IP Library Granted Patent US 8,383,279
Granted Patent B2
US 8,383,279 · App. 12/085,905 · Granted Feb 26, 2013

Fuel cell system and method for calculating circulation ratio in the same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,383,279
App. No.
12/085,905
Granted
Feb 26, 2013
Kind
B2
Abstract

There are disclosed a fuel cell system capable of inhibiting freezing at a joining part of a supply gas and a circulation gas during a system operation, and a method for calculating circulation ratio in the system. In the fuel cell system of the present invention, the circulation gas discharged from a fuel cell meets the supply gas from a gas supply source to be supplied to the fuel cell, and a flow rate of the circulation gas with respect to that of the supply gas is set in consideration of condensation latent heat of water vapor in the circulation gas. The flow rate of the circulation gas with respect to that of the supply gas can be set by heat balance calculation at the joining part in consideration of the condensation latent heat.

Claims (20)

1. A fuel cell system comprising:

a fuel cell;

a gas supply source of a supply gas;

a supply path for supplying the supply gas from the gas supply source to the fuel cell;

a control device that controls the fuel cell system;

a circulation path for returning a circulation gas discharged from the fuel cell to the supply path;

a joining part at which the supply gas meets the circulation gas; and

a circulation device configured to control the flow rate of the circulation gas to be fed to the joining part,

wherein the control device is programmed to set a flow rate of the circulation gas with respect to that of the supply gas in consideration of condensation latent heat of water vapor in the circulation gas, so that a temperature of a combined gas constituted by combining the supply gas and the circulation gas is higher than a predetermined temperature.

2. The fuel cell system according to claim 1 , wherein the fuel cell includes an air electrode and a fuel electrode,

the gas supply source is a gas supply source of a fuel system, and

the supply gas and the circulation gas are supplied to the fuel electrode.

3. The fuel cell system according to claim 1 , wherein the control device is further programmed to set the flow rate of the circulation gas with respect to that of the supply gas by calculation of heat balance at the joining part in consideration of the condensation latent heat.

4. The fuel cell system according to claim 1 , wherein the predetermined temperature is a water solidifying point at a pressure of the combined gas or more.

5. The fuel cell system according to claim 1 , wherein the predetermined temperature is 0° C.

6. The fuel cell system according to claim 1 , wherein the control device is further programmed to set a lower limit value of the flow rate of the circulation gas with respect to that of the supply gas in consideration of the condensation latent heat.

7. The fuel cell system according to claim 1 , wherein the circulation device varies the flow rate of the circulation gas with respect to that of the supply gas based on at least one of a temperature of the supply gas, a pressure of the circulation gas and an outside air temperature.

8. The fuel cell system according to claim 1 , wherein the fuel cell includes a gas inlet and a gas outlet,

the supply path extends from the gas supply source to the gas inlet, and

the circulation path extends from the gas outlet to the joining part.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Jul 26, 2022
From: LBC CREDIT AGENCY SERVICES, LLC, AS AGENT
To: INTERNATIONAL E-Z UP, INC.
Reel/Frame 060918/0053 →
SECURITY INTEREST Recorded Jun 3, 2019
From: INTERNATIONAL E-Z UP, INC.
To: LBC CREDIT AGENCY SERVICES, LLC, AS AGENT
Reel/Frame 049344/0017 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2008
From: NAGANUMA, YOSHIAKI
To: TOYOTA JIDOSHA KABUSHIKI KAISHA
Reel/Frame 021073/0685 →