IP Library Granted Patent US 8,141,509
Granted Patent B2
US 8,141,509 · App. 12/271,578 · Granted Mar 27, 2012

Subsea salvage operation using lifting magnet

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,141,509
App. No.
12/271,578
Granted
Mar 27, 2012
Kind
B2
Abstract

Embodiments of the present invention generally relate to a subsea salvage operation using a lifting magnet. In one embodiment, a method of salvaging a submerged production platform includes deploying a salvage vessel to a wreckage site of the submerged production platform; lowering a lifting magnet from the salvage vessel to the submerged production platform; and activating the lifting magnet, thereby capturing at least a portion of the submerged production platform.

Claims (19)

1. A method of salvaging a submerged production platform, comprising:

deploying a salvage vessel to a wreckage site of the submerged production platform;

dispatching a diver or remotely operated vehicle (ROV) from the salvage vessel to the submerged production platform;

cutting the submerged production platform into manageable pieces by the diver or ROV;

lowering a lifting electromagnet from the salvage vessel to the submerged production platform using a crane of the salvage vessel, wherein the lifting electromagnet comprises:

a case having a cavity formed therein,

a winding made from a conductive material and disposed in the cavity,

a bottom made from a non-magnetic material and welded to the case, thereby making the cavity watertight, and

a watertight terminal connector for receiving an electric cable;

activating the lifting electromagnet, thereby capturing one or more of the manageable pieces; and

raising the captured pieces to a surface of the sea using the crane.

2. The method of claim 1 , further comprising cutting a casing assembly at or near a floor of the sea by the diver or ROV.

3. The method of claim 1 , further comprising:

positioning the captured pieces over a scrap vessel using the crane; and

deactivating the lifting electromagnet, thereby releasing the captured pieces on to the scrap vessel.

4. The method of claim 1 , further comprising deploying a subsea camera from the salvage vessel to the submerged production platform, wherein an operator of the lifting electromagnet is in visual communication with the camera.

5. The method of claim 1 , further comprising tracking a location of the lifting electromagnet relative to the submerged platform using an acoustic signal.

6. The method of claim 1 , further comprising repeating the lowering, activating, and raising, steps until the wreckage site is free of magnetic debris.

7. The method of claim 2 , further comprising repeating the lowering, activating, and raising steps for the cut portion of the casing assembly.

Assignments (2)
SECURITY INTEREST Recorded Feb 25, 2016
From: INTEGRATED PRODUCTION SERVICES, INC.; SUPERIOR ENERGY SERVICES, L.L.C.; SUPERIOR ENERGY SERVICES-NORTH AMERICA SERVICES, INC.; WARRIOR ENERGY SERVICES CORPORATION; WILD WELL CONTROL, INC.
To: JPMORGAN CHASE BANK, N.A. AS ADMINISTRATIVE AGENT
Reel/Frame 037927/0088 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2008
From: HOFFMAN, COREY EUGENE; CAFFAREL, THEODORE WADE
To: WILD WELL CONTROL, INC.
Reel/Frame 021956/0839 →