IP Library Granted Patent US 7,730,934
Granted Patent B2
US 7,730,934 · App. 11/750,382 · Granted Jun 8, 2010

Thixo-molding shot located downstream of blockage

Assignee: Husky Injection Molding Systems Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,730,934
App. No.
11/750,382
Granted
Jun 8, 2010
Kind
B2
Abstract

Disclosed is a metal molding process, including passing, through a conduit passageway, a volume of molten metal located downstream of a passageway blockage formable in the conduit passageway. Also disclosed is a molded article having a body made by a metal molding process, including passing, through a conduit passageway, a volume of molten metal located downstream of a passageway blockage formable in the conduit passageway.

Claims (17)

1. A metal molding process, comprising:

supplying a molten metal to a metal hot runner assembly ( 401 ) from a metal injection unit ( 403 B) via a nozzle ( 403 C);

supplying the molten metal from a metal hot runner assembly ( 401 ) to a mold cavity ( 412 ) of a metal molding system ( 403 A), the metal hot runner assembly ( 401 ) includes a metal molding conduit assembly ( 400 ) with a conduit passageway ( 402 ), the conduit passageway ( 402 ) defined by a conduit body member ( 408 ) that forms a central passageway configured to receive molten metal from the metal injection unit ( 403 B) and a plurality of drops ( 410 A, 410 B) leading to the mold cavity ( 412 );

forming a metal plug ( 406 ) in the central passageway configured to receive molten metal from the metal injection unit ( 403 B); and

catching the metal plug ( 406 ) in a plug catcher ( 430 ) so that the metal plug ( 406 ) does not disrupt flow of molten metal into the plurality of drops ( 410 A, 410 B) leading to the mold cavity ( 412 ).

2. The metal molding process of claim 1 , wherein:

the mold cavity ( 412 ) is defined by a mold ( 424 ) including a movable mold half ( 426 ) and a stationary mold half ( 428 ).

3. The metal molding process of claim 1 , further comprising:

liquefying the metal plug ( 406 ) caught in the plug catcher ( 430 ) by applied heating.

4. The metal molding process of claim 1 , further comprising:

forming respective metal plugs ( 416 A, 416 B, 416 C) in the plurality of drops ( 410 A, 410 B) leading to the mold cavity ( 412 ).

5. The metal molding process of claim 4 , further comprising:

heating the metal volumes ( 420 A, 420 B) downstream of the means ( 418 B, 418 C) for forming respective metal plugs ( 416 A, 416 B, 416 C) in the plurality of drops ( 410 A, 410 B) leading to the mold cavity ( 412 ).

6. The metal molding process of claim 4 , wherein:

the plurality of drops ( 410 A, 410 B) leading to the mold cavity ( 412 ) comprise respective egresses downstream of the means ( 418 B, 418 C) for forming respective metal plugs ( 416 A, 416 B, 416 C) configured to stop the respective metal plugs ( 416 A, 416 B, 416 C) from moving into the mold cavity ( 412 ).

7. The metal molding process according to any one of claims 1 to 6 , wherein:

forming a metal plug ( 406 ) includes cooling or heating.

Assignments (3)
RELEASE OF SECURITY AGREEMENT Recorded Jul 19, 2011
From: ROYAL BANK OF CANADA
To: HUSKY INJECTION MOLDING SYSTEMS LTD.
Reel/Frame 026647/0595 →
SECURITY AGREEMENT Recorded Jan 30, 2008
From: HUSKY INJECTION MOLDING SYSTEMS LTD.
To: ROYAL BANK OF CANADA
Reel/Frame 020431/0495 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2007
From: MANDA, JAN MARIUS, MR.
To: HUSKY INJECTION MOLDING SYSTEMS LTD.
Reel/Frame 019320/0397 →
Continuity (2)
Division 1129792600 · Dec 9, 2005
Related Publication 20070221353A1 · Sep 27, 2007