IP Library Granted Patent US 7,092,801
Granted Patent B2
US 7,092,801 · App. 11/374,096 · Granted Aug 15, 2006

Train control system and method of controlling a train or trains

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,092,801
App. No.
11/374,096
Granted
Aug 15, 2006
Kind
B2
Abstract

A train control system includes positioning systems at the end of the train and at the front of the train, allowing the conductor or engineer to unambiguously determine that no cars of the train have become detached. The positioning system at the end of the train is also used to verify that the entire train has cleared a block. This information can be relayed to a dispatcher, thereby eliminating the need for trackside sensing equipment. A control unit prevents the train from moving without an authorization that includes the train's current position.

Claims (36)

1. A method for controlling a train comprising the steps of:

receiving a speed restriction at a train, the speed restriction including a maximum allowable speed;

determining a position of the train using a positioning system;

determining when a train is in danger of violating the speed restriction based at least in part on a grade of a track on which the train is traveling and at least in part upon the weight of the train;

applying a train brake such that violation of the speed restriction is prevented.

2. The method of claim 1 , wherein the speed restriction is a temporary speed restriction.

3. The method of claim 2 , wherein the speed restriction is a Form A speed restriction.

4. The method of claim 2 , wherein the speed restriction is a Form B speed restriction.

5. The method of claim 2 , wherein the speed restriction is a Form C speed restriction.

6. The method of claim 1 , wherein the speed restriction further includes a start point, the start point being located at a position within an area in which the train is authorized to travel but which the train has not yet reached, and wherein the train brake pressure is applied such that the train is gradually slowed to a speed no greater than the maximum allowable speed before the train reaches the start point.

7. The method of claim 1 , wherein the speed restriction is a permanent speed restriction.

8. The method of claim 1 , wherein the speed restriction is a train-based speed restriction.

9. The method of claim 1 , wherein the positioning system comprises a global positioning system receiver.

10. An apparatus for controlling a train comprising:

a positioning system;

a receiver for recovering a wireless transmission including a speed restriction, the speed restriction including a maximum allowable speed;

a brake interface configured to control a braking system on the train;

and a processor connected to the positioning system, the receiver and the brake interface, the processor being configured to perform the steps of:

receiving a speed restriction via the receiver;

determining a position of the train using information obtained from the positioning system

determining when a train is in danger of violating the speed restriction based at least in part on a grade of a track on which the train is traveling and at least in part upon a weight of the train; and

controlling the braking system via the brake interface such that violation of the speed restriction is prevented.

11. The apparatus of claim 10 , wherein the speed restriction is a temporary speed restriction.

12. The apparatus of claim 10 , wherein the speed restriction is a Form A speed restriction.

13. The apparatus of claim 10 , wherein the speed restriction is a Form B speed restriction.

14. The apparatus of claim 10 , wherein the speed restriction is a Form C speed restriction.

15. The apparatus of claim 10 , wherein the speed restriction further includes a start point, the start point being located at a position within an area in which the train is authorized to travel but which the train has not yet reached, and wherein the train brake pressure is applied such that the train is gradually slowed to a speed no greater than the maximum allowable speed before the train reaches the start point.

16. The apparatus of claim 10 , wherein the speed restriction is a permanent speed restriction.

17. The apparatus of claim 10 , wherein the speed restriction is a train-based speed restriction.

18. The apparatus of claim 10 , wherein the positioning system comprises a global positioning system receiver.

19. The apparatus of claim 10 , further comprising a warning device, wherein the processor is further configured to activate the warning device prior to activating the brakes in order to provide an operator with an opportunity to control the train such that the speed restriction is not violated.

20. A method for controlling a train comprising the steps of:

receiving a speed restriction at a train, the speed restriction including a maximum allowable speed;

determining a position of the train using a positioning system;

determining when a train is in danger of violating the speed restriction based at least in part on a grade of a track on which the train is traveling and at least in part upon the weight of the train; and

taking corrective action to prevent violation of the speed restriction.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 22, 2018
From: SIEMENS INDUSTRY, INC
To: SIEMENS MOBILITY, INC.
Reel/Frame 046178/0359 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 19, 2018
From: SIEMENS INDUSTRY, INC
To: SIEMENS MOBILITY, INC.
Reel/Frame 046126/0551 →
MERGER Recorded Apr 15, 2014
From: SIEMENS RAIL AUTOMATION CORPORATION; SIEMENS INDUSTRY, INC.
To: SIEMENS INDUSTRY, INC.
Reel/Frame 032689/0075 →
CHANGE OF NAME Recorded Sep 16, 2013
From: INVENSYS RAIL CORPORATION
To: SIEMENS RAIL AUTOMATION CORPORATION
Reel/Frame 031217/0423 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 24, 2010
From: QUANTUM ENGINEERING, INC.
To: INVENSYS RAIL CORPORATION
Reel/Frame 024128/0423 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2006
From: KANE, MARK EDWARD; SHOCKLEY, JAMES FRANCIS; HICKENLOOPER, HARRISON THOMAS
To: QUANTUM ENGINEERING, INC.
Reel/Frame 017671/0197 →