IP Library Granted Patent US 7,661,274
Granted Patent B2
US 7,661,274 · App. 11/612,242 · Granted Feb 16, 2010

System and method for capacity control in a multiple compressor chiller system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,661,274
App. No.
11/612,242
Granted
Feb 16, 2010
Kind
B2
Abstract

A capacity control algorithm for a multiple compressor liquid chiller system is provided wherein the speed and number of compressors in operation are controlled in order to obtain a leaving liquid temperature setpoint. In response to an increase in the load in the chiller system, the algorithm determines if a compressor should be started and adjusts the operating speed of all operating compressors when an additional compressor is started. In response to a decrease in the load in the chiller system with multiple compressors operating, the algorithm determines if a compressor should be de-energized and adjusts the operating speed of all remaining operating compressors when a compressor is de-energized.

Claims (40)

1. A multiple compressor chiller system comprising:

a plurality of compressors, each compressor of the plurality of compressors being driven by a corresponding motor;

at least one refrigerant circuit comprising at least one compressor of the plurality of compressors, a condenser and an evaporator connected in a closed loop;

a variable speed drive to power the corresponding motors of the plurality of compressors, the variable speed drive comprising a converter, a DC link and a plurality of inverters each electrically connected in parallel to the DC link and each powering a corresponding motor of the plurality of compressors; and

a control panel to control the variable speed drive to generate a preselected system capacity from the plurality of compressors, the control panel being configured to determine a number of inverters of the plurality of inverters to operate in the variable speed drive and configured to determine an operating frequency for the number of operating inverters of the plurality of inverters in the variable speed drive to generate the preselected system capacity from the plurality of compressors.

2. The multiple compressor chiller system of claim 1 wherein the control panel comprises means for enabling a predetermined number of inverters of the plurality of inverters in response to a start control signal and satisfying at least one predetermined start criteria.

3. The multiple compressor chiller system of claim 2 wherein the at least one predetermined start criteria comprises at least one of:

the plurality of inverters being inactive; and

a chilled liquid temperature being greater than a setpoint temperature plus an offset temperature.

4. The multiple compressor chiller system of claim 3 wherein the means for enabling a predetermined number of inverters includes means for operating the predetermined number of inverters at a predetermined frequency.

5. The multiple compressor chiller system of claim 1 wherein the control panel comprises means for adjusting the operating frequency of the plurality of inverters of the variable speed drive in response to satisfying at least one predetermined capacity criteria, means for enabling a non-operating inverter of the plurality of inverters in response to satisfying at least one predetermined enabling criteria, and means for disabling an operating inverter of the plurality of inverters in response to satisfying at least one predetermined disabling criteria.

6. The multiple compressor chiller system of claim 5 wherein:

the means for adjusting the operating frequency of the plurality of inverters of the variable speed drive comprises means for increasing the operating frequency of the plurality of inverters by a predetermined frequency amount; and

the at least one predetermined capacity criteria comprises at least one of:

an increase capacity control signal;

any inverter of the plurality of inverters being disabled;

an inverter operating frequency being less than a maximum inverter frequency;

all inverters of the plurality of inverters being enabled; and

an inverter operating frequency for the plurality of inverters being less than a stop frequency plus a predetermined offset frequency.

7. The multiple compressor chiller system of claim 6 wherein the predetermined frequency amount is a frequency between about 0.1 Hz and about 25 Hz.

8. The multiple compressor chiller system of claim 5 wherein:

the means for adjusting the operating frequency of the plurality of inverters of the variable speed drive comprises means for decreasing the operating frequency of the plurality of inverters by a predetermined frequency amount; and

the at least one predetermined capacity criteria comprises at least one of:

a decrease capacity control signal;

more than one inverter of the plurality of inverters being enabled;

an inverter operating frequency being not equal to a minimum inverter frequency;

only one inverter of the plurality of inverters being enabled; and

an inverter operating frequency being greater than a minimum inverter frequency.

9. The multiple compressor chiller system of claim 8 wherein the predetermined frequency amount is a frequency between about 0.1 Hz and about 25 Hz.

10. The multiple compressor chiller system of claim 5 wherein the at least one predetermined enabling criteria comprises at least one of:

an increase capacity control signal;

any inverter of the plurality of inverters being disabled; and

an inverter operating frequency for the plurality of inverters being greater than a stop frequency plus a predetermined offset frequency.

11. The multiple compressor chiller system of claim 5 wherein the at least one predetermined disabling criteria comprises at least one of:

a decrease capacity control signal;

more than one inverter of the plurality of inverters being enabled;

an inverter operating frequency being equal to a minimum inverter frequency;

only one inverter of the plurality of inverters being enabled;

an inverter operating frequency being less than a minimum inverter frequency; and

a chilled liquid temperature being less than a setpoint temperature minus an offset temperature.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2025
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 072275/0395 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: YORK INTERNATIONAL CORPORATION
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058956/0981 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 22, 2021
From: YORK INTERNATIONAL CORPORATION
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058562/0695 →