IP Library Granted Patent US 7,920,938
Granted Patent B2
US 7,920,938 · App. 11/917,837 · Granted Apr 5, 2011

Concept for monitoring the manufacture of objects consisting of multiple material layers

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,920,938
App. No.
11/917,837
Granted
Apr 5, 2011
Kind
B2
Abstract

The manufacture of an object consisting of multiple material layers successively built up one upon the other can be monitored in an advantageous manner in that after the application of a material layer, a height profile of a circumference of the object is established, such that after the application of each material layer, a comparison with a reference information can be used for evaluating whether the preceding production step delivered a result which enables to draw the conclusion of a faultless application of the material layer.

Claims (16)

1. Method for monitoring a manufacture of an object, said object having a first material layer and a second material layer lying on top of the first material layer, comprising the following steps:

determining a height profile of the first material layer after applying the first material layer on a layer carrier;

comparing the height profile of the first material layer to a reference information;

in case that in the comparison step a first result is obtained indicating an intact application of the first layer, supplying release information, by which a release of the application of the second material layer onto the first material layer can be prompted;

in case that in the comparison step a second result is obtained indicating a faulty application of the first material layer, taking an error action;

the reference information comprises a desired height profile and the comparison effects the first result when the height profile deviates from the desired height profile by less than a predetermined tolerance threshold, and wherein the comparison otherwise obtains the second result;

when the first result has been obtained in the comparison step, the method includes performing an update step whereby a new desired height profile is formed as the reference information from a linear combination of the desired height profile and a desired thickness profile describing an ideal thickness course of the second material layer;

wherein the determination of a height profile of the second material layer after applying the second material layer on the first material layer; and

wherein the height profile of the applied second material layer is compared with the new desired height profile and, in case that in this comparison step a result is obtained indicating a faulty application of the second material layer, taking an error action.

2. Method according to claim 1 , in which the predetermined desired height profile is stored in a memory and is read out from the memory after the application of the first material layer.

3. Method according to claim 2 , which, when the first result had been obtained in the comparison step, includes an update step, wherein in the update step a new desired height profile is formed as the reference information from the linear combination of the desired height profile and a desired thickness profile describing an ideal thickness course of the second material layer.

4. Method according to claim 2 , which, when the first result had been obtained in the comparison step, includes an update step, wherein in the update step a new desired height profile is formed as the reference information from the linear combination of the height profile and a desired thickness profile describing an ideal thickness course of the second material layer.

5. Method according to any of the claims 1 , 2 , 3 , and 4 , in which the error action comprises marking the object as flawed.

6. Method according to any of the claims 1 , 2 , 3 , and 4 , in which the error action comprises preventing the application of the second material layer.

7. Method according to any of the claims 1 , 2 , 3 and 4 , wherein the object is a tire.

8. Computer program with a program code for performing the method for monitoring a manufacturing process according to claim 1 , when the program is running on a computer.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Jan 5, 2022
From: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS COLLATERAL AGENT
To: THE GOODYEAR TIRE & RUBBER COMPANY
Reel/Frame 059552/0015 →
SECURITY AGREEMENT Recorded Jun 11, 2012
From: THE GOODYEAR TIRE & RUBBER COMPANY
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 028353/0955 →
SECURITY AGREEMENT Recorded Jun 11, 2012
From: THE GOODYEAR TIRE & RUBBER COMPANY
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS COLLATERAL AGENT
Reel/Frame 028355/0013 →