IP Library Granted Patent US 8,607,718
Granted Patent B2
US 8,607,718 · App. 11/694,125 · Granted Dec 17, 2013

Recovery boiler combustion air system with intermediate air ports vertically aligned with multiple levels of tertiary air ports

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,607,718
App. No.
11/694,125
Granted
Dec 17, 2013
Kind
B2
Abstract

A combustion air system particularly useful for Kraft process recovery boilers or soda process recovery boilers has a level of liquor air ports located above the black liquor guns, and multiple levels of tertiary air formed by substantially vertically aligned tertiary air ports located above the black liquor guns. The liquor air ports and the tertiary air ports are on the same opposing walls of the furnace and are substantially vertically aligned with air ports in the same wall at different levels. The liquor air ports are located just above the black liquor guns, within a range of about ½ foot to about four feet. The tertiary air ports are laterally offset with respect to the tertiary air ports on the opposing wall of the furnace. The first tertiary air level is located a vertical distance in the range of about four feet to twelve feet above the elevation of liquor air ports, and the second and any additional tertiary air levels are located and spaced from an adjacent tertiary air level at regular spaced vertical intervals in the range of about four feet to eight feet. The vertically aligned and laterally offset tertiary air ports form a combustion air pattern of vertical sheets which travel across the width of the furnace to the opposing wall to carry smaller liquor particles to the walls of the furnace and reduce carryover and improve combustion efficiency.

Claims (52)

1. A combustion air system for a recovery boiler having four generally orthogonal walls and a floor, comprising:

a primary air level formed by a plurality of primary air ports in all of the walls of the furnace proximate to the floor;

a single secondary air level formed by opposed secondary air ports in front and rear walls of the furnace above the primary air ports;

black liquor guns in the walls of the furnace above the single secondary air level of opposed secondary air ports;

an elevation of liquor air ports only in the front and rear walls of the furnace and located a vertical distance in the range of about zero to four feet above the elevation of black liquor guns; and

at least first, second and third tertiary air levels formed by tertiary air ports only in the front and rear walls of the furnace above the black liquor guns, wherein the tertiary air ports in all of the at least first, second and third tertiary air levels are arranged in substantially vertically aligned columns in opposing walls of the furnace and wherein the columns are vertically aligned with the liquor air ports, each tertiary air port located at one of the at least three tertiary air levels, the first tertiary air level located a vertical distance in the range of about four feet to twelve feet above the elevation of liquor air ports, and the second and any additional tertiary air levels are located and spaced from an adjacent tertiary air level at regular spaced vertical intervals in the range of about four feet to eight feet, and wherein at least a portion of each of the at least three or more tertiary air levels in only one of the front wall, or the back wall, of the furnace are substantially vertically aligned with a black liquor gun.

2. The air port arrangement of claim 1 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is opposite the wall having the greater number of secondary air ports.

3. The air port arrangement of claim 2 , wherein the rear wall has the greater number of secondary air ports.

4. The air port arrangement of claim 2 , wherein the front wall has the greater number of secondary air ports.

5. The air port arrangement of claim 1 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is the same wall as the wall having the greater number of secondary air ports.

6. The air port arrangement of claim 1 , wherein the rear wall has the greater number of secondary air ports.

7. The air port arrangement of claim 1 , wherein the front wall has the greater number of secondary air ports.

8. The air port arrangement of claim 5 , wherein the rear wall has the greater number of secondary air ports.

9. The air port arrangement of claim 5 , wherein the front wall has the greater number of secondary air ports.

10. In a recovery boiler having a furnace with a front wall, a rear wall opposing the front wall, and two side walls adjoining the front and rear opposing walls, a plurality of black liquor guns for injecting black liquor into the furnace, the black liquor guns being located in the walls of the furnace and at a common elevation with respect to a floor of the furnace, and a combustion air system for providing a supply of air to the furnace, an air port arrangement associated with the combustion air system, the air port arrangement comprising:

a plurality of primary air ports in walls of the furnace which form a primary air level;

a plurality of secondary air ports only in the front and rear walls of the furnace which form one secondary air level at an elevation above the primary air level and below the common elevation of the plurality of black liquor guns, the number of secondary air ports on one wall being one greater than the number of secondary air ports on the opposing wall, the secondary air ports on one wall being laterally offset from the secondary air ports on the opposing wall;

an elevation of liquor air ports only in the front and rear walls of the furnace; and

a plurality of tertiary air ports only in the front and rear walls of the furnace which form at least two or more tertiary air levels above the elevation of liquor air ports, wherein the tertiary air ports in all of the at least two or more tertiary air levels and the liquor air ports are substantially vertically aligned with one another and wherein at least a portion of each of the at least two or more tertiary air levels in only one of the front wall, or the back wall, of the furnace are substantially vertically aligned with a black liquor qun.

11. The air port arrangement of claim 10 , wherein the elevation of the liquor air ports is located approximately two feet above the elevation of the black liquor guns.

12. The air port arrangement of claim 10 , comprising two tertiary air levels located above the elevation of liquor air ports, a first tertiary air level located approximately ten feet above the elevation of the black liquor guns, and a second tertiary air level located approximately fourteen feet above the elevation of the black liquor guns.

13. The air port arrangement of claim 10 , comprising three levels of tertiary air located above the elevation of liquor air ports and wherein each tertiary air port is vertically aligned with a tertiary air port in an adjacent tertiary air level and with the liquor air ports in the elevation of the liquor air ports.

14. The air port arrangement of claim 13 , wherein a first tertiary air level is located approximately six feet above the elevation of the black liquor guns, a second tertiary air level is located approximately ten feet above the elevation of the black liquor guns, and a third tertiary air level is located approximately fourteen feet above the elevation of the black liquor guns.

15. The air port arrangement of claim 10 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is opposite the wall having the greater number of secondary air ports.

16. The air port arrangement of claim 10 , wherein the rear wall has the greater number of secondary air ports.

17. The air port arrangement of claim 10 , wherein the front wall has the greater number of secondary air ports.

18. The air port arrangement of claim 10 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is the same wall as the wall having the greater number of secondary air ports.

19. The air port arrangement of claim 18 , wherein the rear wall has the greater number of secondary air ports.

20. The air port arrangement of claim 18 , wherein the front wall has the greater number of secondary air ports.

21. The air port arrangement of claim 10 , wherein the elevation of liquor air ports is located approximately two feet above the black liquor guns, a first tertiary air level is located approximately six feet above the black liquor guns, a second tertiary air level is located approximately ten feet above the black liquor guns, and a third tertiary air level is located approximately fourteen feet above the black liquor guns.

22. The air port arrangement of claim 10 , wherein the elevation of the liquor air ports is located a vertical distance in the range of about zero to four feet above the elevation the black liquor guns, the first tertiary level is located a vertical distance in the range of about four feet to twelve feet above the elevation of liquor air ports, and the second and any additional tertiary air levels are located and spaced from an adjacent tertiary air level at regular spaced vertical intervals in the range of about four feet to eight feet.

23. The air port arrangement of claim 10 , wherein the secondary air ports further comprise a combination of larger and smaller secondary air ports which alternate across a width of the recovery boiler and wherein the larger secondary air ports on one wall are directly opposite the smaller secondary air ports on the opposing wall thereby yielding a partially interlaced secondary air arrangement.

24. The air port arrangement of claim 15 , wherein the rear wall has the greater number of secondary air ports.

25. The air port arrangement of claim 15 , wherein the front wall has the greater number of secondary air ports.

26. In an industrial boiler having a furnace with a front wall, a rear wall opposing the front wall, and two side walls adjoining the front and rear opposing walls, a plurality of fuel injection devices for providing fuel into the furnace, the fuel injection devices being located in the walls of the furnace and at a common elevation with respect to a floor of the furnace, and a combustion air system for providing a supply of air to the furnace, an air port arrangement associated with the combustion air system, the air port arrangement comprising:

a plurality of primary air ports in walls of the furnace which form a primary air level;

a plurality of secondary air ports only in the front and rear walls of the furnace which form one secondary air level at an elevation above the primary air level and below the common elevation of the plurality of fuel injection devices, the number of secondary air ports on one wall being one greater than the number of secondary air ports on the opposing wall, the secondary air ports on one wall being laterally offset from the secondary air ports on the opposing wall;

an elevation of fuel air ports only in the front and rear walls of the furnace; and

a plurality of tertiary air ports only in the front and rear walls of the furnace which form at least two or more tertiary air levels above the elevation of fuel air ports, wherein the tertiary air ports in all of the at least two or more tertiary air levels and the fuel air ports are substantially vertically aligned with one another, and wherein at least a portion of each of the at least two or more tertiary air levels in only one of the front wall, or the back wall, of the furnace are substantially vertically aligned with a black liquor gun.

27. The air port arrangement of claim 26 , wherein the elevation of the fuel air ports is located approximately two feet above the elevation of the fuel injection devices.

28. The air port arrangement of claim 26 , comprising two tertiary air levels located above the elevation of fuel air ports, a first tertiary air level located approximately ten feet above the elevation of the fuel injection devices, and a second tertiary air level located approximately fourteen feet above the elevation of the fuel injection devices.

29. The air port arrangement of claim 26 , comprising three levels of tertiary air located above the elevation of fuel air ports and wherein each tertiary air port is vertically aligned with a tertiary air port in an adjacent tertiary air level and with the fuel air ports in the elevation of the fuel air ports.

30. The air port arrangement of claim 29 , wherein a first tertiary air level is located approximately six feet above the elevation of the fuel injection devices, a second tertiary air level is located approximately ten feet above the elevation of the fuel injection devices, and a third tertiary air level is located approximately fourteen feet above the elevation of the fuel injection devices.

31. The air port arrangement of claim 26 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is opposite the wall having the greater number of secondary air ports.

32. The air port arrangement of claim 26 , wherein the rear wall has the greater number of secondary air ports.

33. The air port arrangement of claim 26 , wherein the front wall has the greater number of secondary air ports.

34. The air port arrangement of claim 26 , wherein the number of tertiary air ports at a given elevation on one wall is one greater than the number of tertiary air ports at the same elevation on the opposing wall, the tertiary air ports on opposing walls being laterally offset with respect to each other, and wherein the wall having the greater number of tertiary air ports is the same wall as the wall having the greater number of secondary air ports.

35. The air port arrangement of claim 34 , wherein the rear wall has the greater number of secondary air ports.

36. The air port arrangement of claim 34 , wherein the front wall has the greater number of secondary air ports.

37. The air port arrangement of claim 26 , wherein the elevation of the liquor air ports is located a vertical distance in the range of about zero to four feet above the elevation the fuel injection devices, the first tertiary level is located a vertical distance in the range of about four feet to twelve feet above the elevation of fuel air ports, and the second and any additional tertiary air levels are located and spaced from an adjacent tertiary air level at regular spaced vertical intervals in the range of about four feet to eight feet.

38. The air port arrangement of claim 31 , wherein the rear wall has the greater number of secondary air ports.

39. The air port arrangement of claim 31 , wherein the front wall has the greater number of secondary air ports.

Assignments (19)
SECURITY INTEREST Recorded Jul 18, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: B. RILEY FINANCIAL, INC.
Reel/Frame 072053/0943 →
SECURITY INTEREST Recorded May 23, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: GLAS TRUST COMPANY LLC
Reel/Frame 071371/0835 →
SECURITY INTEREST Recorded Mar 3, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: PENSION BENEFIT GUARANTY CORPORATION
Reel/Frame 070380/0647 →
RELEASE OF SECURITY INTEREST Recorded Sep 13, 2024
From: MSD PCOF PARTNERS XLV, LLC
To: THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; AMERICON LLC
Reel/Frame 069017/0362 →
SECURITY INTEREST Recorded Jan 19, 2024
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: AXOS BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 066354/0765 →
RELEASE OF SECURITY INTEREST Recorded Dec 19, 2023
From: PENSION BENEFIT GUARANTY CORPORATION
To: THE BABCOCK & WILCOX COMPANY
Reel/Frame 066075/0348 →
SECURITY INTEREST Recorded Jul 22, 2021
From: THE BABCOCK & WILCOX COMPANY (F/K/A BABCOCK & WILCOX POWER GENERATION GROUP, INC.); BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC; DIAMOND POWER INTERNATIONAL, LLC (F/K/A DIAMOND POWER INTERNATIONAL, INC.)
To: MSD PCOF PARTNERS XLV, LLC, AS AGENT
Reel/Frame 056962/0486 →
RELEASE OF SECURITY INTEREST Recorded Jul 1, 2021
From: BANK OF AMERICA, N.A.
To: DIAMOND POWER INTERNATIONAL, LLC (F/K/A DIAMOND POWER INTERNATIONAL, INC.); MEGTEC TURBOSONIC TECHNOLOGIES, INC.; THE BABCOCK & WILCOX COMPANY (F/K/A BABCOCK & WILCOX POWER GENERATION GROUP, INC.); BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC (F/K/A MCDERMOTT TECHNOLOGY, INC.); SOFCO-EFS HOLDINGS LLC; BABCOCK & WILCOX MEGTEC, LLC
Reel/Frame 057337/0823 →
SECURITY INTEREST Recorded Feb 26, 2021
From: THE BABCOCK & WILCOX COMPANY
To: PENSION BENEFIT GUARANTY CORPORATION
Reel/Frame 055426/0833 →
RELEASE OF SECURITY INTEREST Recorded May 17, 2018
From: LIGHTSHIP CAPITAL LLC
To: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX MEGTEC, LLC; MEGTEC TURBOSONIC TECHNOLOGIES, INC.; BABCOCK & WILCOX UNIVERSAL, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC
Reel/Frame 046182/0829 →
SECURITY INTEREST Recorded Aug 10, 2017
From: THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX MEGTEC, LLC; MEGTEC TURBOSONIC TECHNOLOGIES, INC.; BABCOCK & WILCOX UNIVERSAL, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC
To: LIGHTSHIP CAPITAL LLC
Reel/Frame 043515/0001 →
CHANGE OF NAME Recorded Sep 24, 2015
From: BABCOCK & WILCOX POWER GENERATION GROUP, INC.
To: THE BABCOCK & WILCOX COMPANY
Reel/Frame 036675/0434 →
SECURITY INTEREST Recorded Jul 28, 2015
From: BABCOCK & WILCOX POWER GENERATION GROUP, INC. (TO BE RENAMED THE BABCOCK AND WILCOX COMPANY)
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 036201/0598 →
SECURITY INTEREST Recorded Jul 22, 2014
From: BABCOCK & WILCOX POWER GENERATION GROUP, INC.
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 033380/0744 →
CHANGE OF NAME Recorded Oct 22, 2013
From: THE BABCOCK & WILCOX COMPANY
To: BABCOCK & WILCOX POWER GENERATION GROUP, INC.
Reel/Frame 031465/0617 →
NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS Recorded Sep 30, 2010
From: BABCOCK & WILCOX POWER GENERATION GROUP, INC. (F.K.A. THE BABCOCK & WILCOX COMPANY)
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 025066/0080 →
RELEASE OF SECURITY INTEREST Recorded Aug 3, 2010
From: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
To: THE BABCOCK & WILCOX COMPANY; AMERICON EQUIPMENT SERVICES, INC.; AMERICON, INC.; APPLIED SYNERGISTICS, INC.; B & W SERVICE COMPANY; BABCOCK & WILCOX CHINA HOLDINGS, INC.; BABCOCK & WILCOX CONSTRUCTION CO., INC.; BABCOCK & WILCOX DENMARK HOLDINGS, INC.; BABCOCK & WILCOX EBENSBURG POWER, INC.; BABCOCK & WILCOX EQUITY INVESTMENTS, INC.; BABCOCK & WILCOX INTERNATIONAL SALES AND SERVICE CORPORATION; BABCOCK & WILCOX INTERNATIONAL, INC.; DIAMOND OPERATING CO., INC.; DIAMOND POWER AUSTRALIA HOLDINGS, INC.; DIAMOND POWER CHINA HOLDINGS, INC.; DIAMOND POWER EQUITY INVESTMENTS, INC.; DIAMOND POWER INTERNATIONAL, INC.; PALM BEACH RESOURCE RECOVERY CORPORATION; POWER SYSTEMS OPERATIONS, INC.; REVLOC RECLAMATION SERVICE, INC.; NATIONAL ECOLOGY COMPANY; NORTH COUNTY RECYCLING, INC.
Reel/Frame 024776/0693 →
AFTER-ACQUIRED INTELLECTUAL PROPERTY SECURITY AGREEMENT (SECOND SUPPLEMENTAL FILING) Recorded Jun 16, 2007
From: THE BABCOCK & WILCOX COMPANY
To: CREDIT SUISSE, CAYMAN ISLANDS BRANCH, AS COLLATERAL AGENT
Reel/Frame 019439/0565 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 8, 2007
From: WESSEL, RICHARD A.
To: THE BABCOCK & WILCOX COMPANY
Reel/Frame 019263/0203 →