IP Library Granted Patent US 7,559,373
Granted Patent B2
US 7,559,373 · App. 11/421,030 · Granted Jul 14, 2009

Process for fracturing a subterranean formation

Assignees: Sanjel Corporation; Fairborne Energy Ltd
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,559,373
App. No.
11/421,030
Granted
Jul 14, 2009
Kind
B2
Abstract

A well may intersect a mineral bearing stratum. A fracturing fluid in the nature of a non-participating gas may be injected into the stratum at high rates of flow, to yield a high down hole pressure, and a time v. pressure pulse extending over a period of time. A second pulse may follow the first pulse in relatively quick succession. There may be pauses, or period of relative relaxation between the pulses.

Claims (60)

1. A process for treating a geological formation, said process comprising the steps of:

selecting a well bore having a producing zone including at least one coal seam at a depth of less than 2000 feet in the well bore;

introducing a supply of fracturing fluid into the well bore, the fracturing fluid being non-participating gas and being substantially free of liquid water;

urging the non-participating gas into the coal seam until a first threshold is reached;

relaxing the flow of fracturing fluid until a second threshold is reached;

resuming urging of the fracturing fluid into the coal seam until a third threshold is reached; and

again relaxing the flow of fracturing fluid into the coal seam.

2. The process of claim 1 wherein:

said first threshold is defined by at least one criterion selected from a first set of criteria consisting of

(a) a time period threshold;

(b) a non-participating gas quantity threshold;

(c) a well bore pressure threshold; and

(d) a well bore rate of pressure change threshold;

said second threshold is defined by at least one criterion selected from a second set of criteria consisting of:

(a) a time period threshold;

(b) a non-participating gas quantity threshold;

(c) a well bore pressure threshold; and

(d) a well bore rate of pressure change threshold

said third threshold is defined by at least one criterion selected from a third set of criteria consisting of:

(a) a time period threshold;

(b) a non-participating gas quantity threshold;

(c) a well bore pressure threshold; and

(d) a well bore rate of pressure change threshold.

3. The process of claim 1 wherein said step of selecting a well bore includes the step of selecting a well bore that is substantially free of water at the level of said coal seam.

4. The process of claim 1 wherein the step of introducing the fracturing fluid is preceded by the step of de-watering said well bore to at least the level of said coal seam.

5. The process of claim 1 wherein said process includes more than two steps of urging fracturing fluid into the coal seam, and more than two of said relaxing steps.

6. The process of claim 1 wherein one of said thresholds is a lateral fracture threshold.

7. The process of claim 1 wherein one of said thresholds is a dendritic fracture threshold.

8. The process of claim 1 wherein at least one of said steps of relaxing includes a step of stopping flow of fracturing fluid into said well bore.

9. The process of claim 8 wherein said step of relaxing includes permitting said fracturing fluid to propagate into a fracture region in said coal seam adjacent to said well bore.

10. The process of claim 1 wherein said non-participating gas is predominantly nitrogen.

11. The process of claim 1 wherein said non-participating gas is substantially entirely nitrogen.

12. The process of claim 1 wherein said fracturing fluid is substantially free of proppant.

13. The process of claim 1 wherein said process includes the step of repeating said process on a second coal seam through which said well bore passes.

14. The process of claim 13 wherein said process includes the step of isolating said second coal seam from said first coal seam before repeating said process on said second coal seam.

15. The process of claim 1 wherein at least one of the first and thirds thresholds are defined at least in part, by an introduction of dilation fluid for a period of at least 30 seconds at a flow rate of at least 300 scm.

16. The process of claim 1 wherein the second threshold is defined at least in part as a time period of more than 1 minute and less than 24 hours of a flow rate of dilation fluid of 0 to 300 scm.

17. The process of claim 1 wherein the first threshold is defined by an introduction of dilation fluid for a period of 30 seconds to 20 minutes at a flow rate of at least 300 scm, the second threshold is defined as a time period of more than 1 minute and less than 24 hours of a flow rate of dilation fluid of 0 to 300 scm and the third threshold is defined as an introduction of dilation fluid for a period of 30 seconds to 20 minutes at a flow rate of at least 300 scm.

18. The process of claim 1 wherein at least one of the first and thirds thresholds is defined at least in part, by an introduction of dilation fluid for a time period in the range of 1 to 10 minutes and at a flow rate of dilation fluid of at least 1000 scm.

19. The process of claim 1 wherein said first threshold is defined at least in part from the set consisting of (a) a time period in the range of 30 seconds to 20 minutes; (b) a peak pressure measured at surface of greater than 2000 psi; and (c) a combination of a time period in the range of 30 seconds to 20 minutes and a peak surface pressure of greater than 2000 psi.

20. The process of claim 1 wherein said first threshold is defined at least in part from the set consisting of (a) a time period in the range of 1 to 10 minutes; (b) a peak pressure measured at surface of greater than 5000 psia; and (c) a combination of a time period in the range of 1 to 10 minutes and a peak pressure greater than 5000 psia.

21. The process of claim 1 wherein at the first threshold and at the third threshold the introduction of dilation fluid generates a peak bottom hole pressure, measured in the well bore, of at least 500 p.s.i.

22. The process of claim 1 wherein at the first threshold and at the third threshold the introduction of dilation fluid generates a peak bottom hole pressure, measured in the well bore, of at least 1000 p.s.i.

23. The process of claim 1 wherein the first threshold and the third threshold are reached by introduction of dilation fluid at a rate of flow to achieve a pressure rise of 500 psi bottom hole pressure in the well bore over an elapsed time of less than or equal to 100 seconds.

24. The process of claim 1 wherein said first threshold is defined, at least in part, by a peak pressure, and said second threshold is defined, at least in part, as a proportion of that peak pressure.

25. The process of claim 1 wherein at said first threshold there is a peak pressure in the well bore of P 0 , and said second threshold is defined, at least in part, as a proportion, P 1 , of that peak pressure, P 0 , and the fraction P 1 /P 0 lies in the range of e −3 and e −1 .

26. The process of claim 1 wherein said first threshold is defined, at least in part, by a time interval t 1 , and said second threshold is defined, at least in part, by a second time interval, t 2 , and wherein the t 2 is longer than t 1 .

27. The process of claim 1 wherein said second threshold is defined, at least in part, by a decline from a peak pressure over a time period.

28. The process of claim 1 wherein said process has a time v. pressure characteristic having a sawtooth form, wherein said sawtooth form has a first sawtooth having an increasing pressure up to said first threshold, and a decreasing pressure to said second threshold; and a second sawtooth having an increasing pressure to said third threshold, and wherein each of said increases and decreases in pressure is associated with a respective time interval, and said first and second saw teeth are unequal.

29. The process of claim 28 wherein each increasing pressure time interval of each of said sawteeth is shorter than the corresponding decreasing pressure time interval of each of said sawteeth.

30. A process of dilating fractures in a coal seam adjacent to a well bore, that process including the steps of pressurizing and pressure relaxation of the coal seam a plurality of times, wherein at least one of the steps of pressurizing includes introducing a fracture dilation fluid into the coal seam, the fracture dilation fluid being substantially entirely non-participating gas, and at least one of the steps of pressurizing including the step of imposing a peak pressure, as measured at surface, of greater than 2000 p.s.i.

31. The process of claim 30 wherein at least one of said pressurizing steps includes raising the pressure at surface to more than 2000 p.s.i. in a time period of less than 100 seconds.

32. The process of claim 31 wherein at least one of said pressurizing steps includes a peak surface pressure of over 3500 p.s.i.

33. The process of claim 30 wherein at least one of said pressurizing steps includes achieving a pressure increase downhole of 500 p.s.i. in a time period of less than 100 seconds.

34. The process of claim 30 wherein the peak pressure in at least one of said steps is more than double the overburden pressure at the coal seam.

35. The process of claim 30 wherein said non-participating gas is predominantly nitrogen.

36. The process of claim 30 wherein said non-participating gas is substantially entirely nitrogen.

37. The process of claim 30 wherein at least one of said pressurizing steps includes introducing dilation fluid at a flow rate of at least 300 standard cubic meters/minute.

38. The process of claim 37 wherein the dilation fluid is introduced over a time period in the range of 30 seconds to 20 minutes.

39. The process of claim 30 wherein at least one of said pressurizing steps includes introducing dilation fluid for a time period in the range of 1 to 10 minutes and at a flow rate of dilation fluid of at least 1000 scm.

Assignments (23)
CHANGE OF NAME Recorded Jan 13, 2025
From: LIBERTY OILFIELD SERVICES LLC
To: LIBERTY ENERGY SERVICES LLC
Reel/Frame 069881/0664 →
RELEASE OF SECURITY INTEREST Recorded Jun 26, 2023
From: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 064058/0405 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 043891/0684 Recorded Jun 26, 2023
From: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 064106/0065 →
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY'S NAME FROM LOS ACQUISITION CO I LLC TO LIBERTY OILFIELD SERVICES LLC PREVIOUSLY RECORDED ON REEL 062515 FRAME 0943. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF PATENT SECURITY AGREEMENT. Recorded Feb 27, 2023
From: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 062881/0058 →
RELEASE OF PATENT SECURITY AGREEMENT Recorded Jan 26, 2023
From: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
To: LOS ACQUISITION CO I LLC
Reel/Frame 062515/0943 →
RELEASE OF PATENT SECURITY AGREEMENT Recorded Jan 26, 2023
From: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 062516/0566 →
PATENT SECURITY AGREEMENT Recorded Jun 15, 2021
From: LIBERTY OILFIELD SERVICES LLC
To: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
Reel/Frame 056596/0168 →
SECURITY INTEREST Recorded Feb 10, 2021
From: LIBERTY OILFIELD SERVICES LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT
Reel/Frame 055217/0599 →
CORRECTIVE ASSIGNMENT TO CORRECT THE PREVIOUSLY ENTERED NAME OF RECEIVER ENTITY-TO REMOVE EXCESS INFORMATION PREVIOUSLY RECORDED AT REEL: 047606 FRAME: 0580. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Feb 5, 2021
From: LOS ACQUISITION CO I LLC
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 055225/0296 →
MERGER Recorded Nov 28, 2018
From: LOS ACQUISITION CO I LLC (A DELAWARE LIMITED LIABILITY COMPANY)
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 047606/0580 →
SECURITY INTEREST Recorded Oct 18, 2017
From: LOS ACQUISITION CO I LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT
Reel/Frame 043891/0684 →
PATENT SECURITY AGREEMENT Recorded Oct 18, 2017
From: LOS ACQUISITION CO I LLC
To: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
Reel/Frame 044345/0169 →
RELEASE OF SECURITY INTEREST Recorded Oct 13, 2017
From: ALBERTA TREASURY BRANCHES
To: SANJEL CORPORATION
Reel/Frame 043859/0277 →
RELEASE OF SECURITY INTEREST Recorded Sep 19, 2017
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: LIBERTY OILFIELD SERVICES LLC; LOS ACQUISITION CO I LLC
Reel/Frame 043631/0021 →
SECURITY INTEREST Recorded Jun 16, 2017
From: LIBERTY OILFIELD SERVICES LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 042738/0675 →
PATENT ASSIGNMENT AGREEMENT Recorded Jan 19, 2017
From: SANJEL CANADA LTD.
To: LOS ACQUISITION CO I LLC
Reel/Frame 041420/0922 →
SECURITY INTEREST Recorded Sep 22, 2014
From: SANJEL CORPORATION
To: ALBERTA TREASURY BRANCHES
Reel/Frame 033788/0599 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: GLANVILLE, STEPHEN
To: SANJEL CORPORATION
Reel/Frame 022106/0162 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: GOODMAN, PAUL
To: SANJEL CORPORATION
Reel/Frame 022106/0269 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: JAMIESON, MERRILL
To: SANJEL CORPORATION
Reel/Frame 022106/0339 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: KALENCHUK, ASHLEY
To: SANJEL CORPORATION
Reel/Frame 022106/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: JACKSON, ROBERT A.
To: SANJEL CORPORATION; FAIRBORNE ENERGY LTD.
Reel/Frame 022106/0589 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: POIRIER, GARY M.
To: FAIRBORNE ENERGY LTD.
Reel/Frame 022106/0674 →
Priority Claims (1)
CA 2517494 · Aug 29, 2005 · national
Continuity (3)
Provisional Application 6059607300 · Aug 29, 2005
Provisional Application 6059506400 · Jun 2, 2005
Related Publication 20070007003A1 · Jan 11, 2007