IP Library Granted Patent US 7,983,115
Granted Patent B2
US 7,983,115 · App. 12/102,267 · Granted Jul 19, 2011

System and method for managing time in automatic control equipment

Assignee: Schneider Electric Industries SAS
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,983,115
App. No.
12/102,267
Granted
Jul 19, 2011
Kind
B2
Abstract

A time management system that includes a first clock having a first counter operating on a first timebase, a second clock having a second counter operating on a second timebase identical to the first timebase and a third counter operating on a third timebase less than the second timebase. The time management system performs a resynchronization of the second clock after the main electrical power supply has been restored, this resynchronization including, on a modification of the first counter, loading the first counter into the second counter and in zeroing the third counter.

Claims (45)

1. A time management method for automatic control equipment comprising:

counting, at a first clock having a first counter storing a first value, based on a first time base;

counting, at a second clock having a second counter storing a second value, based on a second time base identical to the first time base;

counting, at a third counter of the second clock, based on a third time base that is quicker than the second time base;

powering, at a main electrical power supply, the first and second clocks;

powering, at an auxiliary electrical power supply, the first clock in response to a main electrical power supply outage;

performing, at a central processing unit, a periodic synchronization between the first counter and the second counter by loading the second value of the second counter into the first counter when the first counter is different from the second counter; and

performing, at the central processing unit, in response to the main electrical power supply being restored, a resynchronization of the second clock, based on a modification of the first counter, by loading the first value of the first counter into the second counter and zeroing the third counter

wherein

the first clock is based only on the first time base, and

the second clock is based only on the second and third time bases.

2. The time management method according to claim 1 , wherein the resynchronization is performed in response to a detection of a next change in the first counter after the main electrical power supply is restored.

3. The time management method according to claim 1 , wherein the first clock is a hardware component of a Real Time Clock type.

4. The time management method according to claim 1 , wherein the first time base is in seconds.

5. The time management method according to claim 1 , wherein the second clock is incremented by software.

6. The time management method according to claim 1 , wherein the third time base is in milliseconds.

7. The time management method according to claim 1 , wherein the auxiliary electrical power supply is a capacitor.

8. The time management method according to claim 1 , wherein the periodic synchronization is performed on a basis of the second counter of the second clock.

9. A time management system for automatic control equipment comprising:

a first clock having a first counter configured to operate on a first time base, the first counter storing a first value;

a second clock having a second counter configured to operate on a second time base identical to the first time base and a third counter configured to operate on a third time base that is quicker than the second time base, the second counter storing a second value;

a main electrical power supply configured to power the first and second clocks;

an auxiliary electrical power supply configured to power the first clock in response to a main electrical power supply outage;

a central processing unit configured to

periodically synchronize the second counter and the first counter by loading the second value of the second counter into the first counter when the first counter is different from the second counter, and

perform a resynchronization of the second clock after an end of a main electrical power supply outage, based on a modification of first counter, by loading the first value of the first counter into the second counter and zeroing the third counter

wherein

the first clock is based only on the first time base, and

the second clock is based only on the second and third time bases.

10. The time management system according to claim 9 , wherein the first clock is a hardware component of a Real Time Clock type.

11. The time management system according to claim 9 , wherein the first time base is in seconds.

12. The time management system according to claim 9 , wherein the second clock is controlled by software.

13. The time management system according to claim 9 , wherein the third time base is in milliseconds.

14. The time management system according to claim 9 , wherein the auxiliary electrical power supply is a capacitor.

15. A time management system for automatic control equipment comprising:

first counting means for counting, at a first counter storing a first value, based on a first time base;

second counting means for counting, at a second counter storing a second value, based on a second time base identical to the first time base and for counting, at a third counter of the second counting means, based on a third time base that is quicker than the second time base;

power supply means for powering the first and second counting means;

auxiliary power supply means for powering the first counting means in response to a power supply means outage;

processing means for

periodically synchronizing the second counter and the first counter by loading the second value of the second counter into the first counter when the first counter is different from the second counter, and

performing a resynchronization of the second counting means after an end of a power supply means outage, based on a modification of first counter, by loading the first value of the first counter into the second counter and zeroing the third the third counter

wherein

the first counting means is based only on the first time base, and

the second counting means is based only on the second and third time bases.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2008
From: IANNI, GIOVANNI; PIACIBELLO, JACQUES
To: SCHNEIDER ELECTRIC INDUSTRIES SAS
Reel/Frame 021152/0906 →
Priority Claims (1)
FR 07 54652 · Apr 24, 2007 · national
Continuity (1)
Related Publication 20080267328A1 · Oct 30, 2008