IP Library Granted Patent US 8,186,161
Granted Patent B2
US 8,186,161 · App. 11/956,457 · Granted May 29, 2012

System and method for controlling an expansion system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,186,161
App. No.
11/956,457
Granted
May 29, 2012
Kind
B2
Abstract

A control system includes a temperature sensor communicatively coupled to an exit of an expander of an expansion system and configured to detect temperature of the working fluid flowing through the exit of the expander. A pressure sensor is communicatively coupled to the exit of the expander and configured to detect pressure of the working fluid flowing through the exit of the expander. A controller is configured to receive output signals from the temperature sensor and the pressure sensor and control operation of one or more components of the expansion system so as to control the thermodynamic conditions at the exit of the expander while driving a quality of vapor of the working fluid at the exit of the expander towards a predetermined degree of superheat.

Claims (13)

1. A method for controlling thermodynamic conditions at an exit of an expander of an expansion system; the method comprising:

detecting temperature of a working fluid flowing through the exit of the expander;

detecting pressure of the working fluid flowing through the exit of the expander; and

controlling operation of at least one of a condenser, and an expander inlet guide vane of the expansion system based on detected temperature and pressure of the working fluid flowing through the exit of the expander so as to drive a quality of vapor of the working fluid at the exit of the expander towards a predetermined degree of superheat and maintain a quality of vapor of the working fluid at an inlet of the expander below one.

2. A method comprising:

circulating a working fluid through a rankine cycle system coupled to a heat source, wherein circulating the working fluid comprises removing heat from the heat source; and

detecting temperature of the working fluid flowing through an exit of an expander of the rankine cycle system;

detecting pressure of the working fluid flowing through the exit of the expander of the rankine cycle system; and

controlling operation of at least one of a condenser and an expander inlet guide vane based on detected temperature and pressure of the working fluid flowing through the exit of the expander so as to drive a quality of vapor of the working fluid at the exit of the expander towards a predetermined degree of superheat and maintain a quality of vapor of the working fluid at an inlet of the expander below one.

3. The method of claim 2 , wherein circulating the working fluid through the rankine cycle system comprises circulating the working fluid through an evaporator, the expander, and the condenser.

4. The method of claim 3 , further comprising transferring the working fluid from the condenser to the evaporator via a pump.

5. The method of claim 4 , further comprising controlling flow of the working fluid from the condenser to evaporator via a pump bypass control valve provided in a pump bypass path between the condenser and evaporator.

6. The method of claim 5 , comprising controlling the pump speed, the pump bypass control valve, or a combination thereof so as to control the thermodynamic conditions at the exit of the expander.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY ENTITY PREVIOUSLY RECORDED AT REEL: 48489 FRAME: 001. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Apr 11, 2019
From: GENERAL ELECTRIC COMPANY
To: AI ALPINE US BIDCO INC
Reel/Frame 049858/0407 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 3, 2019
From: GENERAL ELECTRIC COMPANY
To: AI ALPINE US BIDCO LLC
Reel/Frame 048489/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2007
From: AST, GABOR; BARTLETT, MICHAEL ADAM; FREY, THOMAS JOHANNES; KOPECEK, HERBERT; KLOCKOW, HELGE BURGHARD HERWIG; LEHAR, MATTHEW ALEXANDER
To: GENERAL ELECTRIC COMPANY
Reel/Frame 020247/0005 →