IP Library Granted Patent US 9,747,575
Granted Patent B2
US 9,747,575 · App. 12/103,386 · Granted Aug 29, 2017

Flow metering of vehicles using RTLS tracking

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,747,575
App. No.
12/103,386
Granted
Aug 29, 2017
Kind
B2
Abstract

A system and method optimizes throughput of tracked assets as work-in-progress (WIP) within a monitored environment such as a manufacturing establishment with off-line processing areas. A plurality of assets such as vehicles have a tag transmitter associated therewith and operative for transmitting a wireless RF signal that includes data relating to the identification of the asset to which the tag transmitter is associated. A real-time location system (RTLS) infrastructure tracks the location of the plurality of assets to various containment, staging, and processing task areas within the monitored environment as WIP. A processor is operative with the RTLS infrastructure for determining an asset input rate into WIP at an origin to the WIP for optimizing asset flow rate as WIP through different containment, staging, and processing areas within the monitored environment.

Claims (47)

1. A system for controlling throughput of a plurality of assets in a work-in-progress (WIP) flow within a monitored environment, comprising:

a tag transmitter associated with each of the plurality of assets and configured to transmit a wireless radio frequency (RF) signal that includes data relating to the identification of the asset to which the tag transmitter is associated; and

a real time location system (RTLS) infrastructure configured to track locations of the plurality of assets through task areas of the WIP flow within the monitored environment, the RTLS infrastructure comprising:

a plurality of spaced access points positioned at known locations within the monitored environment, the access points being configured to receive the wireless RF signals from the tag transmitters, and

one or more processors configured to:

correlate the signals and successively delayed or offset versions of the signals received at the access points from the tag transmitters

determine first-to-arrive signals from the correlated signals;

locate the tag transmitters based on the first-to-arrive signals;

determine, via flow metering of the assets and based on the located tag transmitters, an asset input rate into the WIP flow at an origin of the WIP flow;

calculate a delay input for completing a task in one of the task areas; and control, based on the delay input, throughput of the assets through the task areas.

2. The system according to claim 1 , wherein the assets comprise vehicles, and the task areas within the monitored environment comprise a containment task area, a staging task area, and a processing task area through which the vehicles pass.

3. The system according to claim 1 , wherein the RTLS infrastructure is configured to process RF signals including signals compatible with ISO 24730 and WiFi.

4. The system according to claim 1 , wherein the one or more processors are configured to determine the asset input rate into the WIP flow based upon predictive metering that determines asset availability in the task areas including a staging task area and a processing task area.

5. The system according to claim 4 , wherein the one or more processors are configured to estimate an estimated time of arrival (ETA) of an asset to the processing task area and determine whether there is task area availability within the staging task area or the processing task area.

6. The system according to claim 5 , wherein the one or more processors are configured to estimate an estimated time of departure (ETD) for each asset from the staging area depending on task completion or move completion of assets.

7. The system according to claim 1 , wherein the one or more processors are configured to determine the asset input rate into the WIP flow based upon rate metering that identifies a number of assets waiting in a staging task area and a containment task area for a processing task area to determine minimum and maximum thresholds for the staging task area and the containment task area and based upon an asset overflow in the WIP flow.

8. The system according to claim 7 , wherein the one or more processors are configured to determine the delay input in response to a number of assets exceeding a threshold within the staging task area or the containment task area.

9. A system for controlling throughput of a plurality of assets in a work-in-progress (WIP) flow within a monitored environment comprising:

a tag transmitter associated with each of the plurality of assets and configured to transmit a wireless radio frequency (RF) signal that includes data relating to the identification of the asset to which the tag transmitter is associated; and

a real time location system (RTLS) infrastructure configured to track locations of the plurality of assets through task areas of the WIP flow within the monitored environment, the RTLS infrastructure comprising:

a plurality of spaced access points positioned at known locations within the monitored environment, the access points being configured to receive the wireless RF signals from the tag transmitters, and

one or more processors configured to:

correlate signals and successively delayed or offset versions of the signals received at the access points from the tag transmitters:

determine first-to-arrive signals from the correlated signals;

locate the tag transmitters based on the first-to-arrive signals;

determine, via flow metering of the assets and based on the located tag transmitters, an asset input rate into the WIP flow at an origin of the WIP flow;

calculate a delay input for completing a task in one of the task areas;

control throughput of the assets through the task areas based on the delay input and predictive metering that determines asset availability in a staging task area or a processing task area.

10. The system according to claim 9 , wherein the assets comprise vehicles, and the task areas within the monitored environment comprise a containment task area, the staging task area, and the processing task area through which the vehicles pass.

11. The system according to claim 9 , wherein the RTLS infrastructure is configured to process RF signals including signals compatible with ISO 24730 and WiFi.

12. The system according to claim 9 , wherein the one or more processors are configured to estimate an estimated time or arrival (ET A) of an asset to the processing task area and determine whether there is task area availability within the staging task area or the processing task area.

13. The system according to claim 12 , wherein the one or more processors are configured to estimate an estimated time of departure (ETD) for each asset from the staging task area depending on task completion or move completion of assets.

14. The system according to claim 12 , wherein the one or more processors are configured to calculate the delay input in response to a number of assets exceeding thresholds within the staging task area or a containment task area.

15. A method for controlling throughput of a plurality of assets in a work-in-progress (WIIP) flow within a monitored environment, each asset associated with a respective tag transmitter, the method comprising:

transmitting a wireless radio frequency (RF) signal from each tag transmitter, associated with the respective asset to be tracked within a monitored environment, to a plurality of access points such that the RF signals include data relating to the identification of the respective asset, the access points being positioned at known locations within the monitored environment;

correlating the RF signals and successively delayed or offset versions of the RF signals received at the access points;

determining a first-to-arrive signal from the correlated signals;

determining a location of each tag transmitter based on the first-to-arrive signals;

tracking the location of the plurality of assets through various task areas of the WIP flow within the monitored environment using a real time location system (RTLS) and based on the determined location of the respective tag transmitters;

determining, using one or more processors, via flow metering of the assets using the RTLS and based on the determined location of the tag transmitters, an asset input rate of the plurality of assets into the WIP flow at an origin of the WIP flow;

calculating, using the one or more processors, a delay input for completing a task in one of the task areas;

controlling, using the one or more processors and based on the delay input, an asset flow rate of the plurality of assets through the task areas of the WIP flow within the monitored environment.

16. The method according to claim 15 , further comprising tracking the assets as vehicles through the task areas within the monitored environment, the task areas including a containment task area, a staging task area, and a processing task area.

17. The method according to claim 15 , further comprising determining the asset input rate into the WIP flow based upon predictive metering that determines asset availability in the task areas including a staging task are and a processing task area.

18. The method according to claim 17 , further comprising estimating an estimated time of arrival (ETA) of an asset of the plurality of assets to the processing task area and determining whether there is task area availability within the staging task area or the processing task area and estimating an estimated time of departure (ETD) for each asset of the plurality of assets from the staging task area depending on task completion or move completion of assets.

19. The method according to claim 15 , further comprising determining the asset input rate into the WIP flow based upon rate control metering that identifies a number of assets waiting in a staging task area and a containment task area for a processing task area to determine minimum and maximum thresholds for the staging task area and the containment task area and based upon an asset overflow in the WIP flow.

20. The method according to claim 15 , wherein the determining of the delay input is performed in response to a number of assets exceeding a threshold within a staging task area or a containment task area.

Assignments (10)
RELEASE OF SECURITY INTEREST - 364 - DAY Recorded Mar 5, 2021
From: JPMORGAN CHASE BANK, N.A.
To: ZEBRA TECHNOLOGIES CORPORATION; LASER BAND, LLC; TEMPTIME CORPORATION
Reel/Frame 056036/0590 →
SECURITY INTEREST Recorded Sep 1, 2020
From: ZEBRA TECHNOLOGIES CORPORATION; LASER BAND, LLC; TEMPTIME CORPORATION
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 053841/0212 →
NOTICE OF TRANSFER OF SECURITY INTEREST IN PATENTS Recorded Jul 3, 2019
From: ZEBRA TECHNOLOGIES CORPORATION
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 049675/0049 →
MERGER Recorded Mar 29, 2019
From: ZIH CORP.
To: ZEBRA TECHNOLOGIES CORPORATION
Reel/Frame 048884/0618 →
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Oct 25, 2017
From: MORGAN STANLEY SENIOR FUNDING, INC., AS THE EXISTING AGENT
To: JPMORGAN CHASE BANK, N.A., AS THE SUCCESSOR AGENT
Reel/Frame 044791/0842 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 4, 2015
From: ZEBRA ENTERPRISE SOLUTIONS CORP.
To: ZIH CORP.
Reel/Frame 036552/0588 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 28, 2015
From: ZEBRA ENTERPRISE SOLUTIONS CORP.
To: ZIH CORP.
Reel/Frame 036503/0630 →
SECURITY AGREEMENT Recorded Oct 31, 2014
From: ZIH CORP.; LASER BAND, LLC; ZEBRA ENTERPRISE SOLUTIONS CORP.; SYMBOL TECHNOLOGIES, INC.
To: MORGAN STANLEY SENIOR FUNDING, INC. AS THE COLLATERAL AGENT
Reel/Frame 034114/0270 →
CHANGE OF NAME Recorded Oct 29, 2010
From: WHERENET CORP.
To: ZEBRA ENTERPRISE SOLUTIONS CORP.
Reel/Frame 025217/0323 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 12, 2008
From: JAIN, SANDEEP; ONORATI, NADIA; PHILLIPS, DAVID
To: WHERENET CORP.
Reel/Frame 020974/0990 →