IP Library Granted Patent US 7,908,842
Granted Patent B2
US 7,908,842 · App. 12/326,519 · Granted Mar 22, 2011

Method for operating a gas turbine, method of operation of a combined cycle power plant, and combined cycle power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,908,842
App. No.
12/326,519
Granted
Mar 22, 2011
Kind
B2
Abstract

In a method for operating a gas turbine (GT) with sequential combustion, which has at least one compressor ( 12, 13 ), a first combustion chamber ( 14 ) with a first turbine ( 15 ) which is connected downstream, and a second combustion chamber ( 16 ) with a second turbine ( 17 ) which is connected downstream, the at least one compressor ( 12, 13 ) draws in air and compresses it. The compressed air is fed to the first combustion chamber ( 14 ) for combusting a first fuel, and the gas which issues from the first turbine ( 15 ) is fed to the second combustion chamber ( 16 ) for combusting a second fuel. Increased flexibility and safety in operation is achieved by different fuels being used as first and second fuel.

Claims (45)

1. A method for operating a gas turbine with sequential combustion, the gas turbine having at least one compressor, a first combustion chamber, a first turbine connected downstream of the first combustion chamber, a second combustion chamber, and a second turbine connected downstream of the second combustion chamber, the method comprising:

drawing in and compressing air with the at least one compressor;

feeding the compressed air to the first combustion chamber and combusting a first fuel in the first combustion chamber;

feeding gas from the first turbine to the second combustion chamber and combusting a second fuel in the second combustion chamber;

wherein said first and second fuels are different fuels, wherein at least one of the first combustion chamber and the second combustion chamber comprises a plurality of groups of burners, and wherein at least one of the first fuel and the second fuel is oil; and

operating different burner groups inside at least one of the first and second combustion chambers with different fuels.

2. A method for operating a combined cycle power plant, the power plant including a gas turbine, the method comprising:

gasifying a source material in the combined cycle power plant to form syngas;

operating the gas turbine as claimed in claim 1 ; and

introducing said syngas into at least one of the first fuel and second fuel.

3. A method for operating a gas turbine with sequential combustion, the gas turbine having at least one compressor, a first combustion chamber, a first turbine connected downstream of the first combustion chamber, a second combustion chamber, and a second turbine connected downstream of the second combustion chamber, the method comprising:

drawing in and compressing air with the at least one compressor;

feeding the compressed air to the first combustion chamber and combusting a first fuel in the first combustion chamber;

feeding gas from the first turbine to the second combustion chamber and combusting a second fuel in the second combustion chamber;

wherein said first and second fuels are different fuels, wherein at least one of the first combustion chamber and the second combustion chamber comprises a plurality of groups of burners;

operating different burner groups inside at least one of the first and second combustion chambers with different fuels;

wherein said gas turbine has a base load; and

starting the gas turbine comprising:

(a) operating the first combustion chamber first with said first fuel and with an auxiliary fuel selected from the group consisting of natural gas and liquid fuel, until the gas turbine has achieved a predetermined part of said base load; and

(b) thereafter operating the second combustion chamber with syngas as the second fuel until the base load is achieved.

4. The method as claimed in claim 3 , wherein said liquid fuel is oil.

5. The method as claimed in claim 3 , wherein said predetermined part of the base load is about 33% of the base load.

6. The method as claimed in claim 3 , further comprising:

during said step (b), switching over said operating of the first combustion chamber to operating with syngas.

7. A method for operating a gas turbine with sequential combustion, the gas turbine having at least one compressor, a first combustion chamber, a first turbine connected downstream of the first combustion chamber, a second combustion chamber, and a second turbine connected downstream of the second combustion chamber, the method comprising:

drawing in and compressing air with the at least one compressor;

feeding the compressed air to the first combustion chamber and combusting a first fuel in the first combustion chamber;

feeding gas from the first turbine to the second combustion chamber and combusting a second fuel in the second combustion chamber;

wherein said first and second fuels are different fuels, and wherein at least one of the first combustion chamber and the second combustion chamber comprises a plurality of groups of burners;

operating different burner groups inside at least one of the first and second combustion chambers with different fuels;

wherein said gas turbine has a base load, and wherein the second combustion chamber includes a plurality of groups of burners; and

starting the gas turbine comprising:

(a) operating the first combustion chamber first with said first fuel and with an auxiliary fuel selected from the group consisting of natural gas and liquid fuel until the gas turbine has achieved a predetermined part of the base load;

(b) thereafter operating the second combustion chamber with a combination of syngas and an auxiliary fuel selected from the group consisting of natural gas and liquid fuel, including combusting the syngas and the auxiliary fuel in different burner groups; and

(c) thereafter operating the second combustion chamber entirely with syngas.

8. The method as claimed in claim 7 , wherein said liquid fuel is oil.

9. The method as claimed in claim 7 , wherein said predetermined part of the base load is about 33% of the base load.

10. A combined cycle power plant with integrated gasification comprising:

a gasification unit having an outlet and being configured and arranged to produce syngas by gasification of a source material;

a gas turbine with sequential combustion, the gas turbine comprising at least one compressor, a first combustion chamber with a first turbine connected downstream of the first combustion chamber, and a second combustion chamber with a second turbine connected downstream of the second combustion chamber, and wherein the at least one compressor is configured and arranged to draw in and compress air and to feed the compressed air to the first combustion chamber for combusting a first fuel, and wherein the first turbine is in fluid communication with the second combustion chamber so that gas which issues from the first turbine is fed to the second combustion chamber for combusting a second fuel;

a fuel distribution device in fluid communication with at least one of the first combustion chamber and the second combustion chamber, the fuel distribution device being configured and arranged to distribute fuel to at least one of the first combustion chamber and the second combustion chamber; and

a fuel feed line configured and arranged to feed an auxiliary fuel, the fuel feed line and the gasification unit outlet being in fluid communication with the fuel distribution device.

11. The combined cycle power plant as claimed in claim 10 , wherein the fuel feed line is configured and arranged to feed natural gas or liquid fuel.

12. The combined cycle power plant as claimed in claim 10 , wherein at least one of the first combustion chamber and the second combustion chamber has a plurality of burner groups configured and arranged to be individually supplied with fuel; and

wherein the burner groups are in fluid communication with the fuel distribution device such that the burner groups can be selectively individually connected to the fuel feed line or to the gasification unit outlet by the fuel distribution device.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2017
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ANSALDO ENERGIA IP UK LIMITED
Reel/Frame 041731/0626 →
CHANGE OF NAME Recorded Mar 22, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 038216/0193 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 30, 2008
From: EROGLU, ADNAN; HELLAT, JAAN; GUETHE, FELIX; FLOHR, PETER
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 022039/0966 →