IP Library Granted Patent US 7,447,611
Granted Patent B2
US 7,447,611 · App. 11/801,221 · Granted Nov 4, 2008

Power generation performance analysis system and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,447,611
App. No.
11/801,221
Granted
Nov 4, 2008
Kind
B2
Abstract

A system and method is described herein that includes a software-based functionality to assess the relationship between reliability, operational, maintenance and plant betterment activities and to determine the frontier of efficient spending and other measures of performance to achieve a level of reliability that is based on data from units of similar design and performance.

Claims (45)

1. A method for providing dynamic comparative operational performance analyses comprising the steps of:

providing a dataset of user-selected data corresponding to a plurality of reference power generating units, the user-selected data comprising a plurality of variables;

determining a geometric center of the dataset;

determining an orientation for the dataset based on the geometric center;

converting the dataset to a predetermined coordinate system based on the geometric center;

categorizing data from the dataset into a plurality of hemispheres and quadrants based on the geometric center;

determining maximum and minimum values of variables in the dataset for frontier curves;

applying a statistical filter to the data from the dataset for each of the plurality of hemispheres and quadrants, generating a filtered data;

combining the filtered data into frontier data groups based on user inputs;

computing maxima and minima for complete frontier curves based on the frontier data groups;

optimizing data envelopment of the complete frontier curves based on the geometric center;

computing complete frontier curve base data values;

converting the complete frontier curve based on the geometric center of the dataset;

displaying a user-selected portion of the complete frontier curve; and

comparing a target unit's data with the user-selected portion of the complete frontier curve.

2. The method of claim 1 , wherein the plurality of variables comprises one or more of unit design characteristics, operations factors, and maintenance and plant betterment data, or combinations thereof.

3. The method of claim 1 , wherein the target unit is a reference generating unit.

4. The method of claim 1 comprising the additional step of:

displaying a linear trend of the dataset.

5. A system comprising:

a server, comprising:

a processor, and

a storage subsystem;

a database stored by the storage subsystem comprising:

a plurality of data corresponding to reference power generating units; and

a computer program stored by the storage subsystem, when executed causing the processor to:

select a dataset from the plurality of data corresponding to user selection criteria;

determine a complete frontier curve based on the dataset; and

compare data of a target unit with a portion of the complete frontier curve.

6. The system of claim 5 , wherein the computer program, when executed further causes the processor to display a linear trend of the dataset.

7. The system of claim 5 , wherein the target unit is a reference generating unit.

8. A system comprising:

a first server, comprising:

a processor, and

a first storage subsystem;

a second server, comprising:

a second storage subsystem;

a database stored by the second storage subsystem comprising:

a plurality of data corresponding to reference power generating units; and

a computer program stored by the first storage subsystem, when executed causing the processor to:

select a dataset from the plurality of data corresponding to a user selection;

determine a complete frontier curve based on the dataset; and

compare data of a target unit with a portion of the complete frontier curve.

9. The system of claim 8 , wherein the computer program, when executed further causes the processor to display a linear trend of the dataset.

10. The system of claim 8 , wherein the target unit is a reference generating unit.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE PREVIOUSLY RECORDED ON REEL 021738 FRAME 0649. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jul 17, 2012
From: FLUEGGE, RONALD M; JONES, RICHARD B
To: HSB SOLOMON ASSOCIATES, LLC
Reel/Frame 028571/0927 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2008
From: FLUEGGE, RONALD M; JONES, RICHARD B
To: HSB SOLOMON ASSOCIATES
Reel/Frame 021738/0649 →