IP Library Granted Patent US 7,593,738
Granted Patent B2
US 7,593,738 · App. 11/321,893 · Granted Sep 22, 2009

GPS synchronization for wireless communications stations

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,593,738
App. No.
11/321,893
Granted
Sep 22, 2009
Kind
B2
Abstract

A method and system are specified to determine, provide, and exploit the precise time base relations between the distinct signal timings of the Global Positioning System (GPS) and a wireless communications system (WCS) for which the internal WCS downlink time base standards are not inherently synchronized to GPS timing. These downlink signal synchronization facilities are particularly beneficial for a wireless location system (WLS) and related methods and subsystems that provide mobile-station location determination through the exploitation of the time base synchronization information, e.g., to assist a GPS-equipped mobile station in determining its GPS-derived measurements with enhanced efficiency and accuracy.

Claims (24)

1. A signal processing method for use in processing a base transceiver station (BTS) downlink signal, comprising:

acquiring a candidate time series from a received BTS downlink burst signal;

correlating a frequency correction channel (FCCH) replica with a candidate broadcast control channel (BCCH) beacon signal to determine a nominal frame time alignment and time of arrival (TOA) for an FCCH burst signal;

correlating a synchronization channel (SCH) extended training sequence to determine a time alignment and TOA for an SCH burst signal;

attempting to demodulate the SCH burst signal;

determining that the SCH demodulation is not acceptable, and in response thereto performing the following steps:

obtaining A-bis monitoring system (AMS)-derived possible partial/modulo frame and associated BSIC information for the candidate BCCH signal;

calibrating the AMS-derived timings to GPS-based times for possible partial/modulo frames, and using the candidate AMS-derived partial/modulo frame information to form the possible complete frame numbers (FNs) with associated reduced frame numbers (RFNs) for the SCH;

applying selected BSIC and FN/RFN to form a complete SCH replica; correlating the SCH replica with a candidate BCCH signal to refine the TOA measurement for the SCH burst signal;

integrating the SCH correlation with an associated FCCH correlation for a refined measurement of TOA;

determining that the correlation results are acceptable and propagating a measured GPS-timebased TOA to a frame boundary, thereby determining a measured GPS-timebased TOA corresponding to a frame boundary; and

forming a record of correlated BCCH carrier identification, BSIC, FN, and GPS-timebased TOA.

2. A signal processing system for use in processing a base transceiver station (BTS) downlink signal, comprising a processor and executable instructions for configuring the processor to perform a sequence of predefined steps, said steps including:

acquiring a candidate time series from a received BTS downlink burst signal;

correlating a frequency correction channel (FCCH) replica with a candidate broadcast control channel (BCCH) beacon signal to determine a nominal frame time alignment and time of arrival (TOA) for an FCCH burst signal;

correlating a synchronization channel (SCH) extended training sequence to determine a time alignment and TOA for an SCH burst signal;

attempting to demodulate the SCH burst signal;

determining that the SCH demodulation is not acceptable, and in response thereto performing the following steps:

obtaining A-bis monitoring system (AMS)-derived possible partial/modulo frame and associated BSIC information for the candidate BCCH signal;

calibrating the AMS-derived timings to GPS-based times for possible partial/modulo frames, and using the candidate AMS-derived partial/modulo frame information to form the possible complete frame numbers (FNs) with associated reduced frame numbers (RFNs) for the SCH;

applying selected BSIC and FN/RFN to form a complete SCH replica; correlating the SCH replica with a candidate BCCH signal to refine the TOA measurement for the SCH burst signal;

integrating the SCH correlation with an associated FCCH correlation for a refined measurement of TOA;

determining that the correlation results are acceptable and propagating a measured GPS-timebased TOA to a frame boundary, thereby determining a measured GPS-timebased TOA corresponding to a frame boundary; and

forming a record of correlated BCCH carrier identification, BSIC, FN, and GPS-timebased TOA.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 8, 2025
From: SKYHOOK HOLDING, INC.
To: QUALCOMM INCORPORATED
Reel/Frame 069853/0509 →
CHANGE OF NAME Recorded Jan 27, 2017
From: TRUEPOSITION, INC.
To: SKYHOOK HOLDING, INC.
Reel/Frame 041540/0984 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2006
From: ANDERSON, ROBERT J.
To: TRUEPOSITION, INC.
Reel/Frame 017447/0227 →