IP Library Granted Patent US 7,265,556
Granted Patent B2
US 7,265,556 · App. 11/237,083 · Granted Sep 4, 2007

System and method for adaptable testing of backplane interconnections and a test tool incorporating the same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,265,556
App. No.
11/237,083
Granted
Sep 4, 2007
Kind
B2
Abstract

The present invention provides a system for, and method of, adaptable testing of backplane interconnections. In one embodiment, the system includes a board detector configured to determine a relative arrangement of a plurality of hardware boards populating positions associated with the backplane interconnections. Additionally, the system also includes a test coordinator coupled to the board detector and configured to adaptively backplane test at least a pair of the plurality of hardware boards based on the relative arrangement.

Claims (28)

1. A system for adaptable testing of backplane interconnections, comprising:

a board detector configured to determine a relative arrangement of a plurality of hardware boards populating positions associated with said backplane interconnections; and

a test coordinator coupled to said board detector and configured to adaptively backplane test at least a pair of said plurality of hardware boards based on said relative arrangement.

2. The system as recited in claim 1 further comprising a test database configured to provide a backplane positions table and a backplane test data table.

3. The system as recited in claim 1 wherein said board detector is further configured to determine whether each of said plurality of hardware boards is usable for backplane testing.

4. The system as recited in claim 3 wherein usability for backplane testing is determined by an addressing test, a path integrity test and a disable test.

5. The system as recited in claim 1 wherein said test coordinator is further configured to execute a predecessor test prior to backplane testing of said pair of said plurality of hardware boards.

6. The system as recited in claim 1 wherein backplane testing provides data necessary to diagnose a fault condition associated with at least one of said backplane interconnections and said plurality of hardware boards.

7. The system as recited in claim 6 wherein said data necessary to diagnose said fault condition is coordinated with a failure database to isolate a cause of said fault condition.

8. A method for adaptable testing of backplane interconnections, comprising:

determining a relative arrangement of a plurality of hardware boards populating positions associated with said backplane interconnections; and

adaptively backplane testing at least a pair of said plurality of hardware boards based on said relative arrangement wherein said testing correlates a fault condition with a hardware board of said plurality of hardware boards.

9. The method as recited in claim 8 further comprising a test database, said determining employing a backplane positions table and said adaptively backplane testing employing a backplane test data table, retrieved from said test database.

10. The method as recited in claim 8 further comprising determining whether each of said plurality of hardware boards is usable for backplane testing.

11. The method as recited in claim 10 wherein usability for backplane testing is determined by an addressing test, a path integrity test and a disable test.

12. The method as recited in claim 8 wherein said adaptively backplane testing is further configured to execute a predecessor test prior to backplane testing of said pair of said plurality of hardware boards.

13. The method as recited in claim 8 wherein backplane testing provides data necessary to diagnose a fault condition associated with at least one of said backplane interconnections and said plurality of hardware boards.

14. The method as recited in claim 13 wherein said data necessary to diagnose said fault condition is coordinated with a failure database to isolate a cause of said fault condition.

15. A test tool, comprising:

a test database that provides a backplane positions table and a backplane test data table;

a system for adaptable testing of backplane interconnections, including:

a board detector that determines a relative arrangement of a plurality of hardware boards populating positions associated with said backplane interconnections, and

a test coordinator, coupled to said board detector, that adaptively backplane tests at least a pair of said plurality of hardware boards based on said relative arrangement.

16. The test tool as recited in claim 15 wherein said board detector further determines whether each of said plurality of hardware boards is usable for backplane testing.

17. The test tool as recited in claim 16 wherein usability for backplane testing is determined by an addressing test, a path integrity test and a disable test.

18. The test tool as recited in claim 15 wherein said test coordinator further executes a predecessor test prior to backplane testing of said pair of said plurality of hardware boards.

19. The test tool as recited in claim 15 wherein backplane testing provides data necessary to diagnose a fault condition associated with at least one of said backplane interconnections and said plurality of hardware boards.

20. The test tool as recited in claim 19 wherein said data necessary to diagnose said fault condition is coordinated with a failure database to isolate a cause of said fault condition.

Assignments (3)
MERGER AND CHANGE OF NAME Recorded Jun 7, 2018
From: LUCENT TECHNOLOGIES INC.; ALCATEL USA MARKETING, INC.; ALCATEL USA SOURCING, INC.; LUCENT TECHNOLOGIES INC.
To: ALCATEL-LUCENT USA INC.
Reel/Frame 046313/0453 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CORRECTIVE ASSIGNMENT TO RE-RECORD ASSIGNMENT PREVIOUSLY RECORDED ON REEL 017040 FRAME 0976. ASSIGNOR(S) HEREBY CONFIRMS THE TO CORRECT ASSIGNEE'S STATE OF INC. ON ORIGINAL FILED AND RECORDED ASSIGNMENT. Recorded Feb 23, 2006
From: VAN TREUREN, BRADFORD G.; WHEATLEY, PAUL J.
To: LUCENT TECHNOLOGIES INC.
Reel/Frame 017206/0525 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 28, 2005
From: VAN TREUREN, BRADFORD G.; WHEATLEY, PAUL J.
To: LUCENT TECHNOLOGIES INC.
Reel/Frame 017040/0976 →