IP Library Granted Patent US 7,669,423
Granted Patent B2
US 7,669,423 · App. 12/320,403 · Granted Mar 2, 2010

Operating method for CAES plant using humidified air in a bottoming cycle expander

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,669,423
App. No.
12/320,403
Granted
Mar 2, 2010
Kind
B2
Abstract

A power generation system includes a combustion turbine assembly ( 11 ) having a main compressor ( 12 ) receiving ambient inlet air, a main expansion turbine ( 14 ), a main combustor ( 16 ), and an electric generator ( 15 ) for generating electric power. An air storage ( 18′ ) has a volume for storing compressed air. A source of humidity ( 23, 34, 42 ) humidifies the compressed air that exits the air storage and thus provides humidified compressed air. A heat exchanger ( 24 ) receives a source of heat and the humidified compressed air so as to heat the humidified compressed air. A air expander ( 30 ) expands the heated, humidified compressed air to exhausted atmospheric pressure for producing additional power, and permits a portion of airflow expanded by the air expander to be injected into the combustion turbine assembly for power augmentation. An electric generator ( 31 ) is associated with the air expander for producing additional electrical power. The compressed air humidification reduces the compressed air storage volume for the same stored/generated energy.

Claims (15)

1. A method of reducing a volume of an air storage of a compressed air energy storage (CAES) power generation system having a combustion turbine assembly including a main compressor constructed and arranged to receive ambient inlet air, a main expansion turbine operatively associated with the main compressor, at least one combustor constructed and arranged to receive and preheat compressed air from the main compressor and to feed the main expansion turbine, and an electric generator associated with the main expansion turbine for generating electric power, the method including:

releasing compressed air from an air storage,

humidifying the compressed air released from the air storage,

heating the humidified compressed air using exhaust heat from the combustion turbine assembly,

expanding the heated, humidified compressed air in an air expander that is separate from the combustion turbine assembly, the air expander being constructed and arranged to permit a portion of airflow expanded by the air expander to be extracted and injected, under certain conditions, into the combustion turbine assembly for power augmentation, and

generating, via an electric generator that is separate from the generator of the combustion turbine assembly, additional electric power using air expanded through the air expander,

wherein humidifying the compressed air enables a volume of compressed air stored in the air storage to be reduced as compared to a volume thereof absent the humidifying step.

2. The method of claim 1 , wherein the system is constructed and arranged to provide a net total power of about 5-25 MW and the method includes using a pressure vessel or piping as the compressed air storage.

3. The method of claim 1 , wherein a saturator humidifies the compressed air.

4. The method of claim 1 , wherein a heat recovery steam generator humidifies the compressed air.

5. The method of claim 1 , wherein steam from a source external from the system humidifies the compressed air.

6. The method of claim 1 , wherein the step of humidifying ensures that a volume of the air storage can be reduced by a factor of about 1.5 to 2.5 as compared to a volume of an air storage in a second system that does not humidify the compressed air released, when the system and the second system produce substantially the same net total power and have the same stored/generated energy.

7. The method of claim 1 , wherein the heating step includes using exhaust air from the main expansion turbine as a source of heat.

8. The method of claim 1 , wherein the portion of the airflow is injected upstream of the main combustor.

9. The method of claim 1 , wherein all or the portion of the airflow is mixed with inlet air of the main compressor.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 16, 2012
From: ENERGY STORAGE AND POWER, LLC; NAKHAMKIN, MICHAEL
To: DRESSER-RAND COMPANY
Reel/Frame 029134/0550 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 16, 2010
From: NAKHAMKIN, MICHAEL, DR.
To: ENERGY STORAGE AND POWER LLC
Reel/Frame 024990/0841 →
Continuity (5)
Continuation In Part 1228540400 · Oct 3, 2008
Continuation In Part 1221691100 · Jul 11, 2008
Continuation 1207668900 · Mar 21, 2008
Division 1165766100 · Jan 25, 2007
Related Publication 20090178384A1 · Jul 16, 2009