IP Library Granted Patent US 7,862,789
Granted Patent B2
US 7,862,789 · App. 12/196,631 · Granted Jan 4, 2011

Circulating fluidized bed power plant having integrated sulfur dioxide scrubber system with lime feed

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,862,789
App. No.
12/196,631
Granted
Jan 4, 2011
Kind
B2
Abstract

A circulating fluidized bed power plant 100 includes; a circulating fluidized bed boiler 110 which generates flue gases, a flash dry absorber scrubber 140 configured to receive the flue gases from the circulating fluidized bed boiler 110 , and a lime feed 150 configured to introduce lime into the flash dry absorber scrubber 140.

Claims (28)

1. A circulating fluidized bed power plant comprising:

a circulating fluidized bed boiler which generates flue gases;

a flash dry absorber scrubber configured to receive the flue gases from the circulating fluidized bed boiler; and

a lime feed configured to introduce lime into the flash dry absorber scrubber.

2. The circulating fluidized bed power plant of claim 1 , further comprising:

a limestone feed configured to introduce limestone to the circulating fluidized bed boiler.

3. The circulating fluidized bed power plant of claim 2 , wherein the lime is introduced into the flash dry absorber scrubber at a feed rate to optimize cost use of limestone and lime.

4. The circulating fluidized bed power plant of claim 1 , wherein the flash dry absorber scrubber comprises:

a reactor configured to pass the flue gases therethrough;

a particulate removal mechanism coupled to the reactor and configured to remove particulate from the flue gases; and

a mixer configured to receive and hydrate particulate from the particulate removal mechanism and also configured to introduce hydrated particulate into the reactor.

5. The circulating fluidized bed power plant of claim 4 , wherein the lime feed is configured to introduce lime into the flash dry absorber scrubber upstream of the introduction of the hydrated particulate.

6. The circulating fluidized bed power plant of claim 4 , wherein the particulate removal mechanism includes a fabric filter.

7. The circulating fluidized bed power plant of claim 4 , wherein the particulate removal mechanism includes an electrostatic precipitator.

8. The circulating fluidized bed power plant of claim 4 , further comprising a flash dry absorber scrubber inlet duct disposed between the circulating fluidized bed boiler and the reactor.

9. The circulating fluidized bed power plant of claim 8 , wherein the lime feed is configured to introduce lime upstream of the flash dry absorber scrubber inlet duct.

10. The circulating fluidized bed power plant of claim 4 , further comprising a particulate removal mechanism inlet duct disposed between the reactor and the particulate removal mechanism.

11. The circulating fluidized bed power plant of claim 10 , wherein the reactor is disposed between the flash dry absorber scrubber inlet duct and the particulate removal mechanism inlet duct.

12. The circulating fluidized bed power plant of claim 4 , wherein the reactor is a column reactor.

13. The circulating fluidized bed power plant of claim 1 , wherein the lime feed comprises:

a day silo configured to hold the lime; and

a pneumatic feed receiving lime from the day silo and configured to introduce the lime into the flash dry absorber scrubber.

14. A method for reducing sulfur dioxide emission from a circulating fluidized bed power plant, the method comprising:

providing a flash dry absorber scrubber in a backpass of the circulating fluidized bed power plant; and

introducing a quantity of lime into the flash dry absorber scrubber.

15. The method of claim 14 , further comprising introducing a quantity of limestone into a circulating fluidized bed boiler of the power plant.

16. The method of claim 14 , further comprising adjusting the quantity of lime introduced into the backpass of the circulating fluidized bed power plant and the quantity of limestone introduced into the circulating fluidized bed boiler of the circulating fluidized bed power plant to optimize a total cost of both the lime and the limestone.

17. The method of claim 14 , wherein the introducing a quantity of lime into the flash dry absorber scrubber comprises introducing a quantity of lime into the backpass of the circulating fluidized bed power plant upstream of the flash dry absorber scrubber.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2022
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ANDRITZ AKTIEBOLAG
Reel/Frame 060358/0218 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ADDRESS OF THE ASSIGNEE, ALSTOM TECHNOLOGY LTD PREVIOUSLY RECORDED ON REEL 021778 FRAME 0510. ASSIGNOR(S) HEREBY CONFIRMS THE ADDRESS OF THE ASSIGNEE SHOULD READ: ALSTOM TECHNOLOGY LTD, BROWN BOVERI STRASSE 7, 5400 BADEN, SWITZERLAND. Recorded Nov 19, 2008
From: GATTON, LAWRENCE H., JR.; MYLCHREEST, GEORGE D.
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 021855/0919 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 3, 2008
From: GATTON, LAWRENCE H., JR.; MYLCHREEST, GEORGE D.
To: ALSTOM TECHNOLOGY LTD.
Reel/Frame 021778/0510 →