IP Library Granted Patent US 7,750,641
Granted Patent B2
US 7,750,641 · App. 11/290,951 · Granted Jul 6, 2010

Battery system and method for monitoring a battery

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,750,641
App. No.
11/290,951
Granted
Jul 6, 2010
Kind
B2
Abstract

A battery system and a method for monitoring a battery are provided. The battery has a first plurality of cells electrically coupled in series to one another. The first plurality of cells includes a second plurality of cells and a third plurality of cells electrically coupled together at a node. The method includes calculating a first number of failed cells in the first plurality cells. The method further includes calculating a second number of failed cells in the second plurality cells and a third number of failed cells in the third plurality cells.

Claims (20)

1. A method for monitoring a battery, the battery having a first plurality of cells electrically coupled in series to one another, the first plurality of cells comprising a second plurality of cells and a third plurality of cells electrically coupled together at a node, each cell of the first plurality of cells having a desired output voltage level during desired operation and failing in a shorted operational condition, the method comprising:

measuring a first voltage level of the first plurality of cells of the battery when the first plurality of cells are not electrically coupled to a load;

measuring a second voltage level at the node between the second plurality of cells and the third plurality of cells when the first plurality of cells are electrically coupled to the load;

calculating a first number of failed cells in the first plurality cells based on the first voltage level, the desired output voltage level of each cell of the first plurality of cells and a number of cells in the first plurality of cells;

calculating a second number of failed cells in the second plurality cells based on the first number of failed cells, the desired output voltage level of each cell of the first plurality of cells, and the second voltage level; and

calculating a third number of failed cells in the third plurality cells based on the first number of failed cells, the desired output voltage level of each cell of the first plurality of cells, and the second voltage level.

2. The method of claim 1 , further comprising:

determining when the battery has a failed operational condition based on at least one statistical test using the first number of failed cells.

3. The method of claim 1 , further comprising:

determining when the battery has a failed operational condition based on at least one statistical test using at least two of the group comprising the first number of failed cells, the second number of failed cells and the third number of failed cells.

4. The method of claim 1 , further comprising:

determining when the battery has a failed operational condition based on a least one statistical test using at least two of the group comprising the first number of failed cells, the second number of failed cells and the third number of failed cells and wherein the statistical test further indicates the cell failures are not random to a statistical confidence level.

5. The method of claim 1 , further comprising:

determining when the battery has a failed operational condition based on at least one statistical test using at least two of the group comprising the first number of failed cells, the second number of failed cells and the third number of failed cells and wherein the statistical test further indicates the cell failures are not random based upon a sequence of cell failures.

6. The method of claim 1 , wherein the battery has been assigned a useful life, further comprising:

storing at least two of the group comprising first number of failed cells, the second number of failed cells and the third number of failed cells; and

storing an operating parameter of the battery related to a useful life of the battery.

7. The method of claim 6 , further comprising storing a number of times the battery has been charged.

8. The method of claim 6 , further comprising storing a number of times the battery has been discharged.

9. The method of claim 6 , further comprising storing a time in service of the battery.

Assignments (5)
QUITCLAIM ASSIGNMENT Recorded Apr 9, 2026
From: EDISON INNOVATIONS LLC
To: BUNKER HILL TECHNOLOGIES, LLC
Reel/Frame 074326/0549 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 26, 2025
From: GENERAL ELECTRIC COMPANY
To: GE INTELLECTUAL PROPERTY LICENSING, LLC
Reel/Frame 070636/0815 →
CHANGE OF NAME Recorded Mar 26, 2025
From: GE INTELLECTUAL PROPERTY LICENSING, LLC
To: DOLBY INTELLECTUAL PROPERTY LICENSING, LLC
Reel/Frame 070643/0907 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 20, 2025
From: DOLBY INTELLECTUAL PROPERTY LICENSING, LLC
To: EDISON INNOVATIONS, LLC
Reel/Frame 070293/0273 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2005
From: RUNKLE, MARK ANDREW; KING, ROBERT DEAN; SALASOO, LEMBIT
To: GENERAL ELECTRIC COMPANY
Reel/Frame 017316/0489 →