IP Library Granted Patent US 7,654,799
Granted Patent B2
US 7,654,799 · App. 11/380,936 · Granted Feb 2, 2010

Modular rotor blade for a wind turbine and method for assembling same

Assignee: General Electric Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,654,799
App. No.
11/380,936
Granted
Feb 2, 2010
Kind
B2
Abstract

A sectional wind turbine rotor blade is provided, the sectional wind turbine rotor blade having first and second blade sections, wherein the first and second blade sections are fixedly mountable to each other via a connector. Furthermore, a method for assembling a sectional wind turbine rotor blade is provided.

Claims (17)

1. A modular rotor blade for a wind turbine, comprising at least a first module and a second module, wherein the first and second modules are adapted to be rigidly fixed to each other by a connection arrangement, the connection arrangement comprising a connector rod bonded to at least one receptacle adapted to receive the connector rod, the connector rod and the at least one receptacle forming a sealing flange, wherein the connector rod and the at least one receptacle have rectangular cross sections, and wherein a permanent bonding joint defined between the first and second modules comprises a substantially uniform bond line inducing a substantially uniform load distribution between the connector rod and the at least one receptacle.

2. The modular rotor blade according to claim 1 , wherein the connector rod is disposed at the first module.

3. The modular rotor blade according to claim 1 , wherein the connector rod is disposed at the second module.

4. The modular rotor blade according to claim 1 , wherein the receptacle is disposed at the first module.

5. The modular rotor blade according to claim 1 , wherein the receptacle is disposed at the second module.

6. The modular rotor blade according to claim 1 , wherein each module has essentially the same longitudinal length.

7. The modular rotor blade according to claim 1 , further comprising at least one intermediate module, the intermediate module being adapted to be rigidly fixed to one of the first and second modules by a connection arrangement, the connection arrangement comprising a second connector rod bonded to at least one second receptacle adapted to receive the connector rod, and wherein the second connector rod and the at least one second receptacle have rectangular cross sections.

8. The modular rotor blade according to claim 1 , wherein the connector rod and the receptacle are male and female box beams adapted to fit into each other.

9. The modular rotor blade according to claim 8 , wherein the box beams comprise sealing flanges.

10. A modular rotor blade for a wind turbine, comprising at least a first module and a second module, wherein the first and second modules are adapted to be rigidly fixed to each other by a connection arrangement, the connection arrangement comprising a connector rod bonded to at least one receptacle adapted to receive the connector rod, the connector rod and the at least one receptacle forming a sealing flange, wherein the connector rod and the at least one receptacle have an elliptical cross section, and wherein a permanent bonding joint defined between the first and second modules comprises a substantially uniform bond line inducing a substantially uniform load distribution between the connector rod and the at least one receptacle.

11. A method for assembling a sectional wind turbine blade, said method comprising:

providing a sectional wind turbine rotor blade having a first blade section and a second blade section;

fitting together the first and second blade sections with a connector;

forming a permanent joint between the first and second blade sections by:

sealing the connector; and

forming a permanent, substantially uniform bonding joint between a connector rod and at least one receptacle inducing a substantially uniform load distribution between the connector rod and the at least one receptacle, the connector rod and the at least one receptacle forming a sealing flange.

12. The method according to claim 11 , wherein the permanent joint is formed with a uniform bond line.

Assignments (7)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 22, 2024
From: LM WIND POWER US TECHNOLOGY APS
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 066869/0770 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2023
From: GENERAL ELECTRIC COMPANY
To: LM WIND POWER US TECHNOLOGY APS
Reel/Frame 065531/0160 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 22, 2007
From: GE WIND ENERGY GMBH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 019470/0014 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2007
From: GE WIND ENERGY GMBH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 019355/0565 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CORRECT EXECUTION DATE: FROM 03/16/2006, TO REFLECT CORRECT EXECUTION DATE OF 03/15/2006 PREVIOUSLY RECORDED ON REEL 017549 FRAME 0547. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Mar 19, 2007
From: EYB, ENNO
To: GE WIND ENERGY GMBH; GE WIND ENERGY GMBH
Reel/Frame 019029/0664 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2006
From: EYB, ENNO
To: GE WIND ENERGY GMBH
Reel/Frame 017549/0547 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2006
From: GE WIND ENERGY GMBH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 017549/0552 →
Continuity (1)
Related Publication 20070253824A1 · Nov 1, 2007