IP Library Granted Patent US 7,694,527
Granted Patent B2
US 7,694,527 · App. 11/697,872 · Granted Apr 13, 2010

Control stability system for moist air dehumidification units and method of operation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,694,527
App. No.
11/697,872
Granted
Apr 13, 2010
Kind
B2
Abstract

A system and humidity control method is provided for a multi-stage cooling system having two or more refrigerant circuits that balances humidity control and cooling demand. Each refrigerant circuit includes a compressor, a vessel and an evaporator. A hot gas reheat circuit having a heat exchange coil is connected to one of the refrigerant circuits and is placed in fluid communication with the output airflow from the evaporator of that refrigerant circuit to provide additional dehumidification to the air when humidity control is requested. The hot gas reheat circuit bypasses the vessel of the refrigerant circuit during humidity control. Humidity control is performed during cooling operations and ventilation operations. During a first stage cooling operation using only one refrigerant circuit and having a low cooling demand, the request for humidity control activates the hot gas reheat circuit for dehumidification and activates a second refrigerant circuit to provide cooling capacity. The hot gas reheat circuit is sized to match the cooling provided by the evaporator so that air cooled by passing through the evaporator can be reheated. Excess refrigerant is passed into the inactive cooling circuit so that proper pressure and temperature can be maintained in the active reheat circuit and so that high head pressure that can damage the compressor can be avoided. During a second stage cooling operation using two or more refrigerant circuit and having a high cooling demand, the request for humidity control is suspended and is initiated only upon the completion of the second stage cooling demand.

Claims (7)

1. A system comprising:

a cooling circuit comprising a compressor, a vessel and an evaporator in fluid communication, the compressor having a discharge side and a suction side;

a reheat circuit comprising:

a first valve to control the flow of a refrigerant into the reheat circuit in fluid communication with the discharge side of the compressor and switchable between a first position in which the refrigerant from the compressor flows through the reheat circuit and is blocked from flowing to the vessel and a second position in which the refrigerant from the compressor flows to the vessel and is blocked from entering the reheat circuit; and

a heat exchanger configured and positioned to receive refrigerant from the first valve and to exchange heat with air flowing across the heat exchanger, the heat exchanger in fluid communication with the evaporator to provide refrigerant to the evaporator when the first valve is in the first position; and

a by-pass circuit configured and positioned to provide fluid communication between the suction side of the compressor and the heat exchanger, the by-pass circuit comprising a second valve to control the flow of refrigerant out of the reheat circuit and switchable from a first position in which refrigerant flows from the reheat circuit when the first valve is in the second position and a second position in which the flow of refrigerant is blocked from leaving the reheat circuit when the first valve is in the first position; and

a third valve configured and positioned to permit flow of refrigerant to the vessel in response to the first valve being in the first position and a refrigerant pressure in the reheat circuit being greater than a predetermined pressure.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2025
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 072298/0096 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2025
From: TYCO FIRE & SECURITY GMBH
To: JOHNSON CONTROLS LIGHT COMMERCIAL IP GMBH
Reel/Frame 071892/0225 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2025
From: TYCO FIRE & SECURITY GMBH
To: JOHNSON CONTROLS LIGHT COMMERCIAL IP GMBH
Reel/Frame 070179/0435 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067832/0947 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2010
From: KNIGHT, JOHN T.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 024576/0263 →