IP Library Granted Patent US 7,818,071
Granted Patent B2
US 7,818,071 · App. 11/831,666 · Granted Oct 19, 2010

Method for controlling and/or optimizing production of oil and/or gas wells and facilities

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,818,071
App. No.
11/831,666
Granted
Oct 19, 2010
Kind
B2
Abstract

This invention discloses a system for controlling and optimizing production operations oil and/or gas production wells and facilities, which are equipped with sensors that generate raw reservoir, production and/or production equipment performance data. This system collects raw data processes it in a central data center to produce component data and system performance data.

Claims (16)

1. A method for controlling and optimizing production operations in clusters of oil and/or gas production wells and facilities, which are equipped with production, pressure, temperature, vibration, flow, seismic and/or other sensors that generate raw reservoir, production and/or production equipment performance data, the method comprising:

a) collecting said raw data in a number of central data surveillance centers;

b) processing, monitoring and/or analyzing trends in said collected raw data by at least one central expert support team and/or system, which converts these data and/or trends into actionable component data and total system performance data;

c) transferring said actionable component data to at least one regional asset operation control center;

d) transferring said actionable total system performance data to at least one regional total production optimization center, in which said actionable total system performance data and trends are interpreted, analysed and converted into actionable total asset control data that are subsequently transferred to at least one regional control center; and

e) optimizing and/or controlling production of said clusters by action taken in at least one regional asset operation control center, said optimization and/or controlling being based on the actionable component data and the actionable total asset control data;

wherein the number of central data surveillance centers is more than three times smaller than the number of regional asset operation control centers and/or the number of regional total production optimization centers.

2. A method for controlling and optimizing production operations in clusters of oil and/or gas production wells and facilities, which are equipped with production, pressure, temperature, vibration, flow, seismic and/or other sensors that generate raw reservoir, production and/or production equipment performance data, the method comprising:

a) collecting said raw data in at least one central data surveillance center;

b) processing, monitoring and/or analyzing trends in said collected raw data by at least one central expert support team and/or system, which converts these data and/or trends into actionable component data and total system performance data;

c) transferring said actionable component data to at least one regional asset operation control center;

d) transferring said actionable total system performance data to at least one regional total production optimization center, in which said actionable total system performance data and trends in said actionable total system performance data are interpreted, analysed and converted into actionable total asset control data that are subsequently transferred to at least one regional control center; and

e) optimizing and/or controlling production of said clusters by action taken in at least one regional asset operation control center, said optimization and/or controlling being based on the actionable component data and the actionable total asset control data;

wherein at least one central expert support team and/or system associated with said at least one central data surveillance center monitors data relating to vibration, temperature, pressure and/or other data about the oil and/or gas production and/or operations of pumps, compressors and/or other rotating equipment deployed in the oil and/or gas production and/or injection wells, pipelines and/or production facilities of various assets and processes, and compares and analyzes trends in these data in order to derive actionable component performance data that enable staff in one or more regional asset operation control centers to adjust well flow and/or sub-systems to inhibit excessive wear and/or damage of the rotating equipment, wells and/or other facilities.

3. The method of claim 2 wherein, if vibration, temperature and/or pressure in a specific pump, compressor and/or other piece of rotating equipment is significantly higher than that of other similar rotating equipment, the actionable component performance data include a rotating equipment overload warning.

4. The method of claim 3 wherein, if vibration, temperature and/or pressure in a specific pump, compressor and/or other piece of rotating equipment is significantly higher than that of other similar rotating equipment, a regional total production optimization center generates actionable total asset control data, which comprise an asset operations scheme in which the performance of the specific pump, compressor and/or other piece of rotating equipment is reduced and/or recommendations are made to maintain, repair and/or replace the specific pump, compressor and/or other piece of rotating equipment within a specific period of time.

Assignments (2)
CHANGE OF NAME Recorded Mar 7, 2022
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 059694/0819 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 11, 2007
From: HARTKAMP, PETER LAURENS; HENDRIKSEN, SEBASTIAAN ARNOLD PAUL JOSEPH
To: SHELL OIL COMPANY
Reel/Frame 019959/0190 →