IP Library Granted Patent US 7,430,902
Granted Patent B2
US 7,430,902 · App. 11/453,808 · Granted Oct 7, 2008

Method of monitoring deposition of a noble metal in a nuclear reactor and deposition monitor therefor

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,430,902
App. No.
11/453,808
Granted
Oct 7, 2008
Kind
B2
Abstract

In a method of monitoring deposition of a noble metal in an intergranular stress corrosion crack (IGSCC) in a metal reactor shroud wall of a nuclear reactor, a metal sample may be placed at a location within near an inner surface of the metal reactor shroud wall. The sample may be submerged below a water line in the reactor and includes at least one thermal fatigue crack. The sample is maintained at the location for a given duration, and a given amount of the noble metal is added into the reactor water while the sample is maintained at the location. The sample is then removed. In an example, a surface crevice deposition monitor for a reactor includes a flow conditioner arranged between a top guide clamp and an anchor clamp, and at least one sample holder connected between the top guide clamp and flow conditioner.

Claims (17)

1. A method for monitoring deposition of a noble metal in an intergranular stress corrosion crack (IGSCC) in a metal reactor shroud wall of a nuclear reactor comprising the steps of:

placing a metal sample at a location within about six inches or less of an inner surface of the metal reactor shroud wall, the sample submerged below a water line in the reactor, the metal sample containing at least one thermal fatigue crack,

maintaining the sample at the location for a given duration,

introducing a given amount of the noble metal into reactor water while the sample is maintained at the location, and

removing the sample from the location.

2. The method of claim 1 , wherein the sample is maintained at the location for at least two weeks.

3. The method of claim 1 , wherein the thermal fatigue crack has an opening of at least about 0.0005 inches.

4. The method of claim 1 , wherein the thermal fatigue crack has an opening in a range of about 0.0005 to 0.005 inches.

5. The method of claim 1 , further comprising:

analyzing deposition of the noble metal in the thermal fatigue crack.

6. The method of claim 5 , wherein the analyzing is conducted by acid stripping analysis.

7. The method of claim 5 , wherein the analyzing is conducted by SEM inspection.

8. The method of claim 6 , wherein introducing the noble metal includes adjusting the amount of the noble metal being introduced based on results of the acid stripping analysis.

9. The method of claim 7 , wherein introducing the noble metal includes adjusting the amount of the noble metal being introduced based on results of the SEM inspection.

10. The method of claim 1 , wherein said noble metal is Pt, Rh, Pd, Ag, Au, Ir or a combination thereof.

11. The method of claim 1 , wherein the noble metal is one of Pt, Rh or a combination thereof.

12. The method of claim 1 , wherein introducing further includes injecting the noble metal into said water.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2023
From: GENERAL ELECTRIC COMPANY
To: GE HITACHI NUCLEAR ENERGY AMERICAS LLC
Reel/Frame 065507/0098 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 12, 2006
From: SEEMAN, RUSSELL; CAINE, THOMAS ALFRED; TU, THANH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 018404/0170 →