IP Library Granted Patent US 8,072,715
Granted Patent B2
US 8,072,715 · App. 12/245,180 · Granted Dec 6, 2011

Method, apparatus and computer program product for fault protection

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,072,715
App. No.
12/245,180
Granted
Dec 6, 2011
Kind
B2
Abstract

An apparatus is provided for fault protection. The apparatus may include one or more electronic components configured to receive a single phase-to-ground fault signal and a double phase-to-ground fault signal subsequent to receiving the single phase-to-ground fault signal. The one or more of electronic components may be further configured to provide for a delay while the single phase-to-ground fault signal indicates that a single phase-to-ground fault is present on the ungrounded power system and the double phase-to-ground fault signal indicates that the double phase-to-ground fault is present on the ungrounded power system. The delay may allow for an opportunity to isolate a phase-to-ground fault on a first phase from a phase-to-ground fault on a second phase. Associated methods and computer program products are also provided.

Claims (50)

1. A method comprising:

receiving a single phase-to-ground fault signal, the single phase-to-ground fault signal indicating that a first phase-to-ground fault is present on a first phase of an ungrounded power system;

receiving a double phase-to-ground fault signal subsequent to receiving the single phase-to-ground fault signal, the double phase-to-ground fault signal indicating that a double phase-to-ground fault is present on the ungrounded power system due to the first phase-to-ground fault on the first phase and a second phase-to-ground fault on a second phase; and

providing for a delay of a predetermined duration while the single phase-to-ground fault signal indicates that the single phase-to-ground fault is present on the ungrounded power system and the double phase-to-ground fault signal indicates that the double phase-to-ground fault is present on the ungrounded power system, thereby allowing for an opportunity to isolate the phase-to-ground fault on the first phase from the phase-to-ground fault on the second phase prior to expiration of the delay.

2. The method of claim 1 , wherein receiving the single phase-to-ground fault signal includes:

receiving a local ground fault signal, the local ground fault signal indicating whether a local single phase-to-ground fault is present in a local zone of the ungrounded power system;

receiving a remote ground fault signal, the remote ground fault signal indicating whether a remote single phase-to-ground fault is present in a remote zone of the ungrounded power system; and

combining a representation of the local ground fault signal and a representation of the remote ground fault signal using a logical-or function to generate the single phase-to-ground fault signal.

3. The method of claim 2 further comprising:

receiving an isolation signal before the delay expires; and

providing for transmission of the trip signal in response to receiving the isolation signal.

4. The method of claim 2 , wherein receiving the remote ground fault signal includes setting a remote ground fault flag, the remote ground fault flag being the representation of the remote ground fault signal.

5. The method of claim 2 further comprising providing for transmission of a local ground fault notification upon receiving the local ground fault signal indicating that the single phase-to-ground fault is present in the local zone of the ungrounded power system, transmission of the local ground fault notification causing the transmission of remote ground fault signals.

6. The method of claim 1 further comprising:

receiving an isolation signal before the delay expires; and

providing for transmission of the trip signal in response to receiving the isolation signal.

7. The method of claim 6 , wherein receiving the isolation signal includes receiving the isolation signal from a Supervisory Control And Data Acquisition (SCADA) system.

8. An apparatus comprising one or more electronic components, the one or more electronic components configured to:

receive a single phase-to-ground fault signal, the single phase-to-ground fault signal indicating that a first phase-to-ground fault is present on a first phase of an ungrounded power system;

receive a double phase-to-ground fault signal subsequent to receiving the single phase-to-ground fault signal, the double phase-to-ground fault signal indicating that a double phase-to-ground fault is present on the ungrounded power system due to the first phase-to-ground fault on the first phase and a second phase-to-ground fault on a second phase; and

provide for a delay of a predetermined duration while the single phase-to-ground fault signal indicates that the single phase-to-ground fault is present on the ungrounded power system and the double phase-to-ground fault signal indicates that the double phase-to-ground fault is present on the ungrounded power system, thereby allowing for an opportunity to isolate the phase-to-ground fault on the first phase from the phase-to-ground fault on the second phase prior to expiration of the delay.

9. The apparatus of claim 8 , wherein the one or more electronic components being configured to receive the single phase-to-ground fault signal include being configured to:

receive a local ground fault signal, the local ground fault signal indicating whether a local single phase-to-ground fault is present in a local zone of the ungrounded power system;

receive a remote ground fault signal, the remote ground fault signal indicating whether a remote single phase-to-ground fault is present in a remote zone of the ungrounded power system; and

combine a representation of the local ground fault signal and a representation of the remote ground fault signal using a logical-or function to generate the single phase-to-ground fault signal.

10. The apparatus of claim 9 , wherein the one or more electronic components are further configured to:

receive an isolation signal before the delay expires; and

provide for transmission of the trip signal.

11. The apparatus of claim 9 , wherein the one or more electronic components configured to receive the remote ground fault signal include being configured to set a remote ground fault flag, the remote ground fault flag being the representation of the remote ground fault signal.

12. The apparatus of claim 9 , wherein the one or more electronic components are further configured to provide for transmission of a local ground fault notification upon receiving the local ground fault signal indicating that the single phase-to-ground fault is present in the local zone of the ungrounded power system, transmission of the local ground fault notification causing the transmission of remote ground fault signals.

13. The apparatus of claim 8 , wherein the one or more electronic components are further configured to:

receive an isolation signal before the delay expires; and

provide for transmission of the trip signal in response to receiving the isolation signal.

14. The apparatus of claim 13 , wherein the one or more electronic components configured to receive the isolation signal include being configured to receive the isolation signal from a Supervisory Control And Data Acquisition (SCADA) system.

15. A computer program product comprising at least one non-transitory computer-readable storage medium having executable computer-readable program code portions stored therein, the computer-readable program code portions comprising:

a first program code portion configured to receive a single phase-to-ground fault signal, the single phase-to-ground fault signal indicating that a first phase-to-ground fault is present on a first phase of an ungrounded power system;

a second program code portion configured to receive a double phase-to-ground fault signal subsequent to receiving the single phase-to-ground fault signal, the double phase-to-ground fault signal indicating that a double phase-to-ground fault is present on the ungrounded power system due to the first phase-to-ground fault on the first phase and a second phase-to-ground fault on a second phase; and

a third program code portion configured to provide for a delay of a predetermined duration while the single phase-to-ground fault signal indicates that the single phase-to-ground fault is present on the ungrounded power system and the double phase-to-ground fault signal indicates that the double phase-to-ground fault is present on the ungrounded power system, thereby allowing for an opportunity to isolate the phase-to-ground fault on the first phase from the phase-to-ground fault on the second phase prior to expiration of the delay.

16. The computer program product of claim 15 , wherein the first program code portion configured to receive the single phase-to-ground fault signal includes being configured to:

receive a local ground fault signal, the local ground fault signal indicating whether a local single phase-to-ground fault is present in a local zone of the ungrounded power system;

receive a remote ground fault signal, the remote ground fault signal indicating whether a remote single phase-to-ground fault is present in a remote zone of the ungrounded power system; and

combine a representation of the local ground fault signal and a representation of the remote ground fault signal using a logical-or function to generate the single phase-to-ground fault signal.

17. The computer program product of claim 16 , wherein the computer-readable program code portions further comprise:

a fourth program code portion configured to receive an isolation signal before the delay expires; and

a fifth program code portion configured to provide for transmission of the trip signal in response to receiving the isolation signal.

18. The computer program product of claim 16 , wherein the first program code portion configured to receive the remote ground fault signal includes being configured to set a remote ground fault flag, the remote ground fault flag being the representation of the remote ground fault signal.

19. The computer program product of claim 16 , wherein the computer-readable program code portions further comprise a fourth program code portion configured to provide for transmission of a local ground fault notification upon receiving the local ground fault signal indicating that the single phase-to-ground fault is present in the local zone of the ungrounded power system, transmission of the local ground fault notification causing the transmission of remote ground fault signals.

20. The computer program product of claim 15 , wherein the computer-readable program code portions further comprise:

a fourth program code portion configured to receive an isolation signal before the delay expires; and

a fifth program code portion configured to provide for transmission of the trip signal in response to receiving the isolation signal.

Assignments (5)
RELEASE OF SECURITY INTEREST Recorded Dec 7, 2017
From: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
To: HUNTINGTON INGALLS INCORPORATED (F/K/A NORTHROP GRUMMAN SHIPBUILDING, INC.)
Reel/Frame 044734/0227 →
CERTIFICATE OF RESTATEMENT Recorded Oct 3, 2011
From: NORTHROP GRUMMAN SHIPBUILDING, INC.
To: HUNTINGTON INGALLS INCORPORATED
Reel/Frame 027003/0129 →
SECURITY AGREEMENT Recorded Mar 30, 2011
From: NORTHROP GRUMMAN SHIPBUILDING, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 026064/0593 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 4, 2011
From: INGALLS SHIPBUILDING, INC.
To: NORTHROP GRUMMAN SHIPBUILDING, INC.
Reel/Frame 025577/0429 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 3, 2008
From: DUSANG, LOUIS V., JR.; ROBERTS, JEFFREY B.
To: NORTHROP GRUMMAN SHIP SYSTEMS, INC.
Reel/Frame 021633/0011 →