IP Library Granted Patent US 8,039,118
Granted Patent B2
US 8,039,118 · App. 12/312,885 · Granted Oct 18, 2011

Welded steel pipe for high strength line pipe superior in low temperature toughness and method of production of the same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,039,118
App. No.
12/312,885
Granted
Oct 18, 2011
Kind
B2
Abstract

The present invention provides high strength welded steel pipe for line pipe inexpensive in cost and superior in low temperature toughness, and a method of production of the same, produced by forming a base material steel plate containing, by mass %, C: 0.010 to 0.050%, Si: 0.01 to 0.50%, Mn: 0.50 to 2.00%, S: 0.0001 to 0.0050%, and Ti: 0.003 to 0.030%, limiting Al to 0.020% or less and Mo to less than 0.10%, having a carbon equivalent Ceq of 0.30 to 0.53 and a crack susceptibility parameter Pcm of 0.10 to 0.20, comprised of polygonal ferrite and residual bainite of an area rate of 20% or less, and having an effective crystal grain size of 20 μm or less, into a pipe shape, then seam welding it and making the effective crystal grain size of the heat affected zone 150 μm or less.

Claims (85)

1. High strength welded steel pipe for line pipe superior in low temperature toughness, the high strength welded steel pipe comprising steel pipe obtained by seam welding a base material steel plate formed into a pipe shape, wherein said base material steel plate comprises, by mass %,

C: 0.010 to 0.050%,

Si: 0.01 to 0.50%,

Mn: 0.50 to 2.00%,

S: 0.0001 to 0.0050%,

Ti: 0.003 to 0.030%,

O: 0.0001 to 0.0080%,

B: 0.0003 to 0.0030%, and

a balance of iron and unavoidable impurities, wherein P, Al, and Mo are present at most as impurities, and

P is limited to 0.050% or less,

Al is limited to 0.020% or less, and

Mo is limited to less than 0.10%, and wherein

Ceq found from the formula,

C eq =C+Mn/6+(Ni+Cu)/15+(Cr+Mo+V)/5,

is 0.30 to 0.53,

Pcm found by the formula,

P cm =C+Si/30+(Mn+Cu+Cr)/20+Ni/60+Mo/15+V/10+5B,

is 0.10 to 0.20, wherein C, Si, Mn, Ni, Cu, Cr, Mo, V, and B are the amounts of the individual elements in mass %, and wherein

a metal structure of said base material steel plate has a polygonal ferrite area ratio of no more than 20%,

a bainite area ratio of at least 80%,

an effective crystal grain size of no more than 20 μm, and

an effective crystal grain size in a weld heat affected zone of no more than 150 μm.

2. The high strength welded steel pipe as set forth in claim 1 , wherein the base material steel plate has a thickness of 25 to 40 mm.

3. The high strength welded steel pipe as set forth in claim 1 , wherein said base material steel plate has a tensile strength measured using a circumferential direction of said steel pipe as the tension direction of 600 to 800 MPa.

4. The high strength welded steel pipe as set forth in claim 1 , wherein said base material steel plate further comprises, by mass %, one or both of

Cu: 0.05 to 1.50% and

Ni: 0.05 to 5.00%.

5. The high strength welded steel pipe as set forth in claim 1 , wherein said base material steel plate further comprises, by mass %, one or more of

Cr: 0.02 to 1.50%,

V: 0.010 to 0.100%,

Nb: 0.001 to 0.200%,

Zr: 0.0001 to 0.0500%, and

Ta: 0.0001 to 0.0500%.

6. The high strength welded steel pipe as set forth in claim 1 , wherein said base material steel plate further comprises, by mass %, one or more of

Mg: 0.0001 to 0.0100%,

Ca: 0.0001 to 0.0050%,

REM: 0.0001 to 0.0050%,

Y: 0.0001 to 0.0050%,

Hf: 0.0001 to0.0050%,

Re: 0.0001 to 0.0050%, and

W: 0.01 to 0.50%.

7. The high strength welded steel pipe as set forth in claim 1 , wherein the steel pipe further comprises a weld metal, the weld material comprising, by mass %,

C: 0.010 to 0.100%,

Si: 0.01 to 0.50%,

Mn: 1.0 to 2.0%,

Al: 0.001 to 0.100%,

Ti: 0.003 to 0.050%,

O: 0.0001 to 0.0500%, and a balance of iron and unavoidable impurities, wherein P and S are present at most as impurities, and

P is limited to 0.010% or less and

S is limited to 0.010% or less.

8. The high strength welded steel pipe as set forth in claim 7 , said weld metal further comprising, by mass %, one or both of

Ni: 0.2 to 3.2% and

Cr+Mo+V:0.2 to 2.5%.

9. A method of production of high strength welded steel pipe for line pipe superior in low temperature toughness, the method comprising:

adding deoxidizing agents, comprising Si and Mn, before casting the steel,

then adding Ti to form a steel composition

casting the steel composition, forming a steel slab,

hot rolling the steel slab, forming a steel plate, and

forming the steel plate into a pipe shape having seam portions, and

seam welding the seam portions; wherein, after adding the Ti, the steel comprises, by Mass %,:

C: 0.010 to 0.050%,

Si: 0.01 to 0.50%,

Mn: 0.50 to 2.00%,

S: 0.0001 to 0.0050%,

Ti: 0.003 to 0.030%,

O: 0.0001 to 0.0080%,

B: 0.0003 to 0.0030%, and

a balance of iron and unavoidable impurities, wherein P, Al, and Mo are present at most as impurities, and

P is limited to 0.050% or less,

Al is limited to 0.020% or less, and

Mo is limited to less than 0.10%, and wherein

Ceq found from the formula

C eq =C+Mn/6+(Ni+Cu)/15+(Cr+Mo+V)/5

is 0.30 to 0.53,

Pcm found from the formula

P cm =C+Si/30+(Mn+Cu 30 Cr)/20+Ni/60+Mo/15+V/10+5B

is 0.10 to 0.20, wherein C, Si, Mn, Ni, Cu, Cr, Mo, V, and B are the amounts of the individual elements in mass %.

10. The method of production of high strength welded steel pipe as set forth in claim 9 , further comprising heating said steel slab to a temperature of at least 1000° C., hot rolling the heated steel to obtain a rolling ratio in the pre-recrystallization temperature region of 2.5 or more, and water cooling to a temperature of no more than 600° C.

11. The method of production of high strength welded steel pipe as set forth in claim 9 , further comprising forming said steel plate into a pipe shape by a UO process, welding seam portions from inner and outer surfaces by submerged arc welding using welding wire and a firing type or molten type flux, and then expanding the pipe.

12. The method of production of high strength welded steel pipe as set forth in claim 11 , wherein said submerged arc welding provides a heat input of 4.0 to 10.0 kJ/mm.

13. The method of production of high strength welded steel pipe as set forth in claim 9 , further comprising heat treating the seam weld zone.

14. The method of production of high strength welded steel pipe as set forth in claim 13 , further comprising heat treating the seam weld zone in a temperature range of 300° to 500° C.

15. The method of production of high strength welded steel pipe as set forth in claim 9 , wherein said base material steel plate further comprises, by mass %, one or both of Cu: 0.05 to 1.50% and Ni: 0.05 to 5.00%.

16. The method of production of high strength welded steel pipe as set forth in claim 9 , wherein said base material steel plate further comprises, by mass %, one or more of Cr: 0.02 to 1.50%, V: 0.010 to 0.100%, Nb: 0.001 to 0.200%, Zr: 0.0001 to 0.0500%, and Ta: 0.0001 to 0.0500%.

17. The method of production of high strength welded steel pipe as set forth in claim 9 , wherein said base material steel plate further comprises, by mass %, one or more of Mg: 0.0001 to 0.0100%, Ca: 0.0001 to 0.0050%, REM: 0.0001 to 0.0050%, Y: 0.0001 to 0.0050%, Hf: 0.0001 to 0.0050%, Re: 0.0001 to 0.0050%, and W: 0.01 to 0.50%.

Assignments (3)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
MERGER Recorded Mar 3, 2017
From: NIPPON STEEL CORPORATION
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 041450/0098 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2009
From: HARA, TAKUYA; ASAHI, HITOSHI
To: NIPPON STEEL CORPORATION
Reel/Frame 022782/0512 →