IP Library Granted Patent US 7,797,088
Granted Patent B2
US 7,797,088 · App. 11/415,274 · Granted Sep 14, 2010

Method and apparatus for planning linked train movements

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,797,088
App. No.
11/415,274
Granted
Sep 14, 2010
Kind
B2
Abstract

A scheduling system and method for identifying and planning for the linked movement of two or more trains.

Claims (30)

1. A method of controlling a movement of plural trains over a rail network comprising the steps of:

(a) providing a schedule for a planned movement of plural trains;

(b) identifying two or more trains having block swap activity;

(c) identifying a location of the block swap activity;

(d) monitoring the movement of the two or more trains;

(e) modifying characteristics of the two or more trains when the trains reach the block swap activity location; and

(f) planning a movement of the two or more trains using the modified characteristics.

2. The method of claim 1 where the step of identifying includes identifying trains with the same block code.

3. The method of claim 1 wherein the train characteristic is one of weight, length, or importance.

4. The method of claim 1 wherein the block swap includes transferring at least one railcar between two trains.

5. The method of claim 4 wherein the transferred railcar has a higher priority than the other cars on the train it is being transferred to.

6. The method of claim 1 wherein the characteristic is a function of the cargo.

7. A method of controlling a movement of plural trains over a rail network comprising the steps of:

(a) providing a schedule for a planned movement of plural trains;

(b) identifying two or more trains having middle annul activity;

(c) identifying a location of the middle annul activity;

(d) monitoring the movement of the two or more trains;

(e) modifying characteristics of the two or more trains when the trains reach the middle annul activity location; and

(f) planning the movement of the two or more trains using the modified characteristics.

8. The method of claim 7 wherein the train characteristic is one of weight, length, or importance.

9. A computer readable storage medium storing a computer program for controlling the movement of plural trains over a rail network, the computer program comprising:

a computer usable medium having computer readable program code modules embodied in said medium for planning a movement of trains;

a computer readable first program code module for providing a schedule for the planned movement of plural trains,

a computer readable second program code module for identifying two or more trains having block swap activity,

a computer readable third program code module for identifying a location of the block swap activity;

a computer readable fourth program code module for monitoring the movement of the two or more trains;

a computer readable fifth program code module for modifying characteristics of the two or more trains when the trains reach the block swap activity location; and

a computer readable sixth program code module for planning the movement of the two or more trains using the modified characteristics.

10. The computer program of claim 9 wherein the block swap includes transferring at least one railcar between two trains.

11. The computer program of claim 9 wherein the characteristics include one of physical and non-physical characteristics.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: GENERAL ELECTRIC COMPANY
To: GE GLOBAL SOURCING LLC
Reel/Frame 047736/0178 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 26, 2006
From: PHILP, JOSEPH WESLEY; WILLS, MITCHELL SCOTT
To: GENERAL ELECTRIC COMPANY
Reel/Frame 018130/0040 →