IP Library Granted Patent US 8,512,488
Granted Patent B2
US 8,512,488 · App. 11/836,900 · Granted Aug 20, 2013

Ni—Fe based forging superalloy excellent in high-temperature strength and high-temperature ductility, method of manufacturing the same, and steam turbine rotor

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,512,488
App. No.
11/836,900
Granted
Aug 20, 2013
Kind
B2
Abstract

An Ni—Fe based superalloy forging material including 30 to 40 wt % of Fe, 14 to 16 wt % of Cr, 1.2 to 1.7 wt % of Ti, 1.1 to 1.5 wt % of Al, 1.9 to 2.2 wt % of Nb, 0.05 wt % or less of C and the remainder of Ni and inevitable impurities is solution-treated and aged, and thereby γ′ phase (Ni 3 Al) having an initial mean particle size of about 50 to about 100 nm is precipitated. This superalloy is excellent in high-temperature strength and high-temperature ductility and can produce a large forged product of 10 ton or more. Therefore, this material is suitable for use as the material of a steam turbine rotor having a main steam temperature of 650° C. or more.

Claims (6)

1. An Ni—Fe based forging superalloy comprising 30 to 40 wt % of Fe, 14 to 16 wt % of Cr, 1.2 to 1.7 wt % of Ti, 1.1 to 1.5 wt % of Al, 1.9 to 2.2 wt % of Nb, 0.05 wt % or less of C, and the remainder of Ni and inevitable impurities, wherein γ′ phase (Ni 3 Al) precipitate having an initial mean particle size of 50 to 100 nm is enhanced in the grain, wherein said Ni—Fe based superalloy forging material has a 0.2% yield strength of 450 to 600 MPa at 700° C. and reduction of area of 25% or greater, and wherein the C is bonded with Nb and Ti to form MC carbide.

2. A steam turbine rotor formed of an Ni—Fe based superalloy forging material comprising 30 to 40 wt % of Fe, 14 to 16 wt % of Cr, 1.2 to 1.7 wt % of Ti, 1.1 to 1.5 wt % of Al, 1.9 to 2.2 wt % of Nb, 0.05 wt % or less of C, and the remainder of Ni and inevitable impurities, wherein γ′ phase (Ni 3 Al) precipitate having an initial mean particle size of 50 to 100 nm is enhanced in the grain, wherein said Ni—Fe based superalloy forging material has a 0.2% yield strength of 450 to 600 MPa at 700° C. and reduction of area of 25% or greater, and wherein the C is bonded with Nb and Ti to form MC carbide.

3. The steam turbine rotor according to claim 2 , wherein the rotor is an integral structure in which a welding portion is not included.

4. The steam turbine rotor according to claim 2 , wherein the rotor is used for an ultrahigh-pressure turbine rotor of a steam turbine power plant having a main steam temperature of about 650° C. or about 700° C.

5. The steam turbine rotor according to claim 2 , wherein the rotor is used for a large rotor having a weight of 10 ton to 20 ton.

6. A steam turbine rotor which is formed by a welding material of an Ni—Fe based superalloy forging material according to claim 2 bonded to 12 Cr steel by welding, and is used for a turbine rotor having a weight of more than 20 ton in a steam turbine power plant having a main steam temperature of about 650° C. or 700° C.

Assignments (9)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
CHANGE OF NAME Recorded Jul 29, 2020
From: NIKKO MEC CO., LTD
To: JAPAN STEEL WORKS M&E, INC.
Reel/Frame 053336/0169 →
COMPANY SPLIT Recorded Jul 29, 2020
From: THE JAPAN STEEL WORKS, LTD.
To: NIKKO MEC CO., LTD.
Reel/Frame 053337/0972 →
CHANGE OF ADDRESS Recorded Jul 28, 2020
From: THE JAPAN STEEL WORKS, LTD.
To: THE JAPAN STEEL WORKS, LTD.
Reel/Frame 053326/0960 →
CONFIRMATORY ASSIGNMENT Recorded Oct 8, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 033917/0209 →
CHANGE OF NAME Recorded May 22, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 033003/0648 →
CORRECTIVE ASSIGNMENT TO CORRECT THE LIST OF ASSIGNEES (BY ADDING ONE) AND ASSIGNEE'S ADDRESS PREVIOUSLY RECORDED ON REEL 019868 FRAME 0158. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jul 16, 2013
From: IMANO, SHINYA; KAWANAKA, HIROTSUGU; DOI, HIROYUKI; TAKAHASHI, TATSUYA; AZUMA, TSUKASA; KAJIKAWA, KOJI
To: HITACHI, LTD.; THE JAPAN STEEL WORKS, LTD.
Reel/Frame 030813/0210 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2007
From: IMANO, SHINYA; KAWANAKA, HIROTSUGU; DOI, HIROYUKI; TAKAHASHI, TATSUYA; AZUMA, TSUKASA; KAJIKAWA, KOJI
To: THE JAPAN STEEL WORKS, LTD.
Reel/Frame 019868/0158 →