IP Library Granted Patent US 8,337,163
Granted Patent B2
US 8,337,163 · App. 11/950,976 · Granted Dec 25, 2012

Fiber composite half-product with integrated elements, manufacturing method therefor and use thereof

Assignee: General Electric Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,337,163
App. No.
11/950,976
Granted
Dec 25, 2012
Kind
B2
Abstract

A prefabricated half-product for use in manufacture of a fiber-reinforced composite part of a wind turbine is provided, the half-product comprising at least one fiber mat and at least one inlay which is attached to the at least one fiber mat such that the relative position of the at least one inlay with respect to the at least one fiber mat remains substantially fixed during the manufacture of the fiber-reinforced composite part of the wind turbine. Furthermore, a method for manufacturing the half-product and method for the use of the half-product are provided.

Claims (30)

1. A prefabricated half-product for use in manufacture of a fiber-reinforced composite part of a wind turbine, comprising an inlay and a fiber mat, wherein the inlay comprises a metal or reinforced carbon fiber composite material and is attached to a surface of the fiber mat magnetically, or by gluing, sewing, tethering, stapling, clipping, clamping or riveting, such that the relative position of the inlay with respect to the fiber mat remains substantially fixed during the manufacture of the fiber-reinforced composite part of the wind turbine.

2. The half-product according to claim 1 , wherein at least two inlays are attached to the surface of the fiber mat, such that the relative position of the at least two inlays to each other on the fiber mat remains substantially fixed during the manufacture of the fiber-reinforced composite pan of the wind turbine.

3. The half-product according to claim 1 , wherein a filler material is arranged on the fiber mat.

4. The half-product according to claim 1 , wherein the inlay is attached between two fiber mats.

5. The half-product according to claim 4 , wherein the inlay is attached between the two fiber mats by at least one of pre-laminating the two fiber mats and partially laminating the two fiber mats in a region close to the inlay.

6. The half-product according to claim 1 , wherein the inlay comprises a clip, a clamp or a hook for attaching the inlay to the fiber mat.

7. The half-product according to claim 1 , wherein the inlay comprises a fixing eyelet, a recess and a groove-shaped depression for attaching the inlay to the fiber mat.

8. The half-product according to claim 1 , wherein the inlay comprises a carrot, a bushing, a threaded rod, a bolt, a hinge, a fixing point or a flange for use during transport, assembly, repair or service of the wind turbine or parts thereof or for attaching the fiber-reinforced composite part to another part of the wind turbine or to parts thereof.

9. The half-product according to claim 1 , wherein the inlay comprises an aerodynamic means selected from a group consisting of a blade tip a leading edge and a break flap.

10. A method for forming, a pre-fabricated half-product for use in manufacture of a fiber-reinforced composite part of a wind turbine, comprising:

providing a first fiber mat; and

attaching an inlay comprising a metal or reinforced carbon fiber composite material to a surface of the first fiber mat by gluing, sewing, tethering, stapling, clipping, clamping or riveting, such that a relative position of the inlay with respect to the first fiber mat remains substantially fixed during the manufacture of the fiber-reinforced composite part of the wind turbine.

11. The method according to claim 10 , further comprising:

arranging the inlay in a holder comprising a fastener for the inlay.

12. The method according to claim 10 , further comprising:

arranging a second fiber mat on the inlay.

13. The method according to claim 10 , further comprising:

pre-impregnating or pre-laminating the first fiber mat.

14. The method according to claim 10 , further comprising:

arranging a filler material on the first fiber mat.

15. The method according to claim 10 , further comprising:

cutting into parts or tailoring the first fiber mat with the attached inlay such that half-product or half-products are trimmed to fit together with at least one further mat for forming the fiber-reinforced composite part of a wind turbine in a mold.

16. A method for forming a fiber-reinforced composite part of a wind turbine, comprising:

arranging, a pre-fabricated half-product in a mold, the pre-fabricated half-product comprising a fiber mat and a metal or reinforced carbon fiber composite inlay attached to a surface of the fiber mat;

arranging at least one further fiber mat in the mold such that the at least one further fiber mat is in contact with the pre-fabricated half-product;

impregnating fiber such that the pre-fabricated half-product and the at least one further fiber mat are resin impregnated; and

curing the resin to form the fiber-reinforced composite part of the wind turbine.

17. The method according to claim 16 , further comprising:

providing a holder comprising a fastener for the inlay.

18. The method according to claim 16 , wherein the fiber-reinforced composite part is a blade or a housing of a wind turbine or a part thereof.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 22, 2024
From: LM WIND POWER US TECHNOLOGY APS
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 066869/0770 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2023
From: GENERAL ELECTRIC COMPANY
To: LM WIND POWER US TECHNOLOGY APS
Reel/Frame 065531/0160 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2007
From: GE WIND ENERGY GMBH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 020205/0271 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2007
From: NIES, JACOB JOHANNES
To: GE WIND ENERGY GMBH
Reel/Frame 020205/0283 →
Continuity (1)
Related Publication 20090148655A1 · Jun 11, 2009