IP Library Granted Patent US 7,905,299
Granted Patent B2
US 7,905,299 · App. 12/233,363 · Granted Mar 15, 2011

Articulation assembly for moving a drill mast

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,905,299
App. No.
12/233,363
Granted
Mar 15, 2011
Kind
B2
Abstract

A jib assembly for use with a drill rig includes a jib boom having a first end and a second end. The jib boom is to rotate about the first end and the second end is configured to be coupled to a mast assembly mount. The jib assembly also includes an articulation assembly having at least one variable length link having a first end and a second end. The first end of the variable length link is offset from the jib boom and the second end is configured to be pivotingly coupled to the mast assembly mount.

Claims (48)

1. A jib assembly for use with a drill rig, comprising:

a jib boom having a first end and a second end, said jib boom being configured to rotate about said first end of said jib boom, and wherein said second end of said jib boom is configured to be coupled to a mast assembly mount; and

an articulation assembly having at least one variable length link, said at least one variable length link having a first end and a second end, said first end of said articulation assembly being offset from said jib boom, and wherein said second end of said articulation assembly is configured to be pivotingly coupled to the mast assembly mount;

wherein said articulation assembly includes an upper link, a lower link, and a pivoting link coupling said upper link and said lower link, wherein said pivoting link is further pivotingly coupled to said jib boom, and wherein said lower link and said upper link are parallel relative to each other, and wherein at least one of said upper link and said lower link includes said at least one variable length link.

2. The jib assembly of claim 1 , wherein said at least one variable length link is parallel to said jib boom.

3. The jib assembly of claim 1 , wherein said lower link and said upper link are adapted to remain parallel relative to each other during the raising and lower of said mast assembly mount.

4. The jib assembly of claim 3 , wherein said upper link includes said at least one variable length link.

5. The jib assembly of claim 4 , wherein said upper link and said lower link are parallel to said jib boom.

6. The jib assembly of claim 5 , wherein said upper link and said lower link are located on opposing sides of said jib boom.

7. The jib assembly of claim 5 , wherein said mast assembly mount includes a first arm and a second arm offset from said first arm, said jib boom being configured to be coupled to said first arm and said upper link being configured to be coupled to said second arm.

8. The jib assembly of claim 1 , wherein said at least one variable length link includes a hydraulic cylinder.

9. A jib assembly, comprising:

a jib boom having a first end and a second end, said first end being configured to be coupled to a jib mount, and said second end being configured to be coupled to a mast assembly mount;

an articulation assembly having at least one variable length link, said at least one variable length link being maintained parallel to a line between said first end and said second end of said jib boom, wherein said at least one variable length link is located on a first side of said jib boom; and

a pivoting link coupling said at least one variable length link to said jib boom.

10. The jib assembly of claim 9 , further comprising a mast slewing assembly adapted to pivot relative to said jib boom.

11. The jib assembly of claim 9 , further comprising an additional link having a first end and a second end, wherein said first end of said additional link is configured to be coupled to said jib mount, and wherein said second end of said additional link is coupled to said pivoting link.

12. The jib assembly of claim 11 , wherein said additional link is located on an opposing side of said jib boom from said at least one variable length link.

13. The jib assembly of claim 12 , wherein said pivoting link is pivotingly coupled to said jib boom.

14. The jib assembly of claim 9 , further comprising a jib lifter operatively associated with said jib boom, said jib lifter being configured to rotate said jib boom about said first end of said jib boom.

15. An assembly for positioning a drill mast, comprising:

a mast assembly mount;

a jib boom having a first end and a second end, said first end of said jib boom being coupled to a jib mount, and said second end of said jib boom being coupled to said mast assembly mount;

a jib lifter configured to rotate said jib boom about said first end of said jib boom;

a jib articulation assembly having a variable length link, said variable length link having a first end and a second end, said first end of said variable length link being offset from said jib boom, and said second end of said variable length link being coupled to said mast assembly mount such that said variable length link is parallel to a line between said first end of said jib boom and said second end of said jib boom as said jib lifter rotates said jib boom about said first end of said jib boom;

a pivoting link coupled to said first end of said variable length link; and

an additional link coupled to a second end of said pivoting link.

16. The assembly of claim 15 , further comprising a pivoting link coupled to said first end of said variable length link and a link coupled to a second end of said pivoting link.

17. The assembly of claim 16 , wherein said pivoting link is further pivotingly coupled to said jib boom and said link is coupled to said jib mount.

18. The assembly of claim 17 , wherein said link and said variable length link are positioned on opposing sides of said jib boom.

19. The assembly of claim 18 , wherein said link is parallel to said variable length link.

20. The assembly of claim 18 , further comprising a jib slewing assembly coupled to said jib boom.

21. The assembly of claim 15 , further comprising a mast carrier coupled to said mast assembly mount.

22. The assembly of claim 21 , further comprising a mast slewing assembly coupled to said mast carrier and to said mast assembly mount, said mast slewing assembly being configured to rotate said mast carrier relative to said mast assembly mount.

23. A drilling system, comprising:

a rig;

a jib assembly coupled to the rig, the jib assembly including:

a mast assembly mount,

a jib boom having a first end and a second end, said first end of said jib boom being coupled to said rig, and said second end of said jib boom being coupled to said mast assembly mount,

a jib lifter configured to rotate said jib boom about said first end of said jib boom, and

a jib articulation assembly having a variable length link having a first end and a second end, said first end of said variable length link being offset from said jib boom, and said second end of said variable length link being coupled to said mast assembly mount such that said variable length link is parallel to a line between said first end of said jib boom and said second end of said jib boom as said jib lifter rotates said jib boom about said first end of said jib boom,

a pivoting link coupled to said first end of said variable length link, and

an additional link coupled to a second end of said pivoting link;

a mast coupled to said mast assembly mount; and

a drill head coupled to said mast.

24. The system of claim 23 , wherein said jib assembly is removably coupled to said rig.

25. The system of claim 23 , further comprising a mast carrier coupled to said mast assembly mount, said mast carrier being configured to rotate said mast relative to said mast assembly mount.

26. The system of claim 25 , further comprising a mast slewing assembly coupled to said mast assembly mount and said mast carrier, said mast slewing assembly being configured to rotate said mast carrier relative to said mast assembly mount.

Assignments (11)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2025
From: BOART LONGYEAR COMPANY
To: BOART LONGYEAR MANUFACTURING AND DISTRIBUTION INC.
Reel/Frame 070480/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 29, 2023
From: LONGYEAR TM, INC.
To: BOART LONGYEAR COMPANY
Reel/Frame 065708/0633 →
RELEASE OF SECURITY INTEREST Recorded Sep 30, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: LONGYEAR TM, INC.
Reel/Frame 057675/0405 →
RELEASE OF SECURITY INTEREST Recorded Sep 30, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: LONGYEAR TM, INC.
Reel/Frame 057675/0461 →
RELEASE OF SECURITY INTEREST Recorded Sep 30, 2021
From: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: LONGYEAR TM, INC.
Reel/Frame 057878/0718 →
RELEASE OF SECURITY INTEREST RECORDED AT REEL/FRAME 030775/0609 Recorded Oct 29, 2014
From: BANK OF AMERICA, N.A.
To: LONGYEAR TM, INC.
Reel/Frame 034084/0436 →
SECURITY INTEREST (TERM LOAN A) Recorded Oct 29, 2014
From: LONGYEAR TM, INC.
To: WILMINGTON TRUST, N.A.
Reel/Frame 034085/0704 →
SECURITY INTEREST (TERM LOAN B) Recorded Oct 29, 2014
From: LONGYEAR TM, INC.
To: WILMINGTON TRUST, N.A.
Reel/Frame 034085/0775 →
SECURITY AGREEMENT Recorded Sep 27, 2013
From: LONGYEAR TM, INC.
To: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 031306/0193 →
NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS Recorded Jul 11, 2013
From: LONGYEAR TM, INC.
To: BANK OF AMERICA, N.A., AS AGENT
Reel/Frame 030775/0609 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2008
From: WREDE, STEFAN; KRUSE, CHRISTOF
To: LONGYEAR TM, INC
Reel/Frame 021552/0857 →