Induction heating stress improvement

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,514,998
App. No.
11/320,972
Granted
Aug 20, 2013
Kind
B2
Abstract

In implementing an induction heating stress improvement (IHSI) method in a nuclear plant, cooling characteristic with respect to the inner surface of piping is improved by appropriate structure/layout of nozzles, and further, the cooling effect when applying IHSI to a real machine is verified by installing a thermometer, as well as air in the portion subjected to IHSI is removed by heating the piping prior to the execution of IHSI.

Claims (20)

1. An induction heating stress improvement method in a nuclear power plant including a recirculation inlet nozzle having an annular clearance, the recirculation inlet nozzle including an inner surface of piping having a fluid therein, the method comprising:

providing a header tank comprising at least one cooling nozzle and a thermometer;

installing the at least one cooling nozzle of a header tank within a range in a clockwise direction from one of a point at −45° from a horizontal position at 9 o'clock to a point at +45° from a horizontal position at 9 o'clock or a point at −45° from a horizontal position at 3 o'clock to a point at +45° from a horizontal position at 3 o'clock within the annular clearance of the recirculation inlet nozzle,

supplying cooling water by the cooling nozzle to the inner surface of piping of the recirculation inlet nozzle, and

verifying a cooling effect with respect to the inner surface of the piping by measuring a temperature of the fluid in the piping that has been raised by external heating of the recirculation inlet nozzle when applying the induction heating stress improvement method to the piping, and

wherein an installation position of the thermometer is deviated from that of the cooling nozzle of the header tank in the peripheral direction by installing the thermometer within a range in a clockwise direction from a point at −45° from a position at 12 o'clock to a point at +45° from a position at 12 o'clock within the annular clearance of the recirculation inlet nozzle.

2. An induction heating stress improvement method in a recirculation inlet nozzle of primary loop recirculation piping in a nuclear power plant, the recirculation inlet nozzle having an annular clearance and the piping having a fluid therein, the method comprising:

providing a header tank comprising at least one cooling nozzle,

installing the at least one cooling nozzle of a header tank within a range in a clockwise direction from one of a point at −45° from a horizontal position at 9 o'clock to a point at +45° from a horizontal position at 9 o'clock or a point at −45° from a horizontal position at 3 o'clock to a point at +45° from a horizontal position at 3 o'clock within an annular clearance of the recirculation inlet nozzle, about the center of the annular clearance in the horizontal direction, to thereby promote a cooling effect,

supplying cooling water by the cooling nozzle to an inner surface of the piping,

verifying a cooling effect with respect to the inner surface of the piping by measuring a fluid temperature of the fluid in the piping that has been raised by external heating of the piping when applying the induction heating stress improvement method to the piping, and

installing a thermometer in the annular clearance of the recirculation inlet nozzle,

the fluid temperature being measured by using the thermometer, and

an installation position of the thermometer is deviated from that of the cooling nozzle of the header tank in the peripheral direction by installing the thermometer within a range in a clockwise direction from a point at −45° from a position at 12 o'clock to a point at +45° from a position at 12 o'clock within the annular clearance of the recirculation inlet nozzle.

3. An induction heating stress improvement method in a nozzle portion of a nuclear reactor pressure vessel for a nuclear power plant, the nozzle portion including an annular clearance and an inner surface of piping having a fluid therein, the method comprising:

installing the least one cooling nozzle of a header tank within a range in a clockwise direction from one of a point at −45° from a horizontal position at 9 o'clock to a point at +45° from a horizontal position at 9 o'clock or a point at −45° from a horizontal position at 3 o'clock to a point at +45° from a horizontal position at 3 o'clock within an annular clearance of the nozzle portion;

supplying cooling water by the cooling nozzle to the nozzle portion and

verifying a cooling effect of the nozzle portion by measuring a fluid temperature of the fluid in the piping when applying the induction heating stress improvement method to the nozzle portion, or when performing preliminary heating, or before executing the induction heating stress improvement method, wherein

the fluid temperature is measured by using the thermometer, and wherein

an installation position of the thermometer is deviated from that of the cooling nozzle of the header tank in the peripheral direction by installing the thermometer within a range in a clockwise direction from a point at −45° from a position at 12 o'clock to a point at +45° from a position at 12 o'clock within the annular clearance of the nozzle portion.

Assignments (2)
CHANGE OF NAME Recorded Jan 5, 2026
From: HITACHI-GE NUCLEAR ENERGY, LTD.
To: HITACHI GE VERNOVA NUCLEAR ENERGY, LTD.
Reel/Frame 074188/0822 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 28, 2007
From: HITACHI, LTD.
To: HITACHI-GE NUCLEAR ENERGY, LTD.
Reel/Frame 020168/0381 →