IP Library Granted Patent US 7,675,815
Granted Patent B2
US 7,675,815 · App. 12/017,527 · Granted Mar 9, 2010

Time reverse reservoir localization

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,675,815
App. No.
12/017,527
Granted
Mar 9, 2010
Kind
B2
Abstract

A method and system for processing synchronous array seismic data includes acquiring synchronous passive seismic data from a plurality of sensors to obtain synchronized array measurements. A reverse-time data process is applied to the synchronized array measurements to obtain a plurality of dynamic particle parameters associated with subsurface locations. These dynamic particle parameters are stored in a form for display. Maximum values of the dynamic particle parameters may be interpreted as reservoir locations. The dynamic particle parameters may be particle displacement values, particle velocity values, particle acceleration values or particle pressure values. The sensors may be three-component sensors. Zero-phase frequency filtering of different ranges of interest may be applied. The data may be resampled to facilitate efficient data processing.

Claims (11)

1. A method for processing synchronous array seismic data comprising:

a) acquiring seismic data from a plurality of sensors to obtain synchronized array measurements;

b) selecting seismic data without reference to phase information of the seismic data;

c) applying a reverse-time data process using a processing unit to the synchronized array measurements to obtain a dynamic particle parameter associated with a plurality of subsurface locations; and

d) storing only a maximum value and discarding any other value, of the dynamic particle parameter associated with each of the plurality of subsurface locations.

2. The method of claim 1 wherein the maximum value of dynamic particle parameters is stored in a form for display.

3. The method of claim 1 wherein the plurality of dynamic particle parameters are at least one selected from the group consisting of i) particle velocity values, ii) particle acceleration values and iii) particle pressure values.

4. The method of claim 1 wherein the plurality of sensors are three-component sensors.

5. The method of claim 1 further comprising applying a zero-phase frequency filter to the synchronized array measurements.

6. The method of claim 1 further comprising resampling the synchronized array measurements.

7. The method of claim 1 further comprising an extrapolator selected from a group consisting of i) finite-difference reverse time migration, ii) ray-tracing reverse time migration and iii) pseudo-spectral reverse time migration.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 27, 2019
From: BTG ECLÉPENS SA
To: SPECTRASEIS INC.
Reel/Frame 051129/0457 →
MERGER AND CHANGE OF NAME Recorded Jan 18, 2017
From: SPECTRASEIS AG; BTG ECLEPENS SA
To: BTG ECLEPENS SA
Reel/Frame 041391/0275 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 11, 2010
From: SAENGER, ERIK; STEINER, BRIAN; SCHMALHOLZ, STEFAN
To: SPECTRASEIS AG
Reel/Frame 025473/0305 →