IP Library Granted Patent US 7,644,550
Granted Patent B2
US 7,644,550 · App. 12/002,207 · Granted Jan 12, 2010

Articulating raised access floor panel

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,644,550
App. No.
12/002,207
Granted
Jan 12, 2010
Kind
B2
Abstract

A precast under floor air delivery construction is provided which includes a plurality of precast concrete system having an upper base floor surface and a lower surface, a plurality of floor panel support means bearing directly to the upper base floor surface capable of an under floor air delivery between the floor panels and the upper surface, a plurality of access floor panels connected to the support means, and a fire protection barrier applied between the concrete slabs.

Claims (19)

1. An articulating raised access floor panel of the type for interchangeable fit on a pedestal support systems having pedestal support heads and pedestal support legs fixed to a base floor at varying predetermined positions, comprising:

(a) a floor panel having an upper surface, a lower plenum surface, and four side walls, two each of the sidewalls defining a corner portion of the floor panel;

(b) at least one stud having a stud end and a nut end, the stud end connected to the lower plenum surface adjacent to each of the corner portions in order for the nut end to project downwardly;

(c) a lower stringer support frame including at least four lateral beam members, each of the beam members connected to the lower plenum surface in a position substantially adjacent to a lateral edge of each of the side walls;

(d) an open support frame corner portion positioned at an intersection of each of the beam members; and

(e) a clamp frame member having an upper wall and at least two side walls, the upper wall including at least one diagonal clear slot, the slot configured to receive the nut end, in order to slidably connect an upper surface of the clamp frame upper wall to the lower plenum surface in order to guide the clamp frame along a diagonal vector in relation to the beam members so that clamp frame sidewalls align to bias against a pedestal support head.

2. The floor panel according to claim 1 , wherein the clamp frame-further comprises, an internally threaded collar connected to a lower surface of the upper wall for receiving a set screw having a foot end and a tool end, and wherein the floor panel further comprises, a diagonal clear slot cut into each of the floor panel corner portions having a centroid along the diagonal vector configured to receive a tool in order to operate the tool end in order to align the clamp frame vertically to bias against the pedestal head.

3. The floor panel according to claim 1 , wherein the clamp frame upper wall clear slot has an operational distance in a range of 6.35-38.1 mm.

4. The floor panel according to claim 1 , wherein the clamp frame side walls each further include a lower flange portion.

5. A method for retrofitting a floor panel to a pedestal support system having a plurality of pedestal support heads positioned on pedestal support legs at predetermined positions on a base floor, comprising the steps of:

(a) providing a floor panel having an upper surface, a lower plenum surface, and four side walls, two each of the sidewalls defining a corner portion of the floor panel;

(b) providing at least one stud having a stud end and a nut end, the stud end connected to the lower plenum surface adjacent to each of the corner portions in order for the nut end to project downwardly;

(c) providing a lower stringer support frame including at least four lateral beam members, each of the beam members connected to the lower plenum surface in a position substantially adjacent to a lateral edge of each of the side walls;

(d) providing an open support frame corner portion positioned at an intersection of each of the beam members;

(e) providing a clamp frame member having an upper wall and at least tow side walls, the upper wall including at least one diagonal clear slot, the slot configured to receive the nut end, in order to slidably connect an upper surface of the clamp frame upper wall to the lower plenum surface in order to guide the clamp frame along a diagonal vector in relation to the beam members;

(f) sliding the clamp frame along a diagonal vector defined with respect to the lateral beam members to a predetermined position in order to aligning the clamp frame sidewalls to bias against the pedestal support head; and

(g) tightening the nut to securely fasten the clamp frame in the predetermined position.

6. The method according to claim 5 , further comprising the steps of providing an internally threaded collar connected to a lower surface of the upper wall for receiving a set screw having a foot end and a tool end, and providing a diagonal clear slot cut into each of the floor panel corner portions, having a centroid along the diagonal vector, configured to receive a tool in order to operate the tool end, and adjusting the set screw in order to urge to floor panel vertically to a predetermined level on plane with an existing raised access floor.

7. The method according to claim 5 , further comprising the step of providing an operational distance for the clamp frame upper wall diagonal clear slot in a range of 6.35-38.1 mm.

Assignments (8)
CHANGE OF NAME Recorded Jun 11, 2025
From: RAYMOND & LAE ENGINEERING, LLC
To: PARAMETER LLC
Reel/Frame 071558/0222 →
RELEASE OF SECURITY INTEREST Recorded Dec 5, 2023
From: NXGEN LLC
To: RAYMOND & LAE ENGINEERING, INC.
Reel/Frame 065768/0435 →
CHANGE OF NAME Recorded Dec 5, 2023
From: RAYMOND & LAE ENGINEERING, INC.
To: RAYMOND & LAE ENGINEERING, LLC
Reel/Frame 065788/0091 →
SECURITY INTEREST Recorded Nov 17, 2023
From: RAYMOND & LAE ENGINEERING, LLC
To: TREE LINE CAPITAL PARTNERS, LLC
Reel/Frame 065594/0740 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE SHOULD BE CORRECTED TO ASSIGNMENT AND THE EXECUTION DATE SHOULD BE CORRECTED TO APRIL 5, 2017 PREVIOUSLY RECORDED AT REEL: 042206 FRAME: 0365. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 30, 2023
From: NXGEN LLC
To: RAYMOND & LAE ENGINEERING, INC.
Reel/Frame 066253/0865 →
SECURITY INTEREST Recorded Oct 30, 2023
From: RAYMOND & LAE ENGINEERING, INC.
To: NXGEN LLC
Reel/Frame 065396/0713 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2017
From: MEYER, GARY
To: NXGEN,LLC
Reel/Frame 042128/0774 →
SECURITY INTEREST Recorded Apr 10, 2017
From: NXGEN,LLC
To: RAYMOND & LAE ENGINEERING,INC
Reel/Frame 042206/0365 →