US 8,219,437 · App. 12/170,577 · Granted Jul 10, 2012

Methods and systems for constructing production plans

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,219,437
App. No.
12/170,577
Granted
Jul 10, 2012
Kind
B2
Abstract

Systems and methods are presented for constructing production plans to achieve one or more production goals, in which a diagnosis engine determines the production plant condition based on a previously executed plan, observations from the plant, and a plant model, and formulates a heuristic based on a diagnostic objective, and with a planner to performing a partial-plan search using the heuristic to construct the plans that will concurrently achieve at least one production goal and facilitate the diagnostic objective.

Claims (46)

1. A system for constructing plans for operating a production plant to achieve one or more production goals, the system comprising:

at least one processor;

a diagnosis engine implemented using the at least one processor and operative to:

determine a current plant condition based at least partially on a previously executed plan, at least one corresponding observation from the plant, and a plant model of the plant,

formulate a heuristic based on at least one diagnostic objective related to identifying resources of the plant causing intermittent or persistent faults, and to

update a belief model representing the current state of the plant based at least partially on the previously executed plan, the at least one corresponding observation from the plant, and the plant model; and

a planner implemented using the at least one processor and operatively coupled with the diagnosis engine to perform a partial-plan search using the heuristic to construct a plan for execution in the plant that will concurrently achieve at least one production goal and facilitate the at least one diagnostic objective;

wherein the diagnosis engine is operative to calculate plan failure probabilities based on action failure probabilities and the current plant condition, to formulate the heuristic based at least partially on the plan failure probabilities, and to provide information gain criterion to the planner for one or more possible plans based at least partially on the current plant condition and the plant model; and

wherein the planner uses the information gain criterion to construct the plan.

2. The system of claim 1 , wherein the diagnosis engine is operative to derive failure probabilities for a plurality of fault hypothesis in the plant in formulating the heuristic based at least partially on the current plant condition.

3. The system of claim 2 , wherein the diagnosis engine is operative to formulate the heuristic as a lower and upper plan failure probability bounding heuristic based at least partially on the current plant condition.

4. The system of claim 3 , wherein the planner is operative to perform search space pruning to speed up the partial-plan search in constructing the plans.

5. The system of claim 3 , wherein the planner is operative to evaluate partial plans according to the heuristic to preferentially construct informative plans based on the at least one diagnostic objective.

6. The system of claim 3 , wherein the planner is operative to selectively construct plans with a plan failure probability closest to a target value T.

7. The system of claim 1 , wherein the diagnosis engine is operative to formulate the heuristic as a lower and upper plan failure probability bounding heuristic based at least partially on the current plant condition.

8. The system of claim 7 , wherein the planner is operative to perform search space pruning to speed up the partial-plan search in constructing the plans.

9. The system of claim 7 , wherein the planner is operative to evaluate partial plans according to the heuristic to preferentially construct informative plans based on the at least one diagnostic objective.

10. The system of claim 7 , wherein the planner is operative to selectively construct plans with a plan failure probability closest to a target value T.

11. The system of claim 1 , wherein the planner is operative to evaluate partial plans according to the heuristic to preferentially construct informative plans based on the at least one diagnostic objective.

12. The system of claim 1 , wherein the planner performs an A* partial-plan search using the heuristic to construct the plans.

13. A method of constructing plans for operating a production plant to achieve one or more production goals, the method comprising:

using at least one processor, determining a current plant condition based at least partially on a previously executed plan, at least one corresponding observation from the plant, and a plant model of the plant;

using the at least one processor, formulating a heuristic based on at least one diagnostic objective related to identifying resources of the plant causing intermittent or persistent faults;

using the at least one processor, updating a belief model representing the current state of the plant based at least partially on the previously executed plan, the at least one corresponding observation from the plant, and the plant model;

using the at least one processor, performing a partial-plan search using the heuristic;

using the at least one processor, constructing a plan for execution in the plant that will concurrently achieve at least one production goal and facilitate the at least one diagnostic objective based on the partial-plan search;

using the at least one processor, calculating plan failure probabilities based on action failure probabilities and the current plant condition;

using the at least one processor, generating information gain criterion for one or more possible plans based at least partially on the current plant condition and the plant model;

wherein the at least one processor formulates the heuristic based at least partially on the plan failure probabilities; and

wherein the at least one processor constructs the plan using the information gain criterion.

14. The method of claim 13 , wherein formulating the heuristic comprises deriving failure probabilities for a plurality of fault hypothesis in the plant based at least partially on the current plant condition.

15. The method of claim 13 , wherein the heuristic is formulated as a lower and upper plan failure probability bounding heuristic.

16. The method of claim 13 , further comprising performing search space pruning to speed up the partial-plan search in constructing the plans.

17. The method of claim 13 , wherein performing the partial-plan search comprises evaluating partial plans according to the heuristic to preferentially construct informative plans based on the at least one diagnostic objective.

18. A non-transitory computer readable medium having computer executable instructions for performing the steps of:

determining a current plant condition based at least partially on a previously executed plan, at least one corresponding observation from the plant, and a plant model of the plant;

formulating a heuristic based on at least one diagnostic objective related to identifying resources of the plant causing intermittent or persistent faults;

performing a partial-plan search using the heuristic;

updating a belief model representing the current state of the plant based at least partially on the previously executed plan, the at least one corresponding observation from the plant, and the plant model;

constructing a plan for execution in the plant that will concurrently achieve at least one production goal and facilitate the at least one diagnostic objective based on the partial-plan search;

calculating plan failure probabilities based on action failure probabilities and the current plant condition; and

generating information gain criterion for one or more possible plans based at least partially on the current plant condition and the plant model;

wherein the heuristic is formulated based at least partially on the plan failure probabilities; and

wherein the plan is constructed using the information gain criterion.

19. The system of claim 1 , wherein the diagnosis engine performs the partial-plan search using the at least one diagnostic objective and a current state of a partial plan.

20. The system of claim 1 , wherein the diagnosis engine formulates the heuristic at least partially based on the current plant condition.

Assignments (11)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2025
From: XEROX CORPORATION
To: GENESEE VALLEY INNOVATIONS, LLC
Reel/Frame 073842/0479 →
SECOND LIEN NOTES PATENT SECURITY AGREEMENT Recorded Jul 2, 2025
From: XEROX CORPORATION
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 071785/0550 →
FIRST LIEN NOTES PATENT SECURITY AGREEMENT Recorded Apr 11, 2025
From: XEROX CORPORATION
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 070824/0001 →
SECURITY INTEREST Recorded Feb 13, 2024
From: XEROX CORPORATION
To: CITIBANK, N.A., AS COLLATERAL AGENT
Reel/Frame 066741/0001 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS RECORDED AT RF 064760/0389 Recorded Feb 13, 2024
From: CITIBANK, N.A., AS COLLATERAL AGENT
To: XEROX CORPORATION
Reel/Frame 068261/0001 →
SECURITY INTEREST Recorded Nov 20, 2023
From: XEROX CORPORATION
To: JEFFERIES FINANCE LLC, AS COLLATERAL AGENT
Reel/Frame 065628/0019 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVAL OF US PATENTS 9356603, 10026651, 10626048 AND INCLUSION OF US PATENT 7167871 PREVIOUSLY RECORDED ON REEL 064038 FRAME 0001. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 28, 2023
From: PALO ALTO RESEARCH CENTER INCORPORATED
To: XEROX CORPORATION
Reel/Frame 064161/0001 →
SECURITY INTEREST Recorded Jun 22, 2023
From: XEROX CORPORATION
To: CITIBANK, N.A., AS COLLATERAL AGENT
Reel/Frame 064760/0389 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 20, 2023
From: PALO ALTO RESEARCH CENTER INCORPORATED
To: XEROX CORPORATION
Reel/Frame 064038/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED ON REEL 021335 FRAME 0704. ASSIGNOR(S) HEREBY CONFIRMS THE CORRECT ASSIGNEE NAME IS PALO ALTO RESEARCH CENTER INCORPORATED. Recorded Aug 26, 2008
From: KUHN, LUKAS DANIEL; PRICE, ROBERT; DE KLEER, JOHAN; DO, MINH BINH; ZHOU, RONG
To: PALO ALTO RESEARCH CENTER INCORPORATED
Reel/Frame 021444/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 4, 2008
From: KUHN, LUKAS DANIEL; PRICE, ROBERT; DE KLEER, JOHAN; DO, MINH BINH; ZHOU, RONG
To: XEROX CORPORATION
Reel/Frame 021335/0704 →