IP Library Granted Patent US 7,736,556
Granted Patent B2
US 7,736,556 · App. 11/829,811 · Granted Jun 15, 2010

Revised cure cycle for annular packing units

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,736,556
App. No.
11/829,811
Granted
Jun 15, 2010
Kind
B2
Abstract

A method to manufacture a blowout preventer seal including disposing at least one insert and at least one elastomeric material in a mold, heating the mold to a cure temperature, curing the at least one elastomeric material, measuring a temperature of the at least one elastomeric material during the curing, adjusting a cure time and the cure temperature based on the measured temperature of the elastomeric material, and removing the cured blowout preventer seal from the mold.

Claims (41)

1. A method to manufacture a blowout preventer seal, the method comprising:

disposing at least one rigid material insert and at least one elastomeric material in a mold;

heating the mold to a cure temperature;

curing the at least one elastomeric material;

measuring a temperature of the at least one elastomeric material during the curing;

adjusting a cure time and the cure temperature based on the measured temperature of the elastomeric material; and

removing the cured blowout preventer seal from the mold.

2. The method of claim 1 , further comprising determining a degree of curing of the elastomeric material.

3. The method of claim 2 , further comprising generating a finite element analysis thermal model of the blowout preventer seal during curing.

4. The method of claim 3 , further comprising using the finite element analysis thermal model to estimate a degree of curing based on a selected cure time and a selected cure temperature.

5. The method of claim 3 , further comprising correlating the finite element analysis thermal model with the cure time, measured temperature and degree of curing.

6. The method of claim 5 , further comprising manufacturing additional blowout preventer seals based on a result from the correlated finite element analysis thermal model.

7. The method of claim 6 , further comprising adjusting a cure temperature and a cure time based on a result from the finite element analysis thermal model.

8. The method of claim 6 , further comprising:

selecting a blowout preventer seal design;

generating a second finite element analysis thermal model for the selected design based on the correlated finite element analysis thermal model; and

manufacturing the blowout preventer seal based on a result of the second finite element analysis thermal model.

9. The method of claim 8 , wherein the manufacturing comprises selecting a cure time and a cure temperature based on a result of the second finite element analysis thermal model.

10. The method of claim 1 , wherein the blowout preventer seal comprises an annular packing unit.

11. The method of claim 1 , wherein the blowout preventer seal comprises at least one selected from the group consisting of variable ram packers, ram block bore, and ram block top seals.

12. The method of claim 1 , further comprising:

generating a three-dimensional blowout preventer seal model including the at least one rigid material insert disposed within a portion of an elastomeric body;

determining a degree of curing of the elastomeric material; and

generating a finite element analysis thermal model of the blowout preventer seal during curing.

13. The method of claim 12 , further comprising smoothing the at least one rigid material insert.

14. The method of claim 12 , further comprising smoothing the elastomeric body.

15. A method to manufacturing a blowout preventer seal, the method comprising:

generating a finite element analysis thermal model for a blowout preventer seal design including at least one rigid material insert disposed within at least a portion of an elastomeric body, wherein the finite element analysis thermal model is used to estimate a degree of curing of the at least one elastomeric material of the blowout preventer seal; and

manufacturing the blowout preventer seal based on a result of the finite element analysis thermal model.

16. The method of claim 15 , wherein the manufacturing comprises selecting a cure time and a cure temperature based on a result of the finite element analysis thermal model.

17. The method of claim 16 , wherein the manufacturing comprises curing an elastomeric material at the selected cure temperature for the selected cure time.

18. The method of claim 15 , wherein the manufacturing comprises:

curing an elastomeric material at a selected cure temperature for a selected cure time based on a result of the finite element analysis thermal model;

measuring a temperature of the elastomeric material during the curing; and

adjusting the selected cure time and the selected cure temperature based on the measured temperature.

19. The method of claim 18 , wherein the adjusting is further based on a result of the finite element analysis thermal model using the measured temperature.

20. The method of claim 15 , wherein the blowout preventer seal comprises an annular packing unit.

21. The method of claim 15 , wherein the blowout preventer seal comprises at least one selected from the group consisting of variable ram packers, ram block bore, and ram block top seals.

22. The method of claim 15 , wherein the step of generating a finite element analysis thermal model comprises generating a three-dimensional blowout preventer seal model including finite elements of the at least one rigid material insert and the elastomeric body.

23. The method of claim 22 , further comprising smoothing the at least one rigid material insert.

24. The method of claim 22 , further comprising smoothing the elastomeric body.

Assignments (7)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 4, 2009
From: HYDRIL COMPANY LP
To: HYDRIL USA MANUFACTURING LLC
Reel/Frame 022635/0159 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 5, 2008
From: HYDRIL LLC
To: HYDRIL USA MANUFACTURING LLC
Reel/Frame 021050/0491 →
MERGER Recorded Mar 28, 2008
From: HYDRIL COMPANY LP
To: HYDRIL GENERAL LLC
Reel/Frame 020718/0733 →
CHANGE OF NAME Recorded Mar 28, 2008
From: HYDRIL GENERAL LLC
To: HYDRIL LLC
Reel/Frame 020718/0758 →
CHANGE OF NAME Recorded Mar 14, 2008
From: HYDRIL GENERAL LLC
To: HYDRIL LLC
Reel/Frame 020655/0390 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2008
From: BUTUC, STEFAN; KHANDOKER, SHAFIQ
To: HYDRIL COMPANY LP
Reel/Frame 020650/0168 →
MERGER Recorded Mar 14, 2008
From: HYDRIL COMPANY LP
To: HYDRIL GENERAL LLC
Reel/Frame 020655/0297 →