IP Library Patent Application 11834331
Patent Application
App. No. 11/834,331

INTEGRATION OF REORDER-POINT BASED PLANNING AND TIME-PERIOD PLANNING

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
11/834,331
Abstract

A system and method to perform time period planning and reorder point planning in a single planning run. Forecast data for a first subset of locations and inventory data for a second subset of locations is supplied to the planning system. Time period planning is performed on the first subset of locations and reordering point planning is performed on the second subset of locations in the same planning run.

Claims (50)

1 . A method comprising:

receiving a forecast demand of location products for a first subset of location products in a distribution network;

obtaining inventory data about location products for a second subset of location products in the distribution network; and

using time period planning for the location products of the first subset and reorder point planning for location products of the second subsets respectively in a single planning run to generate a distribution plan for all location products.

2 . The method of claim 1 wherein using reorder point planning comprises:

using time period planning with a horizon set to one period.

3 . The method of claim 1 wherein using comprises:

applying time period planning to all parent location products having a child location product in the first subset.

4 . The method of claim 1 further comprising:

deploying a planned quantity of the location product to each product location in the distribution network.

5 . The method of claim 1 further comprising:

determining for each location product an excess or a shortage; and

generating a stock transfer order between a first location product having an excess and a second location product having a shortage.

6 . The method of claim 5 wherein determining an excess for a location product in the second subset comprises:

increasing a maximum stock level by an excess percentage to get an excess maximum stock level; and

reducing a physical stock value by the excess maximum stock level and distribution demand.

7 . The method of claim 5 wherein determining a shortage for a location in the second subset comprises:

reducing a reorder point by a shortage percentage to get a reduced reorder point; and

comparing the reduced reorder point to an aggregate of physical stock, goods in transit and open order quantities.

8 . A system comprising:

a demand forecasting module to generate a demand forecast for a first subset of location products in a supply chain;

an inventory data source to supply inventory data for a second subset of location products in the supply chain; and

a distribution resource planning (DRP) module to generate a distribution plan for the first subset of locations using time phased planning and the second subset of location using reorder point planning in a single planning run.

9 . The system of claim 8 wherein the DRP module comprises:

a location product identifier to determine if the location product is in the first or the second subset

a time period planning (TPP) module to accept demand forecast data and generate a distribution plan for the first subset; and

a calculation module to accept inventory data for the second subset and generate a distribution plan for the second subset by calling the time period planning module setting the horizon to a single period.

10 . The system of claim 9 where the calculation module comprises:

a shortage calculator; and

an excess calculator.

11 . The system of claim 8 further comprising:

a deployment module to create stock transfer orders (STO's) to fulfill the distribution plan.

12 . The system of claim 11 wherein the inventory balancing module generates STO's between two locations when one location has a shortage and the other location has an excess.

13 . A machine readable medium having instructions therein that when executed by the machine cause the machine to:

receive a forecast demand of a product for a first subset of location products in a distribution network;

obtain inventory data about location products for a second subset of location products in the distribution network; and

use time phased planning and reorder point planning to generate a distribution plan for the location products of the first and second subsets respectively in a single planning run.

14 . The machine readable medium of claim 13 , wherein instructions causing the machine to use cause the machine to:

apply time phased planning to all parent location products having a child location in the first subset.

15 . The machine readable medium of claim 13 , having instructions that when executed further cause the machine to:

generate stock transfer orders to deploy a planned quantity of the location product to each location product in the distribution network.

16 . The machine readable medium of claim 13 , having instructions that when executed further cause the machine to:

determine for each location product an excess or a shortage; and

generate a stock transfer order between a first location product having an excess and a second location product having a shortage.

17 . The machine readable medium of claim 16 , wherein instructions causing the machine to determine an excess comprise instructions causing the machine to:

increase a maximum stock level by an excess percentage to get an excess maximum stock level; and

reduce a physical stock value by the excess maximum stock level and distribution demand.

18 . The machine readable medium of claim 16 , wherein instructions causing the machine to determine a shortage comprise instructions causing the machine to:

reduce a reorder point by a shortage percentage to get a reduced reorder point; and

compare the reduced reorder point to an aggregate of physical stock and goods in transit and open order quantities.

Assignments (2)
CHANGE OF NAME Recorded Aug 26, 2014
From: SAP AG
To: SAP SE
Reel/Frame 033625/0223 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 27, 2007
From: WILKING, MICHAEL; FEIKS, FRANK; VERMA, SAMEER; HEMMING, DIRK; SCHWEITZER, MICHAEL; BENDER, THORSTEN
To: SAP AG
Reel/Frame 019749/0280 →