IP Library Granted Patent US 8,577,712
Granted Patent B2
US 8,577,712 · App. 12/114,550 · Granted Nov 5, 2013

Assessing risk

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,577,712
App. No.
12/114,550
Granted
Nov 5, 2013
Kind
B2
Abstract

Systems, methods, and apparatus, including software tangibly stored on a computer readable medium, involve a future deadline for completion of a project milestone. An estimate of an amount of time slippage associated with the future deadline is received. A probability of missing the future deadline is calculated based on the estimated amount of time slippage and an amount of time remaining until the future deadline.

Claims (36)

1. A method for assessing risk, the method comprising:

identifying a future deadline for completion of at least one project milestone;

receiving an estimate of an amount of time slippage associated with the future deadline;

calculating, with a computer, a probability of missing the future deadline, wherein the probability of missing the future deadline is calculated by dividing the estimated amount of time slippage by a sum of a time remaining until the future deadline and the estimated amount of time slippage;

calculating, by the computer, a percent of milestone slippage by dividing the time slippage associated with the project milestone by a sum of a milestone elapsed time and the time remaining until the future deadline of the milestone;

presenting, by the computer, on a user interface a coordinate system comprising a first dimension representing a range of probabilities of missing the future deadline and a second dimension representing a range of percent of milestone slippage;

plotting, by the computer, a data point representing each project milestone in the coordinate system where a value in the first dimension is the calculated probability of missing the future deadline and a value in the second dimension is the calculated percent of milestone slippage;

defining a first region, a second region, and a third region in the coordinate system; and

determining, by the computer, a risk level for each project milestone based on the location of each data point being in either the first region, the second region, or the third region in the graph.

2. The method of claim 1 , wherein the milestone elapsed time is a time between a predecessor milestone and a risk entry date.

3. The method of claim 1 , further comprising identifying a project timeline, wherein the future deadline comprises one of a plurality of future deadlines for the project timeline.

4. The method of claim 1 , wherein the future deadline comprises a future date.

5. The method of claim 4 , wherein the amount of time remaining until the future deadline is the number of days between a current date and the future date.

6. A computer program product, tangibly stored on a non-transitory computer-readable medium, comprising instructions operable to cause a programmable processor to:

retrieve stored data identifying a future deadline for completion of at least one project milestone;

receive an estimate of an amount of time slippage associated with the at least one project milestone;

calculate a probability of missing the future deadline, wherein the probability of missing the future deadline is calculated by dividing the estimated amount of time slippage by a sum of a time remaining until the future deadline and the estimated amount of time slippage;

calculate a percent of milestone slippage by dividing the time slippage associated with the project milestone by a sum of a milestone elapsed time and the time remaining until the future deadline of the milestone;

present on a user interface a coordinate system comprising a first dimension representing a range of probabilities of missing the future deadline and a second dimension representing a range of percent of milestone slippage;

plot a data point representing each project milestone in the coordinate system where a value in the first dimension is the calculated probability of missing the future deadline and a value in the second dimension is the calculated percent of milestone slippage;

define a first region, a second region, and a third region in the coordinate system; and

determine a risk level for each project milestone based on the location of each data point being in either the first region, the second region, or the third region in the graph.

7. The computer program product of claim 6 , wherein the data point comprises a color coded representation determined according to a risk level associated with the project milestone.

8. The computer program product of claim 6 , further comprising instructions operable to cause the programmable processor to:

calculate a risk of encountering a cost associated with missing the future deadline by multiplying a cost associated with missing the future deadline by the probability of missing the future deadline; and

compare the risk of encountering the cost associated with missing the future deadline to one or more thresholds.

9. The computer program product of claim 8 , further comprising instructions operable to cause the programmable processor to issue a notification based on the comparison of the risk of encountering the cost and the one or more thresholds.

10. A data processing apparatus including a processor and a non-transitory machine-readable medium storing thereon machine executable instructions for causing the processor of the data processing apparatus to perform operations comprising:

identifying a future deadline for completion of at least one project milestone;

receiving an estimate of an amount of time slippage associated with the project milestone;

calculating a probability of missing the future deadline, wherein the probability of missing the future deadline is calculated by dividing the estimated amount of time slippage by a sum of a time remaining until the future deadline and the estimated amount of time slippage;

calculating a percent of milestone slippage by dividing the time slippage associated with the project milestone by a sum of a milestone elapsed time and the time remaining until the future deadline of the milestone;

presenting on a user interface a coordinate system comprising a first dimension representing a range of probabilities of missing the future deadline and a second dimension representing a range of percent of milestone slippage;

plotting a data point representing each project milestone in the coordinate system where a value in the first dimension is the calculated probability of missing the future deadline and a value in the second dimension is the calculated percent of milestone slippage;

defining a first region, a second region, and a third region in the coordinate system; and

determining a risk level for each project milestone based on the location of each data point being in either the first region, the second region, or the third region in the graph.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 13, 2017
From: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
To: ENT. SERVICES DEVELOPMENT CORPORATION LP
Reel/Frame 041041/0716 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2009
From: ELECTRONIC DATA SYSTEMS, LLC
To: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Reel/Frame 022449/0267 →
CHANGE OF NAME Recorded Mar 24, 2009
From: ELECTRONIC DATA SYSTEMS CORPORATION
To: ELECTRONIC DATA SYSTEMS, LLC
Reel/Frame 022460/0948 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2008
From: DOUGLAS, WILLIAM J.; NESS, AMANDA
To: ELECTRONIC DATA SYSTEMS CORPORATION
Reel/Frame 021142/0957 →