IP Library Granted Patent US 7,834,479
Granted Patent B2
US 7,834,479 · App. 11/817,580 · Granted Nov 16, 2010

Methods and systems for intentionally isolating distributed power generation sources

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,834,479
App. No.
11/817,580
Granted
Nov 16, 2010
Kind
B2
Abstract

A method and system for operating a mini-grid including one or more power generation sources and one or more loads independently from a utility grid is provided, where the mini-grid is disconnected from the utility grid in response to a power disruption over the utility grid. A universal interconnect device forms a connection between the mini-grid and the utility grid. In the disconnected state, the mini-grid operates independently from the utility grid, such that the power generation sources of the mini-grid supply the loads. Frequency and voltage regulation are provided by the universal interconnect device through a monitoring function performed by a controller in conjunction with at least an energy storage device, which can absorb or generate power as needed.

Claims (35)

1. A method for operating a mini-grid including one or more power generation sources and one or more loads connected to a bus, comprising the steps of:

monitoring a condition of a utility grid;

disconnecting the mini-grid from the utility grid to operate the mini-grid independently in response to a power disruption over the utility grid;

monitoring at least one of a frequency and a voltage of power on the bus; and

providing an interconnect device connected to the bus, the interconnect device including at least one of: an energy storage device for absorbing or releasing real power to control the frequency of the power on the bus, and a power quality compensator for absorbing or releasing reactive power to control the voltage of the power on the bus.

2. The method of claim 1 , and further including the step of connecting the mini-grid to the utility grid upon receiving a signal from the utility grid.

3. The method of claim 1 , and further including the step of connecting the mini-grid to the utility grid upon sensing a normal operating state of the utility grid.

4. The method of claim 1 , wherein the step of monitoring the condition of the utility grid includes receiving a signal from the utility grid.

5. The method of claim 1 , wherein the step of monitoring the condition of the utility grid includes sensing an operating state of the utility grid.

6. The method of claim 1 , wherein after the disconnecting step, the mini-grid is operated independently of the utility grid.

7. The method of claim 6 , wherein during independent operation of the mini-grid, at least one DG source is operated to supply power to at least one load connected to the mini-grid.

8. The method of claim 1 , wherein the energy storage device includes at least one flywheel energy storage system.

9. The method of claim 1 , wherein the interconnect device includes at least the energy storage device, the power quality compensator, and a communication/control module for monitoring at least one of the frequency and the voltage of the bus.

10. A method for operating a mini-grid independently of a utility grid, comprising the steps of:

providing the mini-grid including one or more power generation sources and one or more loads connected to a bus;

monitoring at least one of a frequency and a voltage of power on the bus; and

providing an interconnect device connected to the bus, the interconnect device including at least one of: an energy storage device for absorbing or releasing real power to control the frequency of the power on the bus, and a power quality compensator for absorbing or releasing reactive power to control the voltage of the power on the bus.

11. The method of claim 10 , wherein the step of operating the interconnect device is carried out by adding or removing one of the power generation sources.

12. The method of claim 10 , wherein the interconnect device is operated by adding or removing one of the loads.

13. A system for operating a mini-grid including one or more power generation sources and one or more loads connected to a bus, comprising:

a switch for connecting the mini-grid to a utility grid; and

a universal interconnect device provided between the switch and the bus, the universal interconnect device configured to monitor a condition of the utility grid and disconnect the mini-grid from the utility grid in response to a power disruption over the utility grid;

the universal interconnect device further including a controller for monitoring at least one of a frequency and a voltage of power on the bus, the controller operable to activate at least one of an energy storage device and a power quality compensator to control the frequency or voltage of the power on the bus.

14. The system of claim 13 , wherein by disconnecting the mini-grid from the utility grid, the utility grid operates independently from the utility grid.

15. The system of claim 14 , wherein during independent operation of the mini-grid, at least one DG source is operated to supply power to at least one load connected to the mini-grid.

16. The system of claim 14 , wherein the controller activates the energy storage device to generate or absorb real power from the bus to control the frequency.

17. The system of claim 14 , wherein the controller activates the power quality compensator to generate or absorb reactive power from the bus to control the voltage.

18. The system of claim 13 , wherein the energy storage device includes at least one flywheel energy storage system.

19. The system of claim 13 , wherein the power quality compensator is an AC/DC inverter.

20. The system of claim 13 , wherein the bus is a three-phase AC bus.

21. A universal interconnect device for forming a connection between a utility grid and a mini-grid having one or more power generation sources and one or more loads connected to a bus, comprising:

a device for connecting the universal interconnect device to the bus;

a controller configured to monitor a condition of the utility grid and disconnect the mini-grid from the utility grid in response to a power disruption over the utility grid, such that after disconnection the mini-grid operates independently from the utility grid, where the controller monitors at least one of a frequency and a voltage of power on the bus; and

an energy storage device for absorbing or releasing real power to control the frequency of the power on the bus.

22. The universal interconnect device of claim 21 , and further including a power quality compensator for absorbing or releasing reactive power to control the voltage of the power on the bus.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Dec 10, 2015
From: PNC BANK, NATIONAL ASSOCIATION, D/B/A MIDLAND LOAN SERVICES, A DIVISION OF PNC BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT IN ITS CAPACITY AS THE COLLATERAL AGENT
To: BEACON POWER, LLC
Reel/Frame 037258/0168 →
SECURITY AGREEMENT Recorded May 14, 2012
From: BEACON POWER, LLC
To: PNC BANK, NATIONAL ASSOCIATION, D/B/A MIDLAND LOAN SERVICES, A DIVISION OF PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 028206/0248 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 20, 2012
From: BEACON POWER CORPORATION
To: BEACON POWER, LLC
Reel/Frame 027893/0036 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2008
From: CAPP, F. WILLIAM; LAZAREWICZ, MATTHEW L.; ROJAS, HERNAN ALEX
To: BEACON POWER CORPORATION
Reel/Frame 020799/0686 →