IP Library Granted Patent US 7,882,892
Granted Patent B2
US 7,882,892 · App. 11/988,144 · Granted Feb 8, 2011

Well having inductively coupled power and signal transmission

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,882,892
App. No.
11/988,144
Granted
Feb 8, 2011
Kind
B2
Abstract

Well for production of hydrocarbons, comprising a hole drilled down into an underground, a casing fastened to the hole wall, a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone, a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well, distinguished in that the well further comprises: a primary coil arranged concentrically about the production pipe, a secondary coil arranged concentrically about the production pipe, a load connected to the secondary coil, and an alternating current generator/signal unit connected to the primary coil.

Claims (71)

1. A well for production of hydrocarbons, comprising:

a hole drilled down into an underground,

a casing fastened to the hole wall,

a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone,

a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and

a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well,

wherein the well further comprises:

a primary coil arranged concentrically about the production pipe,

a secondary coil arranged concentrically about the production pipe,

a load connected to the secondary coil,

an alternating current generator/signal unit connected to the primary coil, and

at least one zone further down into the well than the electrically short-circuiting packer, connected with cables fed from the secondary coil through the packer to a further primary coil arranged about the production pipe in said zone, and with a further secondary coil arranged about the production pipe in said zone, with a load connected to said further secondary coil.

2. The well according to claim 1 , wherein the packer is arranged sealingly and electrically short-circuiting in the annulus between the production pipe and casing at a level above the hydrocarbon-containing zone.

3. The well according to claim 1 , wherein the load is arranged downward of the packer, connected with electrical cables fed through the packer from the secondary coil to the load.

4. The well according to claim 1 , wherein the power signal is transmitted at about 50 Hz and 50-250 V from the generator/signal unit, while the signaling is transmitted at 20-30 kHz and about 20 V from the generator/signal unit.

5. The well according to claim 1 , wherein electrically isolating centralizers are arranged in the annulus between the production pipe and casing between the hanger and the packer, to hinder short-circuiting between said pipes.

6. The well according to claim 1 , wherein the coils have a ferromagnetic core arranged as a sleeve between the production pipe and the respective coil.

7. The well according to claim 1 , wherein the load comprises one or more of a further primary coil, an electrically driven choke (choke valve), instrumentation for measurement of pressure, temperature, multiphase, composition, flow rate, flow velocity, a pump, a motor and a seismic sensor.

8. A well for production of hydrocarbons, comprising:

a hole drilled down into an underground,

a casing fastened to the hole wall,

a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone,

a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and

a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well,

wherein the well further comprises:

a primary coil arranged concentrically about the production pipe,

a secondary coil arranged concentrically about the production pipe,

a load connected to the secondary coil,

an alternating current generator/signal unit connected to the primary coil, and

several hydrocarbon-producing zones, with load comprising instrumentation and an adjustable choke valve arranged in each zone.

9. The well according to claim 8 , wherein the packer is arranged sealingly and electrically short-circuiting in the annulus between the production pipe and casing at a level above the hydrocarbon-containing zone.

10. A well for production of hydrocarbons, comprising:

a hole drilled down into an underground,

a casing fastened to the hole wall,

a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone,

a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and

a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well,

wherein the well further comprises:

a primary coil arranged concentrically about the production pipe,

a secondary coil arranged concentrically about the production pipe,

a load connected to the secondary coil, and

an alternating current generator/signal unit connected to the primary coil, and

wherein the load comprises an inductive feed-through in the form of a divided transformer, with an outer part arranged outside the production pipe and an inner part arranged releasably inside the production pipe, with coupling from said inner part to sensors or means that are releasably arranged inside the production pipe.

11. The well according to claim 10 , wherein the packer is arranged sealingly and electrically short-circuiting in the annulus between the production pipe and casing at a level above the hydrocarbon-containing zone.

12. The well according to claim 10 , wherein the load is arranged downward of the packer, connected with electrical cables fed through the packer from the secondary coil to the load.

13. The well according to claim 10 , wherein the well comprises at least one zone further down into the well than the electrically short-circuiting packer, connected with cables fed from the secondary coil through the packer to a further primary coil arranged about the production pipe in said zone, and with a further secondary coil arranged about the production pipe in said zone, with a load connected to said further secondary coil.

14. The well according to claim 10 , wherein the power signal is transmitted at about 50 Hz and 50-250 V from the generator/signal unit, while the signaling is transmitted at 20-30 kHz and about 20 V from the generator/signal unit.

15. The well according to claim 10 , wherein electrically isolating centralizers are arranged in the annulus between the production pipe and casing between the hanger and the packer, to hinder short-circuiting between said pipes.

16. The well according to claim 10 , wherein the coils have a ferromagnetic core arranged as a sleeve between the production pipe and the respective coil.

17. The well according to claim 10 , wherein the load comprises one or more of a further primary coil, an electrically driven choke (choke valve), instrumentation for measurement of pressure, temperature, multiphase, composition, flow rate, flow velocity, a pump, a motor and a seismic sensor.

18. The well according to claim 10 , wherein the well comprises several hydrocarbon-producing zones, with load comprising instrumentation and an adjustable choke valve arranged in each zone.

19. A well for production of hydrocarbons, comprising:

a hole drilled down into an underground,

a casing fastened to the hole wall,

a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone,

a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and

a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well,

wherein the well further comprises:

a primary coil arranged concentrically about the production pipe,

a secondary coil arranged concentrically about the production pipe,

a load connected to the secondary coil, and

an alternating current generator/signal unit connected to the primary coil, and

wherein the primary coil and the secondary coil each comprise two or more coils coupled in parallel and mutually phase locked.

20. The well according to claim 19 , wherein the packer is arranged sealingly and electrically short-circuiting in the annulus between the production pipe and casing at a level above the hydrocarbon-containing zone.

21. The well according to claim 19 , wherein the load is arranged downward of the packer, connected with electrical cables fed through the packer from the secondary coil to the load.

22. The well according to claim 19 , wherein the well comprises at least one zone further down into the well than the electrically short-circuiting packer, connected with cables fed from the secondary coil through the packer to a further primary coil arranged about the production pipe in said zone, and with a further secondary coil arranged about the production pipe in said zone, with a load connected to said further secondary coil.

23. The well according to claim 19 , wherein the power signal is transmitted at about 50 Hz and 50-250 V from the generator/signal unit, while the signaling is transmitted at 20-30 kHz and about 20 V from the generator/signal unit.

24. The well according to claim 19 , wherein electrically isolating centralizers are arranged in the annulus between the production pipe and casing between the hanger and the packer, to hinder short-circuiting between said pipes.

25. The well according to claim 19 , wherein the coils have a ferromagnetic core-arranged as a sleeve between the production pipe and the respective coil.

26. The well according to claim 19 , wherein the load comprises one or more of a further primary coil, an electrically driven choke (choke valve), instrumentation for measurement of pressure, temperature, multiphase, composition, flow rate, flow velocity, a pump, a motor and a seismic sensor.

27. The well according to claim 19 , wherein the well comprises several hydrocarbon-producing zones, with load comprising instrumentation and an adjustable choke valve arranged in each zone.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 13, 2013
From: STATOIL ASA
To: STATOIL PETROLEUM AS
Reel/Frame 031627/0265 →
CHANGE OF NAME Recorded Oct 31, 2013
From: STATOILHYDRO ASA
To: STATOIL ASA
Reel/Frame 031528/0807 →
CHANGE OF NAME Recorded Oct 25, 2013
From: STATOIL ASA
To: STATOILHYDRO ASA
Reel/Frame 031495/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 26, 2008
From: SVENNING, BJOMAR; BUGTEN, BJARNE
To: STATOIL ASA
Reel/Frame 020707/0208 →