IP Library Granted Patent US 7,955,458
Granted Patent B2
US 7,955,458 · App. 11/775,957 · Granted Jun 7, 2011

Staging system for automated window or door fabrication

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,955,458
App. No.
11/775,957
Granted
Jun 7, 2011
Kind
B2
Abstract

A system that delivers window or door components to an assembly station where multiple components are assembled to form a multi-sided window or door frame or sash. A preparation station in proximity to the assembly station includes an alignment fixture for bringing multiple frame or sash components into alignment while a preceding frame or sash is being assembled at the assembly station. A conveyor moves aligned components of a next subsequent frame or sash to the assembly station while maintaining the alignment of said window components for clamping at the assembly station prior to assembly. One system is used to assemble vinyl door or window components by welding them together.

Claims (27)

1. A method for use in assembling multiple window or door components to form a plurality of multi-sided window or door frames or sashes comprising:

providing a plurality of support trees from which multiple pairs of base members and clamping fingers extend at spaced apart locations along a length of each support tree for supporting window or door components;

attaching multiple support trees to a movable carriage and relatively positioning said support trees at junction locations to support adjacent window or door components of said frames or sashes in multiple offset planes that are separated by a spacing between the pairs of base members and clamping fingers;

moving the carriage to a preparation station;

with the clamping fingers in an open configuration, bringing sets of window or door components into alignment with each other in the multiple offset planes by bringing said window or door components into spanning contact with base members on two relatively positioned support trees;

clamping the sets of window or door components in said multiple offset planes by moving the clamping fingers to a closed position to force the window or door components against the base members; and

moving the multiple frames or sashes from the preparation station to an assembly station spaced from the preparation station as a group while maintaining the alignment of said window components for assembly at the assembly station by moving the carriage.

2. The method of claim 1 wherein the assembly station is a welding station and wherein window or door components are welded to form an assembled frame or sash.

3. The method of claim 1 wherein window or door components that form multiple frames or sashes are stacked one above the other at both the preparation station and the assembly station.

4. The method of claim 1 wherein the window or door components are plastic that are fused, bonded, screwed, glued, or vibration welded together at the assembly station.

5. The method of claim 1 wherein the support trees maintains the components in touching engagement as they are moved to the assembly station.

6. The method of claim 1 wherein the movement of said carriage from the preparation station to the assembly station is a rotation.

7. The method of claim 1 wherein the movement of said carriage from the preparation station to the assembly station is a translation.

8. The method of claim 1 wherein the offset planes are oriented in a general horizontal plane and further wherein the door or window components are moved up and down and wherein the carriage is mounted to a conveyor for movement to and from the assembly station.

9. The method of claim 8 wherein the assembly station comprises a welder having welding fixtures at four corners and further wherein the elongated trees are lowered from above into position and for delivery of the aligned door or window components.

10. The method of claim 1 wherein the carriage moves the components together to the assembly station and wherein the pairs of base members and clamping fingers engage an assembled window or door frame or sash and moves the assembled unit to a post processing station, such as a cleaning station.

11. The method of claim 10 wherein the carriage delivers multiple assembled window or door frames or sashes to the cleaning unit on different levels.

12. The method of claim 1 wherein the support trees comprise multiple clamping fingers for clamping door or window components in multiple planes that are individually independently actuated to release or clamp window or door components independent of clamping and releasing of window or door components at other planes.

13. The method of claim 1 wherein the base members and clamping fingers are of different types that are configured for a particular profile or cross section of window or door component and all pairs of base members and clamping fingers in a given plane are of the same type.

14. The method of claim 13 wherein all pairs of base members and clamping fingers of coupled to the trees are of the same type so all window or door components carried by the carriage a given time are of the same type.

15. A method for use in assembling multiple window or door components of a particular profile or cross section to form a plurality of multi-sided window or door frames or sashes having that particular profile or cross section comprising:

providing sets of elongated support trees having multiple pairs of base members and clamping fingers spaced apart along a length of each support tree wherein engagement surfaces of said base member and clamping fingers are configured differently for supporting different profile window or door components;

attaching multiple elongated component support trees for a given profile window or door component to a movable carriage at junction locations to support adjacent window or door components of said frames or sashes in multiple offset planes that are separated by a spacing between the pairs of bases and clamping fingers;

moving the carriage to a preparation station;

with the clamping fingers in an open configuration bringing window or door components into alignment with each other in the multiple offset planes by bringing said window or door components into contact with base members;

clamping the sets of window or door components in said multiple offset planes by moving the clamping fingers to a closed position to force the window or door components against the base members; and

moving the multiple frames or sashes from the preparation station to an assembly station spaced from the preparation station as a group while maintaining the alignment of said window components for assembly at the assembly station by moving the carriage.

Assignments (9)
SECURITY INTEREST Recorded Aug 9, 2023
From: GED INTEGRATED SOLUTIONS, INC.
To: SYNOVUS BANK
Reel/Frame 064533/0230 →
RELEASE OF SECURITY INTEREST Recorded Jun 28, 2023
From: THE HUNTINGTON NATIONAL BANK (SUCCESSOR BY MERGER TO TCF NATIONAL BANK)
To: GED PURCHASER, INC.; GED INTEGRATED HOLDINGS, INC.; GED INTEGRATED SOLUTIONS, INC.; NORFIELD ACQUISITION, LLC
Reel/Frame 064149/0591 →
SECURITY INTEREST Recorded May 25, 2021
From: GED PURCHASER, INC.; GED INTEGRATED HOLDINGS, INC.; GED INTEGRATED SOLUTIONS, INC.; NORFIELD ACQUISITION, LLC
To: TCF NATIONAL BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 056392/0656 →
RELEASE OF SECURITY INTEREST Recorded Mar 6, 2020
From: FIFTH THIRD BANK, NATIONAL ASSOCIATION, FORMERLY KNOWN AS FIFTH THIRD BANK
To: GED INTEGRATED SOLUTIONS, INC.
Reel/Frame 052117/0127 →
SECURITY INTEREST Recorded Mar 4, 2020
From: GED PURCHASER, INC.; GED INTEGRATED HOLDINGS, INC.; GED INTEGRATED SOLUTIONS, INC.
To: TCF NATIONAL BANK
Reel/Frame 052159/0408 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NAME OF THE RECEIVING PARTY PREVIOUSLY RECORDED AT REEL: 036258 FRAME: 0198. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Aug 12, 2015
From: GED INTEGRATED SOLUTIONS, INC.
To: FIFTH THIRD BANK
Reel/Frame 036337/0475 →
SECURITY INTEREST Recorded Aug 3, 2015
From: GED INTEGRATED SOLUTIONS, INC.
To: FIFTH THIRD BANK, AS AGENT FOR SECURED PARTY
Reel/Frame 036258/0198 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2015
From: GED INTEGRATED SOLUTIONS, INC.
To: GED INTEGRATED SOLUTIONS, INC.
Reel/Frame 036017/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2007
From: AULETTA, RONALD A., MR.; GRISMER, JOHN, MR.; MCGLINCHY, TIMOTHY B., MR.
To: GED INTEGRATED SOLUTIONS, INC.
Reel/Frame 019666/0087 →