IP Library Granted Patent US 7,562,723
Granted Patent B2
US 7,562,723 · App. 11/649,567 · Granted Jul 21, 2009

Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system

Assignee: At Balance Americas, LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,562,723
App. No.
11/649,567
Granted
Jul 21, 2009
Kind
B2
Abstract

A method for controlling formation pressure during drilling includes pumping a drilling fluid through a drill string in a borehole, out a drill bit at the end of the drill string into an annular space. The drilling fluid is discharged from the annular space proximate the Earth's surface. At least one of a flow rate of the drilling fluid into the borehole and a fluid flow rate out of the annular space is measured. Pressure of the fluid in the annular space proximate the Earth's surface and pressure of the fluid proximate the bottom of the borehole are measured. Pressure of the fluid proximate the bottom of the borehole is estimated using the measured flow rate, annular space pressure and density of the drilling fluid. A warning signal is generated if difference between the estimated pressure and measured pressure exceeds a selected threshold.

Claims (8)

1. A method for determining existence of a well control event by controlling formation pressure during the drilling of a borehole through a subterranean formation, comprising:

selectively pumping a drilling fluid through a drill string extended into a borehole, out a drill bit at the bottom end of the drill string, and into an annular space between drill string and the borehole;

discharging the drilling fluid from the annular space proximate the Earth's surface;

selectively increasing annular space fluid pressure to maintain a selected fluid pressure proximate the bottom of the borehole by applying fluid pressure to the annular space, the selective increasing including controlling an aperture of an orifice functionally coupled to an outlet of the annular space;

monitoring the aperture of the orifice; and

determining existence of a well control event when the aperture changes and a rate of the selective pumping remains substantially constant.

2. The method of claim 1 wherein the well control event is determined to be an influx of fluid into the wellbore when the aperture changes due to an increase or decrease in the actual bottomhole pressure.

3. The method of claim 1 wherein the well control event is determined to be a loss of fluid from the wellbore when the aperture decreases due to a reduction in the actual bottomhole pressure.

Assignments (2)
MERGER Recorded Jan 25, 2013
From: AT-BALANCE AMERICAS LLC
To: SMITH INTERNATIONAL, INC.
Reel/Frame 029696/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 4, 2007
From: REITSMA, DONALD G.
To: ATBALANCE AMERICAS LLC
Reel/Frame 018779/0005 →
Continuity (2)
Provisional Application 6075631100 · Jan 5, 2006
Related Publication 20070151762A1 · Jul 5, 2007