IP Library Granted Patent US 7,843,834
Granted Patent B2
US 7,843,834 · App. 11/900,202 · Granted Nov 30, 2010

Use of minimal propagation delay path to optimize a mesh network

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,843,834
App. No.
11/900,202
Granted
Nov 30, 2010
Kind
B2
Abstract

The present technology relates to protocols relative to utility meters associated with an open operational framework. More particularly, the present subject matter relates to protocol subject matter for advanced metering infrastructure, adaptable to various international standards, while economically supporting a 2-way mesh network solution in a wireless environment, such as for operating in a residential electricity meter field. The present subject matter supports meters within an ANSI standard C12.22/C12.19 system while economically supporting a 2-way mesh network solution in a wireless environment, such as for operating in a residential electricity meter field, all to permit cell-based adaptive insertion of C12.22 meters within an open framework. Particular present features relate to the use of minimal propagation delay path to optimize a mesh network.

Claims (387)

1. A method for optimizing an advanced metering system mesh network, comprising:

establishing a network including a central facility root node and a plurality of linked node devices, at least some of the node devices comprising metrology devices;

configuring the network for bi-directional communications between the central facility root node and each of the plurality of node devices;

computing an average local propagation delay for each node device for each one-hop link to itself;

computing a total value of propagation delay along each path from each node device to the central facility root node based on the average local propagation delay and global propagation delay values stored in immediate neighbor devices;

selecting at each node device the lowest value of total values of propagation delay to define its own global propagation delay value; and

conducting communications using the path corresponding to the selected value,

whereby communications among nodes within the network is optimized; and

wherein the average local propagation delay for each one-hop link is computed using the relationship:

D

=

T

d

+

T

r

(

1

-

P

P

)

where D is the average local propagation delay, T d is time needed by a packet to travel from a transmitter to a receiver, P is packet success rate, and T r is wait time between transmissions.

2. A method as in claim 1 , further comprising:

sharing the global propagation delay value for each node device with every other node device accessible within its range,

calculating a global propagation delay to the central facility root node for each respective node device given only the average local propagation delay for the respective node device and shared values from its immediate neighbors.

3. A method as in claim 2 , wherein each node device shares its own global propagation delay value by updating its message header.

4. A method as in claim 1 , wherein the average local propagation delay is updated after each use of any given link.

5. A method as in claim 1 , wherein the packet success rate is updated after each packet transmission attempt with a sliding average using the relationship:

P

(

n

)

=

PS

(

n

)

N

av

+

N

av

-

1

N

av

P

(

n

-

1

)

where P(n) is the packet success rate for a given node n, N av is the number of transmissions used to compute the average, and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

6. A method as in claim 5 , wherein the propagation delay of any link is updated using the relationship:

D

r

(

n

)

=

{

N

av

D

r

(

n

-

1

)

+

1

N

av

-

1

if

PS

(

n

)

=

0

(

N

av

-

1

)

D

r

(

n

-

1

)

D

r

(

n

-

1

)

+

N

av

if

PS

(

n

)

=

1

where Dr(n) is the propagation delay of a link for transmission n and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

7. A method for optimizing an advanced metering system mesh network, comprising:

establishing a network including a central facility root node and a plurality of linked node devices, at least some of the node devices comprising metrology devices;

configuring the network for bi-directional communications between the central facility root node and each of the plurality of node devices;

computing an average local propagation delay for each one-hop link;

propagating global propagation delay information from the central facility root node to each of the node devices on a step by step basis;

storing global propagation delay information at each node device; and

conducting communications using a path corresponding to the lowest value of total propagation delay based on the stored global propagation delay information and the average local propagation delay,

whereby each node device selects a communications path based only on knowledge of its own average local propagation delay and the global propagation delay information from immediate neighbor node devices; and

wherein the average local propagation delay for each one-hop link is computed using the relationship:

D

=

T

d

+

T

r

(

1

-

P

P

)

where D is the average local propagation delay, T d is time needed by a packet to travel from a transmitter to a receiver, P is packet success rate, and T r is wait time between transmissions.

8. A method as in claim 7 , wherein each node device makes available its own global propagation delay value by updating its message header.

9. A method as in claim 7 , wherein the average local propagation delay is updated after each use of any given link.

10. A method as in claim 7 , wherein the packet success rate is updated after each packet transmission attempt with a sliding average using the relationship:

P

(

n

)

=

PS

(

n

)

N

av

+

N

av

-

1

N

av

P

(

n

-

1

)

where P(n) is the packet success rate for a given node n, N av is the number of transmissions used to compute the average, and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

11. A method as in claim 10 , wherein the propagation delay of any link is updated using the relationship:

D

r

(

n

)

=

{

N

av

D

r

(

n

-

1

)

+

1

N

av

-

1

if

PS

(

n

)

=

0

(

N

av

-

1

)

D

r

(

n

-

1

)

D

r

(

n

-

1

)

+

N

av

if

PS

(

n

)

=

1

where Dr(n) is the propagation delay of a link for transmission n and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

12. An advanced metering system mesh network, comprising:

a central facility root node; and

a plurality of node devices, each node device configured for bi-directional communications with said central facility root node, at least some of the node devices comprising metrology devices;

wherein each node device is further configured to compute an average local propagation delay for each one-hop link to itself in the mesh network and to select a shortest transmission path to said central facility root node based only on its own computed average propagation delay and global propagation delay information stored in its immediate neighbors;

whereby communications between said central facility root node and said plurality of node devices are optimized; and

wherein each node device is configured to compute its average local propagation delay for each one-hop link using the relationship:

D

=

T

d

+

T

r

(

1

-

P

P

)

where D is the average local propagation delay, T d is time needed by a packet to travel from a transmitter to a receiver, P is packet success rate, and T r is wait time between transmissions.

13. An advanced metering system mesh network as in claim 12 , wherein said central facility root node is configured to propagate global propagation delay information to each node device on a step by step basis.

14. An advanced metering system mesh network as in claim 12 , wherein each node device is configured to update its average local propagation delay calculation after each use of any given link.

15. An advanced metering system mesh network as in claim 12 , wherein each node device is configured to update its packet success rate after each packet transmission attempt with a sliding average using the relationship:

P

(

n

)

=

PS

(

n

)

N

av

+

N

av

-

1

N

av

P

(

n

-

1

)

where P(n) is the packet success rate for a given node n, N av is the number of transmissions used to compute the average, and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

16. An advanced metering system mesh network as in claim 15 , wherein each node device is configured to update the propagation delay to any other linked node device using the relationship:

D

r

(

n

)

=

{

N

av

D

r

(

n

-

1

)

+

1

N

av

-

1

if

PS

(

n

)

=

0

(

N

av

-

1

)

D

r

(

n

-

1

)

D

r

(

n

-

1

)

+

N

av

if

PS

(

n

)

=

1

where Dr(n) is the propagation delay of a link for transmission n and PS(n) is an indication of success or failure at attempt n where PS(n)=0 if transmission n failed and PS(n)=1 if transmission n succeeded.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2016
From: ITRON, INC.
To: ITRON FRANCE S.A.S.
Reel/Frame 039629/0872 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2016
From: ITRON FRANCE S.A.S.
To: ITRON GLOBAL SARL
Reel/Frame 039630/0787 →
SECURITY AGREEMENT Recorded Aug 16, 2011
From: ITRON, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 026761/0069 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 25, 2008
From: PICARD, GILLES
To: ITRON, INC.
Reel/Frame 021587/0078 →