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2009
From: GALATHEA GROUP INC
To: ARGUS SUBSEA INC
Reel/Frame 022764/0917 →
CHANGE OF NAME Recorded May 4, 2009
From: AZURA ENERGY SYSTEMS, INC.
To: AESI HOLDINGS, INC.
Reel/Frame 022634/0106 →
CHANGE OF NAME Recorded May 4, 2009
From: AESI HOLDINGS, INC.
To: GALATHEA GROUP INC.
Reel/Frame 022634/0111 →
SECURITY AGREEMENT Recorded Mar 30, 2009
From: AZURA ENERGY SYSTEMS OFFSHORE, INC.
To: THE ROYAL BANK OF SCOTLAND PLC
Reel/Frame 022469/0318 →