IP Library Granted Patent US 7,422,070
Granted Patent B2
US 7,422,070 · App. 11/823,437 · Granted Sep 9, 2008

Casing mandrel with well stimulation tool and tubing head spool for use with the casing mandrel

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,422,070
App. No.
11/823,437
Granted
Sep 9, 2008
Kind
B2
Abstract

A casing mandrel for an independent screwed wellhead includes a pin thread adapted for engagement with a box thread of a well stimulation tool lockdown nut for securing the well stimulation tool against the casing mandrel top end. A well stimulation tool and a tubing head spool for use with the casing mandrel are also provided.

Claims (39)

1. A method of preparing a well equipped with an independent screwed wellhead for production, comprising:

installing a casing mandrel in the independent screwed wellhead using a lockdown nut, the casing mandrel having a casing mandrel top end that includes a pin thread located above a top of the lockdown nut;

securing a well stimulation tool to the casing mandrel top end using a lockdown nut with a box thread that engages the pin thread on the casing mandrel top end to lock the well stimulation tool against the casing mandrel top end; and

mounting a high pressure valve or a blowout preventer and a blowout preventer protector to the well stimulation tool and connecting high pressure fracturing lines to the high pressure valve or the blowout preventer protector to permit well stimulation fluids to be pumped into a casing of the well.

2. The method as claimed in claim 1 further comprising:

lubricating a perforating gun into the casing of the well;

perforating the casing to provide fluid communication with a production zone of the well; and

lubricating the perforating gun out of the casing of the well.

3. The method as claimed in claim 2 further comprising flowing back high pressure well stimulation fluids after the high pressure well stimulation fluids have been pumped into the production zone.

4. The method as claimed in claim 3 further comprising determining whether a last production zone of the well has been stimulated.

5. The method as claimed in claim 4 wherein if the last production zone of the well has not been stimulated, the method further comprises:

lubricating in an isolation plug to isolate stimulated production zones from production zones that have not been stimulated.

6. The method as claimed in claim 5 further comprising:

lubricating a perforating gun into the casing of the well;

perforating the casing to provide fluid communication with a production zone that has not been stimulated; and

lubricating the perforating gun out of the casing of the well.

7. The method as claimed in claim 6 further comprising flowing back high pressure well stimulation fluids after the high pressure well stimulation fluids have been pumped into the production zone that had not been stimulated.

8. The method as claimed in claim 7 further comprising removing the well stimulation tool and mounting a tubing head spool to the casing mandrel.

9. The method as claimed in claim 8 further comprising running production tubing into the well.

10. The method as claimed in claim 9 further comprising mounting a tubing mandrel to the production tubing and landing the tubing mandrel in a tubing mandrel bowl of the tubing head spool.

11. The method as claimed in claim 10 further comprising mounting flow control equipment to a top of the tubing mandrel.

12. A method of preparing a well equipped with an independent screwed wellhead for production, comprising:

installing a casing mandrel that supports a production casing in the independent screwed wellhead using a lockdown nut, the casing mandrel having a casing mandrel top end that includes a pin thread located above a top of the lockdown nut;

securing a well stimulation tool to the casing mandrel top end using a lockdown nut with a box thread that engages the pin thread on the casing mandrel top end to lock the well stimulation tool against the casing mandrel top end; and

mounting a well fracturing assembly to the well stimulation tool and connecting high pressure fracturing lines to the well fracturing assembly to permit well stimulation fluids to be pumped through the production casing into a production zone of the well.

13. The method as claimed in claim 12 further comprising:

lubricating a perforating gun through the well fracturing assembly into the production casing of the well;

perforating the production casing to provide fluid communication with the production zone of the well; and

lubricating the perforating gun out of the production casing of the well through the well fracturing assembly.

14. The method as claimed in claim 13 further comprising pumping high pressure well stimulation fluids through the well fracturing assembly and the production casing into the production zone of the well.

15. The method as claimed in claim 14 further comprising flowing back high pressure well stimulation fluids after the high pressure well stimulation fluids have been pumped into the production zone of the well.

16. The method as claimed in claim 15 further comprising removing the well fracturing assembly and the well stimulation tool and mounting a tubing head spool to the casing mandrel.

17. The method as claimed in claim 16 further comprising running production tubing into the well.

18. The method as claimed in claim 17 further comprising mounting a tubing mandrel to the production tubing and landing the tubing mandrel in a tubing mandrel bowl of the tubing head spool.

19. The method as claimed in claim 18 further comprising mounting flow control equipment to a top of the tubing mandrel.

20. A method of preparing a well equipped with an independent screwed wellhead for production, comprising:

installing a casing mandrel that supports a production casing in the independent screwed wellhead using a lockdown nut, the casing mandrel having a casing mandrel top end that includes a pin thread located above a top of the lockdown nut;

securing a well stimulation tool to the casing mandrel top end using a lockdown nut with a box thread that engages the pin thread on the casing mandrel top end to lock the well stimulation tool against the casing mandrel top end; and

mounting a fracstack to the well stimulation tool and connecting high pressure fracturing lines to the fracstack to permit well stimulation fluids to be pumped through the fracstack and the production casing into a production zone of the well.

Assignments (7)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2021
From: OIL STATES INTERNATIONAL, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 055314/0482 →
MERGER Recorded Jan 11, 2013
From: STINGER WELLHEAD PROTECTION, INCORPORATED
To: OIL STATES ENERGY SERVICES, L.L.C.
Reel/Frame 029617/0280 →
CHANGE OF ASSIGNEE ADDRESS Recorded Jul 17, 2007
From: STINGER WELLHEAD PROTECTION, INC.
To: STINGER WELLHEAD PROTECTION, INC.
Reel/Frame 019579/0072 →
CHANGE OF NAME Recorded Jun 27, 2007
From: HWC ENERGY SERVICES, INC.
To: OIL STATES ENERGY SERVICES, INC.
Reel/Frame 019722/0699 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 27, 2007
From: HWCES INTERNATIONAL
To: HWC ENERGY SERVICES, INC.
Reel/Frame 019722/0837 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 27, 2007
From: OIL STATES ENERGY SERVICES, INC.
To: STINGER WELLHEAD PROTECTION, INC.
Reel/Frame 019734/0768 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 27, 2007
From: DALLAS, L. MURRAY; MCGUIRE, BOB
To: HWCES INTERNATIONAL
Reel/Frame 019539/0020 →