IP Library Granted Patent US 7,359,820
Granted Patent B1
US 7,359,820 · App. 11/619,412 · Granted Apr 15, 2008

In-cycle system test adaptation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,359,820
App. No.
11/619,412
Granted
Apr 15, 2008
Kind
B1
Abstract

Disclosed are a method, information processing system and computer readable medium for performing a system test on a program. The method comprises creating a test plan associated with a system test. The system test is for testing a program within an environment. At least one test trigger to be monitored for during the system test is defined within the test plan. Execution of the system test on a system under test for the at least one test trigger is monitored. An occurrence of the at least one test trigger is determined. The test plan is modified to take into account the occurrence of the at least one test trigger in response to determining the occurrence. Execution of the system test is continued based on the modified test plan.

Claims (14)

1. A method, with an information processing system, for performing a system test on a program, the method comprising:

creating a test plan associated with a system test, wherein the system test is for testing a program within an environment;

defining within the test plan at least one test trigger to be monitored for during the system test, wherein the at least one test trigger is a self-learning test trigger, wherein the self-learning test trigger creates new test triggers within the test plan based on an event associated with the self-learning test trigger occurring;

monitoring execution of the system test on a system under test for the at least one test trigger;

determining an occurrence of the at least one test trigger;

modifying, in response to determining the occurrence, the test plan to take into account the occurrence of the at least one test trigger; and

continuing execution of the system test based on the modified test plan.

2. The method of claim 1 further comprising:

creating, in response to the determining the occurrence, at least one additional test trigger based on the at least one test trigger having occurred; and

modifying the test plan to include the at least one additional test trigger.

3. The method of claim 2 , wherein the creating the test plan is performed based upon user input.

4. The method of claim 2 , wherein the creating the at least on additional test trigger is performed by an automated testing tool.

5. The method of claim 2 , further comprising:

monitoring the system test for the at least one test trigger and the at least one additional test trigger.

Assignments (1)
CHANGE OF NAME Recorded Dec 20, 2021
From: FACEBOOK, INC.
To: META PLATFORMS, INC.
Reel/Frame 058553/0802 →