US 7,722,756 · App. 12/274,035 · Granted May 25, 2010

Process for multiple stage direct electrowinning of copper

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,722,756
App. No.
12/274,035
Granted
May 25, 2010
Kind
B2
Abstract

A system and process for recovering copper from a copper-containing ore, concentrate, or other copper-bearing material to produce high quality cathode copper from a leach solution without the use of copper solvent/solution extraction techniques or apparatus. A process for recovering copper from a copper-containing ore generally includes the steps of providing a feed stream containing comminuted copper-containing ore, concentrate, or other copper-bearing material, leaching the feed stream to yield a copper-containing solution, conditioning the copper-containing solution through one or more physical or chemical conditioning steps, and electrowinning copper directly from the copper-containing solution in multiple electrowinning stages, without subjecting the copper-containing solution to solvent/solution extraction prior to electrowinning.

Claims (16)

1. A method of recovering copper from a copper-bearing material, comprising the steps of:

subjecting a feed stream comprising a copper-containing material and an acid to pressure leaching at a temperature of from about 100° C. about 250° C. to yield a product slurry comprising a copper-bearing solution and a residue;

electrowinning copper from at least a portion of said copper-bearing solution in a first electrowinning stage to produce copper cathode and a first stage lean electrolyte stream;

electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage to produce copper cathode and a second stage lean electrolyte stream; and

recycling at least a portion of said first stage lean electrolyte stream to said pressure leaching step.

2. The method of claim 1 , wherein said feed stream in said step of subjecting comprises at least one of a copper-bearing sulfide ore, a concentrate, and a precipitate.

3. The method of claim 1 , wherein said feed stream in said step of subjecting comprises at least one of chalcopyrite, chalcocite, bornite, covellite, digenite, enargite, or mixtures or combinations thereof.

4. The method of claim 1 , further comprising the step of separating at least a portion of said copper-containing material from said acid in said feed stream to yield a copper-containing feed stream comprising a copper-bearing material.

5. The method of claim 4 , wherein said separating step comprises reacting at least a portion of the copper in a copper-containing electrolyte stream to precipitate at least a portion of said copper in said copper-containing electrolyte stream as copper sulfide in said feed stream.

6. The method of claim 4 , wherein said separating step comprises reacting at least a portion of the copper in a copper-containing electrolyte stream in the presence of sulfur dioxide, whereby at least a portion of said copper in said copper-containing electrolyte stream precipitates as copper sulfide in said feed stream.

7. The method of claim 1 , wherein said pressure leaching of said subjecting step comprises pressure leaching said feed stream in the presence of a surfactant selected from the group consisting of lignin derivatives, orthophenylene diamine, alkyl sulfonates, and mixtures thereof.

8. The method of claim 1 , wherein said pressure leaching of said subjecting step comprises pressure leaching said feed stream in the presence of a surfactant in an amount of from about 2 to about 20 kilograms per tonne of concentrate in the copper-containing feed stream.

9. The method of claim 1 , wherein said step of electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage comprises electrowinning copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

10. The method of claim 4 , wherein said step of electrowinning copper from at least a portion of said first stage lean electrolyte stream in a second electrowinning stage comprises electrowinning copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

11. The method of claim 1 , further comprising the step of using a portion of said second stage lean electrolyte stream in a leaching operation.

12. The method of claim 4 , further comprising the step of recycling a portion of said second stage lean electrolyte stream to said separating step.

Assignments (4)
CHANGE OF NAME Recorded Jul 23, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT MINERALS CORPORATION
Reel/Frame 033389/0300 →
MERGER Recorded Jul 17, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 033357/0849 →
CHANGE OF NAME Recorded Jul 30, 2009
From: PHELPS DODGE CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 023015/0851 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 19, 2008
From: MARSDEN, JOHN O; BREWER, ROBERT E; ROBERTSON, JOANNA M; BAUGHMAN, DAVID R; THOMPSON, PHILIP; HAZEN, WAYNE W; BEMELMANS, CHRISTEL M.A.
To: PHELPS DODGE CORPORATION
Reel/Frame 021862/0082 →