IP Library Granted Patent US 7,203,595
Granted Patent B1
US 7,203,595 · App. 11/376,731 · Granted Apr 10, 2007

Rating that represents the status along a specified driving route

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,203,595
App. No.
11/376,731
Granted
Apr 10, 2007
Kind
B1
Abstract

A Jam Factor rating is provided that represents the status along a specified driving route. The driving route is specified such that the route includes at least one road. A free flow travel time is calculated for the specified route. Then, the total delay is calculated for the specified route. The free flow travel time and the total delay are summed to obtain the total estimated travel time along the specified route. A delay multiple is then calculated by dividing the total travel time by the free flow travel time. The Jam Factor rating is then calculated based on the delay multiple.

Claims (58)

1. A computer-implemented method of calculating a rating that represents the status along a specified driving route comprising:

(a) specifying a driving route, such that the route includes at least one road;

(b) calculating the free flow travel time for the specified route;

(c) calculating the total delay along the specified route;

(d) summing the free flow travel time and the total delay to obtain the total estimated travel time;

(e) calculating a delay multiple by dividing the total travel time by the free flow travel time; and

(f) calculating a rating based on the delay multiple.

2. The method of claim 1 wherein the total delay along the specified route includes a congestion delay.

3. The method of claim 2 wherein the congestion delay is calculated by:

(i) identifying areas of congestion along the route,

(ii) determining the length of each area of congestion,

(iii) determining an average speed for each area of congestion,

(iv) calculating the travel time for each area of congestion by dividing the length of the area by the average speed for that area,

(v) calculating the congestion delay for each area by subtracting the free flow travel time for that area from the travel time for that area,

(vi) summing the congestion delays for each area of congestion along the route.

4. The method of claim 1 wherein the total delay along the specified route includes an incident delay.

5. The method of claim 4 wherein the incident delay is calculated by:

(i) identifying incidents along the route,

(ii) determining the criticality of each incident along the route,

(iii) determining an incident delay associated with each incident along the route which is based upon the criticality of the incident, and

(iv) summing the incident delays for each incident along the route.

6. The method of claim 1 wherein the total delay along the specified route includes a digital delay calculated from sensor values.

7. The method of claim 1 wherein the total delay along the specified route includes a digital delay calculated from sensor values using the equation:

DigitalDelay

=

RouteLength

SensorSpeed

-

RouteLength

SpeedLimit

8. The method of claim 1 wherein the rating is directly associated to the delay multiple by an exponential equation where the rating equals 0 when the delay multiple equals 1 and the rating approaches 10 as the delay multiple grows very large.

9. The method of claim 1 wherein the rating is calculated from a table containing ratings for discreet values of the delay multiple by linearly interpolating the rating for values for the delay multiple which fall in between the discreet values contained in the table using the equation:

Rating

=

Rating

next

-

Rating

prev

DelayMultiple

next

-

DelayMultiple

prev

*

(

DelayMultiple

actual

-

DelayMultiple

next

)

+

Rating

next

10. The method of claim 1 wherein the free flow travel time for a specified route is calculated by dividing the length of the route by the speed limit for the route.

11. The method of claim 1 wherein any road closure along the specified driving route automatically creates a rating of 10.

12. The method of claim 1 wherein the specified driving route is a keyroute, the keyroute being one or more road segments.

Assignments (3)
CHANGE OF NAME Recorded Sep 26, 2014
From: NAVTEQ B.V.
To: HERE GLOBAL B.V.
Reel/Frame 033830/0681 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 5, 2012
From: TRAFFIC.COM, INC.
To: NAVTEQ B.V.
Reel/Frame 029108/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 18, 2006
From: AUXER, GREGORY A.; CARROLL, JAMES F.; SMYTH, BRIAN J.
To: TRAFFIC.COM, INC.
Reel/Frame 017637/0513 →